Key Takeaways
- Volume up, EBITDA flat: Volume growth was offset by lower GST refunds and higher fuel costs, leaving EBITDA unchanged YoY at INR138 crores. Per-ton EBITDA fell to INR1,185 from INR1,410.
- Subsidy cliff absorbed: Q1 last year included a INR300-350 crore subsidy; this year’s Q1 had none, yet margins remained healthy, demonstrating improved underlying profitability.
- Capacity expansion on track: The 2 MT Siliguri grinding unit and 3 MT Meghalaya clinker plant are set to commission by early 2024, well ahead of key competitors, positioning the company to solidify its Northeast dominance.
- WHRS stabilized, savings ahead: The waste heat recovery system is now running at 10-11 MW, with management expecting INR45-50 crores in savings this year, though Q2 will see an annual shutdown impact.
- What to watch next quarter: Whether the promised doubling of premium product share materializes, the trajectory of fuel costs toward the INR1.95 target, and any concrete progress on the long-term growth roadmap beyond the Northeast.
Volume & Pricing Dynamics
- Northeast volumes surged 30% YoY while East volumes were flattish; management confirmed no logistical challenges and no market share loss in the East.
- Trade mix improved by 2% as the company deliberately constrained non-trade exposure to 12% (only 8% OPC) due to current capacity limits, prioritizing higher-margin trade sales.
- Pricing held firm: Northeast prices increased from April to June and have been maintained since, with no seasonal dip at the start of the financial year. A INR15 price equalization support withdrawal was a billing correction, not a price cut.
- Short-run outlook stable: Management expects prices to remain stable through Q2, though the view beyond that is uncommitted: "let's see how it turns up."
Vinit Tiwari: "I think we are well placed to handle that situation when it comes. When we have a capacity, I think we are much better placed to fight in the market."
Cost Structure & Margin Levers
- Fuel cost was the margin drag: Opening stock kcal cost was high at INR2.4, pushing up power and fuel expense; closing stock improved to INR2.05, and Q2 is targeted at INR1.95 as bamboo and alternative fuels ramp up.
- Biomass usage fell to 7% in Q1 against a normal 15% target, one reason gross calorific value increased; management expects this to normalize.
- Grid power cost rose for the Guwahati unit from INR6 to INR7.25 per unit, while the clinker plant’s self-generated power cost was elevated by high coal prices.
- Other expenses dropped QoQ by INR22 crores as consultancy fees from BCG and others taken in the prior quarter were not repeated; costs should remain stable at Q1 levels for the next 2-3 quarters.
- Fuel cost savings ahead: Management expects a INR0.40 reduction in gross kilocalorific value, yielding ~INR300/tonne savings on clinker and ~INR180/tonne on cement.
- Fly ash cost initiative: The company is planning BTAP railway wagons for fly ash procurement, a long-run project aimed at substantially reducing transportation costs, particularly for the Siliguri unit.
Tushar Bhajanka: "No. So actually — so there may have been a mistake in me saying it last time, but it was actually INR2.4. That was the opening stock."
Capacity Expansion & Capex
| Project | Capacity | Timeline |
|---|---|---|
| Siliguri grinding unit | 2 MT | November-December 2023 |
| Meghalaya clinker plant | 3 MT | January-February 2024 |
| Guwahati grinding unit | Expansion | November-December 2023 |
| Silchar grinding unit | New plant | December 2024 (delayed 3-4 months on land procurement) |
| Solar plant (Guwahati) | 25 MW | Target March, may slip 1-2 months |
- Capex phasing: INR800 crores to be spent over the next three quarters, followed by INR400-500 crores on the Silchar plant.
- Silchar delay not damaging: Management noted the Guwahati plant will provide sufficient grinding capacity in the interim, so the postponement will not hurt sales.
- Competitive timing advantage: The company’s capacities are coming online almost a year before Dalmia’s, giving a window to solidify market share.
- Debt drawdown from Q3: The company will begin taking INR400-500 crores in debt from Q3 this year, with rates expected not to exceed 8-8.1%, though still under negotiation. Peak net debt is seen at INR500 crores, with repayment targeted by end-FY25.
Strategic Initiatives & Geographic Ambitions
- Northeast first, then beyond: The priority is to sell more in the Northeast where margins are better; only surplus volumes will flow outside the region.
- Premium product push: Management reiterated its target to double the premium percentage in the next two quarters, claiming fruits are already visible from the start of Q2, though the metric remained at 4% last quarter despite a prior commitment to reach double digits.
- New premium products are expected to launch this quarter, part of an aggressive push in the outside-Northeast market to optimize the Siliguri plant.
- Mine auctions and acquisitions: The company is actively participating in mine auctions outside the Northeast, including Chhattisgarh, and is evaluating acquisition targets in the 0.1-0.25 crore tonne range. Larger deals like Saanvi are not of interest.
- Long-term growth roadmap still undefined: Management is evaluating opportunities in the South and East, participating in auction mines, and looking at organic options with a 3-3.5 year horizon, but no specific plan was shared.
Tushar Bhajanka: "The idea is not to only grow but to grow profitably in whatever other regions that we go to."
WHRS, Subsidies & Incentives
- WHRS now stabilized: After running at half capacity (5.6 MW) during kiln stabilization in Q1, the system is now delivering 10-11 MW of the 12.3 MW capacity.
- Annual shutdown in Q2 will partially mask WHRS savings this quarter, but management still expects INR45-50 crores in savings for the full year.
- Subsidy cliff absorbed: Last year’s Q1 included INR300-350 crores in government subsidy; this year’s Q1 had none, yet margins remained healthy, a point management emphasized when reading the results.
- New incentives secured: Assam’s State GST benefit offers 200% of investments for the Guwahati and Silchar grinding units, available for 15 years but expected to be consumed in under 7 years. The 25 MW solar plant has also applied for 100% SGST benefit.
- Pending subsidy: All government subsidies have been received except ~INR14 crores from the last quarter of March.
Tushar Bhajanka: "Last year quarter 1, we did have the subsidy of INR300 crores, INR350 crores. And this year, quarter 1, we do not have the subsidy of INR350 crores. Still, I think the margins are healthy."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | 12-13% for full year; Q2 may see variation from monsoon but still double-digit | FY24 |
| Premium product share | Double the current percentage | Next 2 quarters |
| Fuel cost (kcal) | Bring down to INR1.95 TCE | Q2 FY24 |
| WHRS savings | At least INR45-50 crores | FY24 |
| Siliguri grinding unit | Commission 2 MT capacity | November-December 2023 |
| Meghalaya clinker plant | Commission 3 MT capacity | January-February 2024 |
| Silchar grinding unit | Commission new plant | December 2024 |
| Solar plant (Guwahati) | Commission 25 MW | Target March, may slip 1-2 months |
| Peak net debt | INR500 crores, repaid to near-zero by end-FY25 | FY25 exit |
| Northeast market share | Solidify to 30-32% | No date; ongoing target |
Key Metrics
| Metric | Q1 FY24 |
|---|---|
| Revenue | ₹755 cr, vs ₹628 cr same quarter last year |
| EBITDA | ₹138 cr, flat vs ₹138 cr last year |
| Profit after tax | ₹104 cr, vs ₹105 cr last year |
| EBITDA per ton | ₹1,185, vs ₹1,410 per ton same quarter last year |
| Cement sales volume | 11.54 lakh ton, +19% YoY vs 9.80 lakh ton last year |
| Cement production | 11.74 lakh ton, +21% YoY vs 9.90 lakh ton last year |
| Clinker production | 7.27 lakh ton, vs 6.92 lakh ton same quarter last year |
| Northeast cement sales | 8.36 lakh ton, vs 6.48 lakh ton same quarter last year |
| Outside Northeast cement sales | 3.29 lakh ton, vs 3.32 lakh ton same quarter last year |
| Trade sales share | 88% of overall sales |
| Premium sales share | 4% of overall sales |
| Lead distance | 207 |
| Kilocalorie cost | ₹2.35 per TCE, opening stock at ₹2.4; expected to decline to ₹1.95 in Q2 |
| WHRS savings | ₹9 cr in Q1; expected full-year savings of at least ₹45–50 cr |
| Total capex incurred to date | ₹750 cr over last 2–3 quarters |
| FY24 capex outlook | ₹1,000–1,100 cr total, including ₹800 cr on clinker and grinding expansion, ₹40 cr AAC block, ₹80 cr solar plant, ₹80–90 cr maintenance |
| Peak net debt expected | ₹500 cr, to be taken from Q3/Q4 FY24; expect near-zero debt by end of FY25 |
| Previous subsidy benefit (now expired) | ₹300–350 per ton, received until Jan 2023; Q1 FY24 had no such subsidy |