Key Takeaways
- Revenue hit by gas shock, recovery underway: FY26 revenue grew just 7% after a 15-17 day plant shutdown in March from a Qatar gas disruption; the plant restarted in April and Q1 FY27 is expected to normalize.
- Guidance bets on a sharp FY27 rebound: Management is guiding for 25% revenue growth and 14-15% EBITDA margins, calling the number conservative and open to revisiting it in H1.
- Welded pipe is the growth story: A second capex tranche of 8,000 metric tons was added to supply the full size range up to 16 inches, targeting data centres, HVAC and water treatment; production starts H2 FY27.
- Margins compressed on under-absorption, not pricing: EBITDA dipped as new capacity sat under-utilized during commissioning; a captive solar project and rising utilization are the planned recovery levers.
- What to watch next quarter: Whether the BHEL tender actually drops in July/August, the pace of welded trial runs, and any movement on the 217-day inventory overhang.
The Gas Disruption & Q4 Fallout
- What happened: PNG gas supply from Qatar was cut for 15-17 days in March due to the war situation, forcing a complete plant shutdown. Production volumes fell 40% and revenue missed an estimated INR 140 crores for the quarter.
- Industry-wide, not company-specific: The disruption hit the entire geography, not just Scoda, and the plant resumed operations in April, though gas prices remain elevated.
- Knock-on working capital effects: Inventory days shot up to 217 days as finished goods piled up during the shutdown; debtor days also rose 36% on supply chain disruption and longer payment cycles, especially for project orders shipped to the Middle East and Europe.
- LPG cost lag: Rising LPG prices increased production cost and hurt operating efficiency; these are being passed through to customers but with a lag.
Samarth Patel: "I think you don't have the correct information because currently the market trend is even the end-users who used to buy only hot extruded pipes have opened their procurement for hot pierced pipes as well."
FY27 Guidance & The Recovery Bet
- Top-line ambition: Management guided for 25% revenue growth in FY27 with 14% to 15% EBITDA margins, calling the revenue number conservative. The company will revisit the outlook in H1 FY27 given geopolitical uncertainty.
- Domestic/export mix target: The company is targeting a 40% export, 60% domestic revenue split going forward, covering both seamless and welded. Domestic growth could exceed 25%, with 20% as the conservative floor.
- Q1 FY27 normalization expected: All operational issues are expected to be resolved in Q1, though costs will run slightly higher. Seamless capacity is already running at full tilt for the current quarter with no technical challenges.
- Order book confidence: Management is confident of maintaining the current order book run rate, with orders arriving continuously every few months.
Samarth Patel: "We are basically on the conservative side regarding the revenue growth. Obviously, we are all working very hard that we do above that, we perform better than what we are giving you as a guideline."
Welded Pipe: The Growth Engine
- Why the second capex tranche: The original IPO-funded 13,000 metric ton welded facility only covered pipes up to 8 inches. Customers in data centres, HVAC, cooling systems and water treatment plants prefer a single supplier who can deliver the full size range up to 16 inches, so an additional 8,000 metric tons was approved, funded from internal accruals.
- Total welded capacity: 21,150 metric tons per annum by H1 FY28. Optimum utilization for the combined welded capacity is expected in FY29.
- Timeline slippage: The high-diameter welded capex was delayed from its original Q3 FY27 target because machines from China were held up by the geopolitical situation. Equipment delivery is now expected in July-August, with trial runs targeted by end of Q2 FY27 and production starting in H2.
- Data centre order timeline: Order book from data centre clients is expected in the last quarter of FY27, with 20% to 25% growth anticipated from that segment once welded pipes are added.
- FY27 welded utilization: Only ~25% of installed welded capacity is expected to be used in FY27, reflecting the H2 start and ramp-up phase.
Samarth Patel: "The challenge which we probably were going to face earlier was that we were only able to supply up to 8 inches and the customer would usually prefer a supplier who is able to supply the whole size range, that is up to 16 inches."
Domestic Demand Catalysts
- Power sector tender: BHEL's next tender, originally expected in Nov/Dec and then March/April, is now anticipated in July or August. Scoda is already approved with BHEL and NTPC and awaiting the new tender. The tender may be amended due to BHEL's work pressure and backlogs.
- Procurement policy shift: End-users like BHEL and BARC, which historically bought only hot extruded pipes, have now opened procurement to hot pierced pipes as well, expanding Scoda's addressable market. [16-17]
- BARC collaboration: The company is working closely with BARC and has multiple projects in the order book.
- Data centre capex tailwind: Government capex and major private players like Adani and Reliance are driving potential demand expansion in the data centre sector, where welded pipes are used.
Margins, Costs & The Balance Sheet
- Why EBITDA dipped: Under-absorbed fixed costs from lower utilization of newly commissioned capacity dragged operating profitability in FY26. The expanded capacities were still in the commissioning and stabilization phase.
- Gross margin bright spot: Despite the top-line disruption, the company significantly expanded gross margins in FY26, which management says provides a strong foundation for scaling new capacity.
- Solar savings: A new captive solar project is expected to generate 1.37 crore KWH annually, saving INR 8.63 crores per year in electricity costs (INR 4.9 crores for the seamless plant, INR 3.8 crores for welded), improving EBITDA margins by reducing grid dependence.
- Raw material pass-through: Stainless steel base material prices rose 25% to 30% due to geopolitics and scrap import costs; these are carried forward to customers when orders are booked.
- Debt trajectory: Debt will increase by approximately INR 50 crores to fund the welded and solar capex, peaking at INR 250 crores, and will be reduced after capacity is fully utilized. No further equity dilution is planned.
- Inventory days target: Management is targeting a reduction to 160 days in FY27, with a 160-170 day range expected for future years.
- Seamless utilization path: ~70% of installed seamless capacity is expected in FY27, with optimum utilization in FY28.
The European Acquisition That Wasn't
- Deal cancelled: The planned investment in a European acquisition was withdrawn due to operational and cross-border remittance challenges from India, spanning regulatory compliance, banking, forex and execution feasibility.
- Trade barrier math killed the rationale: Europe's import quota is being reduced by 50% from July 1, and safeguard duty is increasing from 25% to 50%, which management said eliminated any benefit from setting up there.
Samarth Patel: "The import quota is expected from 1st of July in Europe. The benefit of setting up a company there was diminished because of the quota, which is being reduced by 50% in Europe and the safeguard duty is increased from 25% to 50%. So, it doesn't make any sense that we would get any benefit because of that."
What Management Won't Disclose
- Volume data off-limits: Management declined to share sales and production volumes across seamless, welded and mother hollow segments, citing competitive reasons. The same rationale was given for refusing utilization rates, EBITDA per ton, average realization per ton, and the quantity-wise order book breakup between seamless and welded.
- BHEL order size unknown: Management deflected a question on the expected BHEL order size, noting the tender is not yet out and may be amended.
- Power-sector demand metrics unavailable: The company does not have data on pipe and tube demand per gigawatt of power sector capex.
- Quarterly calls under consideration: Management said it will discuss internally a request to hold quarterly calls and disclose new orders to exchanges.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | 25% growth (conservative; revisit in H1) | FY27 |
| EBITDA margin | 14% to 15% | FY27 |
| Welded facility operational | Equipment delivery Jul-Aug; trial runs by end Q2; production H2 | FY27 |
| Total welded capacity | 21,150 metric tons per annum | H1 FY28 |
| Mother hollow captive | Fully captive | FY28 |
| Seamless optimum utilization | Full utilization | FY28 |
| Welded optimum utilization | Full utilization (13,000 + 8,000 MT) | FY29 |
| Inventory days | Reduce to 160 days; 160-170 range thereafter | FY27 |
| Peak debt | INR 250 crores | During capex phase |
| Export/domestic mix | 40% export, 60% domestic | Going forward |
| Solar project savings | INR 8.63 crores per year | Annual, from commissioning |
| BHEL tender participation | Tender expected July or August (may be amended) | Jul/Aug FY27 |
| Data centre order book | Orders expected | Last quarter FY27 |
| Rina Marine approval | Final stage; expected within 3-4 weeks | Q1 FY27 |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue | ₹123.6 cr, broadly flat YoY; FY26 revenue ₹518.7 cr, +7% YoY |
| Revenue without gas disruption | ~₹140 cr would have been achievable, per management |
| EBITDA | ₹16.7 cr, margin 13.5% vs 14.1% in Q4 FY25 |
| EBITDA margin (FY26) | 14.7%, vs 16.1% in FY25; under-absorbed fixed costs from new capacity |
| PAT | ₹6.3 cr, -7% YoY; margin 5.1% vs 5.5% in Q4 FY25 |
| PAT (FY26) | ₹38.8 cr, +22% YoY; margin 7.5% vs 6.5% in FY25 |
| FY27 revenue growth guidance | 25%, with 14% to 15% EBITDA margins; conservative, may revisit in H1 FY27 |
| Export revenue share | 44.8% of total revenue in Q4 FY26; FY26 share 34.6% |
| Order book | ₹175 cr, executable over 3 to 4 months |
| Seamless capacity utilization (FY27 expected) | ~70% of 20,000 MT installed capacity |
| Welded capacity utilization (FY27 expected) | ~25% of 13,000 MT installed capacity |
| Inventory days | 217 days in FY26, elevated due to plant shutdown; targeting 160 days in FY27 |
| Capex incurred (FY26) | ₹110 cr; net block of fixed assets ₹194.4 cr, CWIP ₹8.8 cr as of March 31 |
| FY27 expected capex outflow | ~₹100 cr addition |
| Peak debt (FY27 expected) | ~₹250 cr, increase of ₹50 cr from current levels |
| Production volume impact from gas disruption | 40% reduction in March due to 15–17 day plant shutdown |
| Power and fuel cost | 17% to 18% of total expenses; gas prices increased ~25% |
| Solar project annual savings | ₹8.63 cr total (₹4.9 cr seamless, ₹3.8 cr welded) from 8.79 MW DC capacity |
| IPO proceeds deployed | ₹27 cr towards capex, ₹50 cr towards working capital; ₹74.2 cr remaining in bank balance as of H2 FY26 |
| Receivables growth | 36% increase, while FY26 revenue grew 7%; attributed to supply chain disruptions and longer payment cycles |