Key Takeaways
- Revenue up 38% YoY, margins still squeezed: Q1 FY27 revenue grew 37.9% YoY on strong solar pump execution, but EBITDA margin stayed at ~10% for the second straight quarter as raw material costs and lower realizations bit.
- The order book is the near-term anchor: A ₹1,000 crores order book, recently topped up by a ₹350 crores Maharashtra win, gives clear revenue visibility for the next two quarters.
- Backward integration is the margin thesis: Management expects a 3% EBITDA margin expansion once its 0.5 GW and 2.2 GW solar cell and module plants come online, turning the company into a fully integrated pump-to-panel player.
- KUSUM 2.0 is the big, undated catalyst: The scheme is ready and awaiting PMO clearance; orders could start flowing by the end of this quarter, but the timeline is entirely in the government's hands.
- What to watch next quarter: Whether KUSUM 2.0 actually launches and starts converting into orders, any easing in stainless steel and copper prices that could lift margins, and progress on the 0.5 GW solar plant ahead of its September 2026 deadline.
Margin Pressure: The Raw Material Story
- A 10-point YoY EBITDA drop: Margins fell from ~20% to ~10% YoY, with management attributing roughly 6 percentage points to higher raw material costs and 4 percentage points to lower sales price realization.
- External and temporary, not structural: Management views the raw material inflation as industry-wide and driven by the geopolitical situation, not a company-specific cost problem, and expects margins to improve gradually on a quarter-on-quarter basis as conditions normalize.
- No hedging, no peer benchmarking: The company is not taking any hedging positions on raw materials because it sees the situation as temporary, and management declined to analyze or comment on how peers maintained their margins.
- The tender pricing dynamic: Management pushed back on the idea that lower pricing wins orders, describing the business as a rate-contract model where the farmer is the key decision-maker, so cutting rates does not automatically translate into higher order wins for any company.
Patidar: "Absolutely, absolutely. Raw material prices are well-known, you also know the price of the dollar, and you also know other things. So, definitely, margin correction will come, we hope that it will definitely come."
The Backward Integration Bet
- From pump maker to integrated solar player: The company is investing in a 0.5 GW DCR module facility (commissioning September 2026) and a 2.2 GW integrated DCR cell and module plant (September 2027), aiming to become the only fully integrated rooftop service provider in the country.
- The 3% margin math: Once total capacity is commissioned, management expects a 3% expansion in EBITDA margins, with the company fully integrated for both the solar rooftop business and the solar pump business.
- Captive demand absorbs the capacity: Management believes the 2 GW capacity will be largely absorbed by captive consumption, exports, and the domestic market, with export customers already asking for Shakti-branded panels.
- Rooftop business targets 15% EBITDA margins: With in-house modules and cells, the rooftop segment is targeting ~15% EBITDA margins, though management declined to disclose current rooftop revenues or margins.
- Total capex of ₹1,500–₹1,700 crores by September 2027: Roughly ₹800 crores will be spent this year and the remainder next year, funded through a mix of term loans (₹800 crores for the 2.2 GW project), two completed QIPs, and working capital arrangements with ~10 Indian banks and one Qatar bank for ~₹1,800 crores.
Patidar: "Our customers are increasingly requiring the whole set. Even for a home installation, preference would be for a Shakti panel, Shakti inverter, Shakti pump, and controller as a complete solution."
Order Book & Near-Term Visibility
- ₹1,000 crores order book, executable in two quarters: The current order book, maintained with the help of a recent ₹350 crores Maharashtra order, can be comfortably executed over the next two quarters, giving clear near-term revenue visibility.
- Execution run rate has been strong: Over the last two quarters, the company has demonstrated robust execution of existing orders, with solar pump installations growing 57.6% YoY in Q1.
- More Maharashtra orders in the pipeline: Another tender from Maharashtra is already under process, and management expects new orders from the existing pipeline to add to the current book.
- Ground-level risks to the run rate: While the focus remains on sustaining the current run rate, management cautioned that execution will depend on ground conditions with ongoing rains and floods.
KUSUM 2.0: The Waiting Game
- Ready, awaiting PMO clearance: PM KUSUM 2.0 is fully prepared for launch and could be announced as early as next week or next month, but the decision sits with the PMO and the timeline is outside the company's control.
- Orders expected by end of this quarter: Management expects KUSUM 2.0 orders to start coming in by the end of the current quarter, following which orders from other states should also begin to flow in.
- Higher-HP demand emerging: States like Haryana and Punjab are seeing requirements for larger pumps entering the pipeline, which management believes will create a good business opportunity going forward.
- Feeder-level solarization as a demand driver: The government's push toward feeder-level solarization is expected to drive additional pump demand, though the company's role will be limited to changing pumps rather than installing panels.
Patidar: "PM KUSUM 2.0 is ready for launch and could be announced as early as next week or next month. It is currently with the PMO and awaiting clearance from there."
The ₹5,000 Crores Ambition & New Businesses
- ₹5,000 crores revenue target by FY29: Management is targeting a fivefold scale-up over three years, driven by an integrated portfolio spanning solar panels, solar pumps, EV components, structures, VFDs, and inverters, though it declined to provide a segment-wise breakup of the target.
- EV business still in validation: The EV segment is currently in the trial order and testing phase with new customers, a process management describes as inherently time-taking; meaningful revenue contribution is expected only from FY28 onwards, roughly 8–9 months out.
- Rooftop solar gaining traction: The solar rooftop business clocked ₹8 crores in revenue in Q1 FY27 versus ₹2 crores in Q1 FY26, with customers reporting ~10% better generation using Shakti inverters; the company has registered as a brand owner under the PM Surya Ghar Muft Bijli Yojana.
- Africa exports in negotiation: Following the successful completion of the Uganda pilot project, the company is in negotiations with other African countries, with updates promised when available.
- Demonstration projects in new markets: A 40 HP solar pump has been installed in Saudi Arabia and a 100 HP pump in Africa as demonstrations to create awareness and support future business growth.
Patidar: "We are making these investments with the goal of becoming a INR5,000 crores company over the next three years."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Order book execution | ₹1,000 crores order book comfortably executable | Next two quarters |
| KUSUM 2.0 orders | Orders expected to start coming in | By end of current quarter, following scheme launch |
| 0.5 GW DCR module facility | Commissioning and ramp-up: ~40–50% efficiency in month one, ~60–70% in month two, ~85% thereafter | September 2026 |
| 2.2 GW integrated DCR cell and module plant | Project completion | September 2027 |
| Pump plant capacity expansion | Completion | November 2026 |
| EBITDA margin expansion from backward integration | 3% expansion at EBITDA level once total capacity is commissioned | After total capacity is commissioned |
| Rooftop business EBITDA margin | ~15% with in-house modules and cells | No date; contingent on capacity commissioning |
| EV business meaningful contribution | Revenue to begin ramping up gradually after validation/testing phase | Next year onwards |
| Revenue ambition | ₹5,000 crores company-wide revenue | In the next three years |
| Total capex program | ₹1,500–₹1,700 crores, with ~₹800 crores in FY27 and remainder in FY28 | By September 2027 |
| Margin recovery trajectory | Gradual quarter-on-quarter improvement as geopolitical situation stabilizes and raw material prices ease | No quantified level or date |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue | ₹859 cr, +37.9% YoY from ₹623 cr in Q1 FY26 |
| EBITDA margin | 9.6%, broadly stable sequentially; down ~10 ppt YoY due to raw material costs and lower realizations |
| PAT | ₹52 cr, +35% over Q4 FY26 |
| PAT margin | 6%, up from 4.5% in Q4 FY26 |
| Solar pump installations | 27,678 pumps, +57.6% YoY from 17,557 pumps in Q1 FY26 |
| Realization per pump | ₹248,153, broadly flat QoQ from ₹248,374 in Q4 FY26; minor impact from sales mix |
| Order book | ~₹1,000 cr as of 22 July 2026, executable over the next two quarters |
| Cash and retail sales revenue | ₹24 cr, registering strong growth |
| Solar rooftop revenue | ₹8 cr, vs ₹2 cr in Q1 FY26 |
| Export order inflows | ~₹100 cr per quarter |
| Capacity utilization | 63% |
| Total outstanding receivables | ₹760 cr not yet due, ₹560 cr over 180 days, ₹477 cr retention amount |
| YoY EBITDA impact from raw material costs | ~₹36 cr, contributing ~6 ppt of margin compression |
| YoY EBITDA impact from lower sales price realization | ~₹25 cr, contributing ~4 ppt of margin compression |
| FY27 capex plan | ~₹800 cr, roughly 50% of total ₹1,500–₹1,700 cr capex plan through September 2027 |