Key Takeaways
- Revenue surged, margins normalized: Q2 revenue grew 28.86% YoY to ₹136 crores, but operating EBITDA before ESOP rose only 0.43% YoY as gross margin reverted from an abnormal Q1 windfall to its regular profile.
- R32 plant on track for April production: A greenfield project targeting completion in a record 12 months, with trials by March and stabilized output by May, positioning Stallion to capture high-margin domestic and export demand.
- Quota-year dynamics are compressing near-term profits: Heavy selling pressure as competitors maximize imports ahead of the December 2026 quota calculation deadline is a bigger margin headwind than the Gulf crisis, but it sets up a dominant post-quota position.
- FY30 ambition set at ₹3,000 crores: Management sees a path to ₹2,500 crores-plus by FY30, driven by R32, HFO blends, helium, and post-quota margin expansion in the legacy business, with blended PAT margins reaching 15% or higher.
- What to watch next quarter: Whether the R32 plant begins trials by March as committed, the pace of working-capital consumption during the quota-year import surge, and any decision on the ₹200 crore fundraise for the next plant.
R32 Plant: Timeline, Economics & Strategic Logic
- Record-speed execution: A greenfield project on barren land, taken from zero permissions to completion targeted in 12 months, against a claimed industry norm of 24 months and a Chinese-company best of 18 months.
- Phased ramp-up: Trials to conclude by March, first production out by April, one reactor at a time, with full stabilization across all reactors expected by May and no later.
- Design changes absorbed: Significant redesign was required to meet Indian regulatory certifications (IBR for boilers, PESO for pressure vessels) not available on foreign-origin equipment, and a funding delay pushed the start from December to April.
- Export math is manageable: India's installed R32 capacity of 80,000 tons far exceeds domestic demand of 20,000 tons, but plants are swing plants that can produce R125 (4x the GWP), which consumes quota faster and reduces effective R32 output. Stallion's own export requirement is only ~2,500 tons, absorbable by a single customer.
- Post-2030 scarcity value: Capacities are frozen; the government will not permit additional capacity, and quota will only decline. Management expects price jumps of 25%, 50%, even 100% as quota cuts kick in, making R32 very profitable over time even if tonnage is capped.
Rustamji: "You can have hundreds of billions of dollars, but government is not going to give you permission to put up 1 kilo more plant. So scalability ends as of whatever your capacities are at the end of this year."
Margin Structure: Normalization, Headwinds & the Post-Quota Uplift
- Q1 was the anomaly, Q2 is the baseline: Material costs rose to 86% of revenue (GPM ~14%) in Q2, versus 74–76% in Q1. Management had flagged the prior quarter as a one-off windfall from better planning and stresses that Q2 represents the normal margin profile.
- Quota-year selling pressure is the bigger drag: FY24–26 are the HFC import quota calculation years; every competitor is maximizing sales and imports to secure a larger quota share, creating heavy selling pressure that management considers a more significant issue than the Gulf crisis.
- Gulf crisis compounded the hit: Material sourced from the Gulf saw price impacts of 10–20%, with freight and other costs compounding to over 20%, straining profitability further.
- Post-quota margin step-change: After the quota calculation period closes on 31 December 2026, all imports from FY28 will be against a fixed quota. Stallion expects to command more than 50% of the country quota, lifting legacy-business PAT margins to 15%.
- Blended FY28 PAT margin: Bhilwara (R32) at 22% on ~₹600 crores, HFO blends and helium at 15% on ~₹200 crores, and the regular business at 10% on the remainder, producing a blended uplift.
- ESOP charge is non-cash: The ₹9.51 crore provision booked in Q2 covers two quarters (Q1 and Q2) because third-party documentation was delayed from Q1. Management emphasizes it is not a cash payout and does not reduce company cash.
Rustamji: "We are in a period where the import quotas, the HFC quotas for India are going to be set... everyone tries to maximize their sales and maximize their import, as such leading to a heavy selling pressure. This is, I think, a bigger issue than the Gulf crisis also."
Revenue Trajectory & FY30 Ambition
- FY27 commitment intact: Management expects to meet the ~₹560 crore target (30% YoY growth) even without any R32 contribution, citing H1 performance and a seasonally stronger H2.
- FY28 ₹1,000 crore target: Built on a ~₹600 crore base plus ₹350–400 crores from R32, assuming 7,000 tons of the 10,000-ton capacity is utilized, with 30% growth expected as R32 comes online.
- Mumbattu revenue delayed to Q1 FY28: The facility's scope expanded to include helium, hydrocarbons, and other products beyond the original HFO blending plan, nearly doubling plant cost; revenue contribution now shifts out of FY27 entirely.
- FY30 ambition of ₹3,000 crores: Management states it can aim for ₹3,000 crores safely and will achieve ₹2,500 crores-plus, with growth coming from HFO (no quota, unlimited scalability), price increases on quota-restricted products, and new plants.
- HFO demand inflection from 2028: A 15% reduction in global HFC quota for developed nations will stress costs, accelerating the shift to HFOs. India's current requirement of ~500–600 tons is expected to quickly move past 2,500 tons, eventually replacing HFCs.
Rustamji: "I cannot aim for 2,000 crores and hope to achieve 2,500 crores. I can aim for 3,000 crores safely. I'll achieve 2,500 crores plus. I may be able to meet my target and reach 3,000 crore also by FY30."
New Facilities & Product Portfolio
- Helium facility at Kharagpur: Commenced operations in September 2026, positioned to serve semiconductors, electronics, healthcare, aerospace, and advanced research, with an expected 15% PAT margin uplift.
- Mumbattu facility: Most construction work is complete except the office building; scope expanded beyond HFO blending to include helium and hydrocarbons, nearly doubling plant cost; revenue contribution now projected from Q1 FY28.
- HFO plant (next project): Environmental studies initiated; work to start 3–5 months after the R32 plant is complete, stabilized, and running smoothly. Management will not take up two activities simultaneously.
- All future investments in Rajasthan: Management cites a positive business environment and government support as the reason for concentrating all other investments in the state.
- ISO tank container fleet: The company has purchased over 90 containers for moving material globally and for incoming raw materials, opting to own rather than lease to gain bigger leverage.
Rustamji: "It has been a dream to work in that state... And that is why all other investments also will be in Rajasthan onwards from our side."
Balance Sheet, Cash Flow & Fundraising
- H1 cash flow turned negative twice: Previously, the company paid out every supplier at quarter-end to show zero creditors as a signal of financial strength. After external noise about negative cash flow, that practice was stopped and normal creditor terms were allowed, moving cash flow back to positive.
- September 2026 negative cash flow: Driven by an increase in inventory and debtor days. A large sale order just before quarter-end, or inventory build-up anticipating supply disruptions, naturally causes negative operating cash flow and is not a true reflection of company health, per management.
- Other current assets of ~₹160 crore: Primarily capital advances of ₹129 crores given toward the Bhilwara facility EPC contract, plus other supplier advances.
- IPO and rights issue funds fully utilized: Both fundraisers have been completely deployed for their earmarked projects (Mambattu and Bhilwara).
- Next plant capex of ~₹200 crores: Anticipated around July–August, after R32 stabilizes. Fundraising options include QIP, preferential allotment, debentures, or debt; a rights issue is not preferred. No decision has been made yet.
- Working capital funding: When R32 starts up, there will be working capital requirements; no money has been taken for working capital so far. Maximum input materials arrive in November–December (quota-year closure), spilling into February, blocking cash until material is liquidated.
Rustamji: "Cash flow is not 100% a way of judging the health or performance of a company. You have to see it in a totality, is what we believe."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| R32 plant trials | Trials to conclude; production out by April | March 2027 |
| R32 plant full stabilization | All reactors at 100% output | May 2027 (no later) |
| FY27 revenue | ~₹560 crores (30% YoY growth), without R32 contribution | FY27 |
| FY28 revenue | ₹1,000 crores, with R32 contributing ₹350–400 crores | FY28 |
| Mumbattu revenue contribution | Revenue to begin | Q1 FY28 |
| HFO plant construction start | Work begins 3–5 months after R32 stabilization | ~July–August 2027 |
| Next plant capex | ~₹200 crores; fundraising route not yet decided | Around July–August 2027 |
| FY30 revenue ambition | ₹2,500 crores-plus, with a stretch target of ₹3,000 crores | FY30 |
| Post-quota legacy PAT margin | 15% on the regular business after quota calculation period closes | FY28 onward |
| Blended PAT margin (FY28) | Bhilwara 22%, HFO/helium 15%, regular business 10% | FY28 |
| Plant visit | Scheduled as soon as construction cleanup is done | December 2026–January 2027 |
| Next earnings call | Held immediately as soon as regulatory possible | Next quarter |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹136.03 cr, +28.86% YoY |
| H1 FY27 revenue from operations | ₹257.48 cr, +19.18% YoY |
| H1 FY27 total income | ₹264.05 cr, +22.07% YoY |
| Operating EBITDA before ESOP expenses | +0.43% YoY (Q2); H1: ₹41.10 cr, +36.39% YoY |
| Operating PAT before ESOP expenses | +4.78% YoY (Q2); H1: ₹30.53 cr, +40.16% YoY |
| ESOP expense (non-cash provision) | ₹9.51 cr in Q2, covering Q1 and Q2 together; ₹4.5 cr expected in each of the next 2 quarters |
| Material cost as a percentage of revenue | 86%, resulting in gross profit margin of ~14%; prior quarter was 74–76% and 18–20% GPM, which management called a one-off windfall |
| FY27 revenue target | ₹560 cr, 30% YoY growth; management expects to meet this even without R32 contribution |
| FY28 revenue projection | ~₹1,000 cr, comprising ₹600 cr base plus ₹350–400 cr from R32 assuming 7,000 tons of 10,000-ton capacity |
| FY30 revenue ambition | ₹3,000 cr |
| R32 manufacturing facility (Bhilwara) | 10,000 metric tonnes capacity; trials expected by March, phased production from April, full stabilization by May |
| Helium facility (Kharagpur) | Commenced operations in September 2026 |
| Mumbattu facility (Andhra Pradesh) | Completion expected in Q1 FY28; scope cost almost double original plan; no revenue contribution in FY27 |
| Blended PAT margin expectation for FY28 | ~15%; Bhilwara facility expected at 22%, helium and HFO blends at 15%, regular business at 10% |
| Working capital requirement for R32 startup | ₹150 cr; company has ₹120 cr unused overdraft with bank |
| Capital advances for Bilwara facility | ₹129 cr given for EPC contract, plus other supplier advances |
| HFC import quota calculation period | Closes 31st December 2026; Stallion expects more than 50% of India's quota |