Key Takeaways
- Export collapse hit rail hard: Gateway’s export volumes dropped over 15% QoQ, breaking the import-export balance, crippling double-stack operations, and diluting rail EBITDA per TEU despite higher realizations.
- Snowman’s distribution pivot is working: Trading & Distribution margins jumped from ~4.6% to 7.1% QoQ on client mix, while ASP rose 7% YoY; management expects 40-50% YoY growth in the store distribution model.
- Kashipur ICD is live, Jaipur is next: The Kashipur terminal funded by INR 60 crores of debt is now operational and expected to add ~3,000 TEUs per month in FY24; Jaipur is targeted for Q3 FY24 with a total cost of ₹90 crore.
- DFC is a slow-burn catalyst: A new 40 km stretch from New Rewari is now live, but the full JNPT connection is still a couple of years away; management sees the next leg of modal shift only when the full corridor is operational.
- What to watch next quarter: Whether the export slump that persisted through January shows any recovery, the pace of Kashipur’s volume ramp, and the FY24 guidance that management deferred citing macro uncertainty.
Gateway Rail: An Export-Driven Margin Squeeze
- Export volumes collapsed: Exports dropped over 15% QoQ, while imports increased a little, shifting the mix from a balanced 50-50 to roughly 60% imports and 40% exports.
- Double-stack economics broke: The export decline reduced the ability to run double-stack trains, which directly lowered EBITDA per TEU and increased cost per unit, even though import-heavy realizations improved 11% QoQ.
- Imports did not save margins: Higher import pricing was fully offset by increased imbalance costs from repositioning empty containers, so rail EBITDA per TEU did not rise despite the better realization.
- Operational disruptions compounded the damage: Track work, fog, and slower train running in December caused a ~7-8% throughput loss, with port pendency piling up to 3,000-3,500 TEUs because hubbing and double-stacking were reduced.
- Market share held steady: NCR market share rose to ~16% from ~12% a year ago, and Ludhiana held at ~35% despite a fifth ICD entering the market; overall rail volumes were flat.
- The export outlook remains bleak: Subdued conditions continued through January with no signs of pickup yet, though management hopes for some growth after this quarter.
Prem Kishan Dass Gupta: "If you look on a quarter-to-quarter basis, it is over 15% drop in the volumes of export. Imports have increased a little bit, but what happens is that because of this our double-stack ability comes down and because of that EBITDA per TEU also drops."
Snowman Logistics: Distribution Gains Traction
- Trading & Distribution margins jumped: Net margin improved from ~4.6% to 7.1% QoQ, driven entirely by mix change among the three existing clients, each carrying different margin profiles; management expects a sustainable average of ~5% as the business scales.
- ASP rose 7% YoY: Price hikes were achieved as agreements renewed; a similar increase is expected for FY24 with renewals starting from March.
- Store distribution model is the growth engine: Management expects 40% to 50% YoY growth in the store distribution model, and the Trading & Distribution revenue mix is expected to remain at 25% or grow further.
- Chemical warehousing partnership launched: A 55,000 sq ft best-in-class chemical handling warehouse is being set up in Shoolagiri near Bangalore with BDP, providing storage and distribution within a 300 km radius.
- Blended EBITDA margin target: Management expects anything upwards of 20% in coming quarters, with a similar revenue mix continuing.
- Prior aggressive targets disowned: When an analyst referenced earlier growth targets of ₹500-600 crore for Trading & Distribution, management responded, "I have no idea on these numbers," and did not confirm or address the prior target.
Sunil Nair: "We are expecting anywhere to the extent of 40% to 50% growth year-on-year in this store distribution model."
Gateway CFS: Stable but Flat
- CFS EBITDA held steady: Excluding Punjab Conware, which was present for the full Q3 of the prior year, CFS performance was stable despite the export volume decline.
- Volumes expected to stay flat: Management guided that CFS volumes reported in recent quarters will continue going forward into FY24, with no growth expected.
- Net debt to EBITDA spiked but is normalized: The ratio rose from 0.67 to 2.88 QoQ because internal accruals were used, decreasing cash, and INR 60 crores of debt was taken to finance the Kashipur transaction; management said the outlook is unchanged and the ratio will stay below 1 on an annual basis.
Infrastructure Expansion: Kashipur Live, Jaipur in Pipeline
- Kashipur ICD is operational: The terminal, funded via INR 60 crores of debt and internal accruals, had its first full month of operation in Q3 FY23; services for JNPT and Pipavav have started, with the company being the first to offer services from that location.
- Kashipur base volume guidance: Management expects ~3,000 TEUs per month for FY24, with full benefit of ~36,000 TEUs per annum to accrue in FY24; volumes will improve further if the overall market recovers.
- Jaipur ICD targeted for Q3 FY24: Total project cost is ₹90 crore, with land already acquired for ₹30 crore and ₹5-10 crore spent so far; significant contribution is expected only from FY25 due to slow ramp-up.
- Two more ICDs being finalized: These will sit along the Western DFC strategy, though they may not be directly on the DFC line but will connect to it.
- Rake procurement under evaluation: Management is weighing buying versus leasing, noting that the first rake purchased 15-16 years ago is still running and in good condition, with another 10 years of life expected; interest plus depreciation nearly equals lease cost, but the asset remains on the books.
Prem Kishan Dass Gupta: "The first rake that we had purchased in 15, 16 years back is still running and in good condition, and it will run for another good 10 years. So it's worth examining whether we should buy or whether we should lease it."
DFC: Incremental Progress, Distant Payoff
- A new 40 km stretch is live: The New Rewari section now provides shorter distance connectivity to Gateway's terminal, with DFC operations now starting from that section.
- Rewari to Dadri by end of 2023: That is the rough timeline for the next section; Dadri to Mundra connectivity is also expected by the end of 2023.
- The full JNPT connection is years away: Management estimates it will take a couple of years probably for the full corridor to reach JNPT, and the next level of modal shift from road to rail will only happen when the full DFC is operational.
- Railway empty container discount withdrawn: The railway withdrew the discount on running empty containers; Gateway is tying up with shipping lines and working on a cabotage model to reduce costs, while creating space to store shipping line empties for export use.
Samvid Gupta: "The next level will come when it's connected all the way to JNPT, when the full DFC is operational, basically, then that's when the next level of growth will come from -- shift from road to rail will happen."
Margin Targets & Cost Pressures
- Rail EBITDA per TEU target is ₹10,000: Management is aiming for this level with DFC and new terminals, assuming macro improvement; the near-term target is to get back to ₹9,500 very soon.
- Temporary Q4 dilution expected: Empty placement costs at Kashipur may dilute rail EBITDA per TEU in Q4, but similar or higher margins are expected from Q1 next year.
- Blended EBITDA per TEU target is ₹6,000: No specific timeline was given; management said it is doing everything to reach that number as soon as possible.
- Ludhiana scrap imports provide a cushion: Tata Steel's investment in Ludhiana is driving increased scrap imports, with Gateway gaining good market share; the scrap market is expected to remain stable for another three months.
Prem Kishan Dass Gupta: "We are aiming at INR 10,000 per TEU."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Gateway rail volumes FY23 | At least match last year with slight growth from Kashipur | FY23 full year |
| Kashipur base volumes | ~3,000 TEUs per month; ~36,000 TEUs per annum | FY24 |
| Jaipur ICD operational | Start of operations; slow ramp-up expected | Q3 FY24 |
| Capex FY24 | ~₹75 crore (Jaipur + maintenance, excluding two potential new ICDs) | FY24 |
| Snowman ASP increase FY24 | Similar to ~7% YoY achieved this year | FY24 renewals from March |
| Snowman Trading & Distribution growth | 40% to 50% YoY growth in store distribution model | FY24 |
| Rail EBITDA per TEU recovery | Back to ₹9,500 very soon; ₹10,000 target with DFC and macro improvement | Near-term / DFC-linked |
| Gateway net debt to EBITDA | Stay below 1 on an annual basis | FY23 full year |
| Full FY24 guidance | Deferred due to changed macroeconomic situation | Next quarter |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Revenue | ₹1,521 ASP per pallet per month, +7% YoY |
| Blended EBITDA margin | Upwards of 20%, expected to be maintained |
| Net debt | ₹86.57 cr, debt-equity ratio at 0.25% |
| Warehousing ASP increase | 7% YoY, renewals due from March onwards |
| Trading & Distribution revenue mix | 25% of total revenue, expected to remain 25% or grow further |
| Trading & Distribution net margin | 7.1%, up from ~4.6% QoQ; sustainable target ~5% as business scales |
| Trading & Distribution growth outlook | 40% to 50% YoY expected in store distribution model |
| BDP partnership warehouse | 55,000 sq ft in Shoolagiri, Tamil Nadu; expected top line ₹12 cr per annum at 12% margin |
| Pallet count | Increase YoY, exact figure to be provided later |