Key Takeaways
- Consolidated revenue up 23%, but EV policy shock hit the core growth engine: Standalone (fasteners) grew ~4%, while the SGEM subsidiary (motor control units) surged 111% YoY despite a FAME II subsidy disruption that forced OEMs to rework product strategies mid-quarter.
- The 50% diversification target is officially delayed: Management walked back its FY25 goal of deriving half of revenue from non-two-wheeler/non-Ola sources, citing slower-than-planned industry model launches and an evolving competitive landscape.
- Margin recovery is a two-quarter story: Fastener margins are depressed by elevated raw material costs (42-43% of sales vs. a 39-40% norm) sitting in 120-day inventory; management expects normalization but not immediately.
- Customer concentration risk is acknowledged but framed as a bet on winners: Ola remains the dominant MCU customer, and while management is adding others, three of five two-wheeler clients are low-volume startups, making near-term diversification dependent on their success.
- What to watch next quarter: Whether the Gtake technology agreement is signed, whether new MCU products launch before year-end as promised, and whether the three-wheeler EV segment begins to pick up in early 2024 as guided.
EV & MCU Business: The Growth Engine Under Repair
- FAME subsidy whiplash: The government's unexpected reduction and eventual elimination of FAME II subsidies caused a demand spike in May (~40,000 units) followed by a sharp correction, forcing OEMs to reject existing product strategies and downsize battery packs to hit new price points. This made Q2 industry volumes look worse than underlying demand.
- SGEM still doubled revenue: Despite the policy disruption, the subsidiary grew 111% YoY, demonstrating that Sterling's position as a supplier to the largest EV two-wheeler OEM provides resilience even when the broader market stumbles.
- Resizing work was proactive, not reactive: Management had already begun developing lower-cost MCU variants before the FAME changes, anticipating market needs for more affordable products. A significant portion of design work was executed in China to accelerate timelines.
- Three-wheeler adoption is gated by charging infrastructure, not just TCO: While total cost of ownership economics favor EV adoption in three-wheelers, the dominant usage pattern (two drivers running a single vehicle 24 hours a day) leaves no downtime for charging. Management sees charging stations now being used, mostly by three-wheelers, and expects a pickup in Q1 calendar 2024 or Q1 FY25.
- LCV hopes are big but undetailed: Management expressed "very big hopes" from the light commercial vehicle business in FY25, anchored by the Ashok Leyland/Switch Mobility launch of Dost and Bada Dost, which they believe will galvanize competitor launches.
- The competitive moat is customer acquisition, not technology: Management explicitly stated that producing MCUs and developing technology are manageable challenges; the real barrier is winning customers, a process that starts at least a year before a new vehicle model launch.
Jaideep Wadhwa: "The most difficult thing about any business is getting customers that that is the most difficult part about business. It's never about producing something or even technology. Those things are manageable. Getting customers is really tough."
Customer Concentration & Diversification
- Ola is the elephant in the room: Management confirmed Sterling is "100% of Ola business as of today" but declined to comment on whether arrangements change on Ola's second-generation platform, citing confidentiality. Ola has publicly discussed manufacturing MCUs in-house, though management views this as very difficult to execute.
- The rest of the customer base is thin: Beyond Ola, only one other two-wheeler customer has "reasonable volumes." The remaining three are startups with good products but insignificant volumes, constrained partly by Sterling's own engineering resources, which management calls the "biggest constraint."
- Diversification timeline has slipped: The previous target of 50% revenue from non-two-wheeler/non-Ola sources by FY25 will not be met. Management attributes the delay to industry evolution, slower model launches, and the reality that new vehicle programs take years to ramp.
- The order book is deliberately opaque: Management resists providing an order book, calling it "nebulous" because contract values depend entirely on the commercial success of customer vehicle launches, which are inherently uncertain. Instead, they track contracts and vehicles in homologation.
Jaideep Wadhwa: "We have kind of resisted the whole notion of saying talking about an order book because we find that to be, as I explained a little earlier, that it's a little nebulous because of the fact that we don't know exactly how the launches will go and what the success of the launch will be."
Fasteners: Steady but Margin-Compressed
- Growth modestly above industry: Standalone fasteners grew close to 4% against an automotive industry that grew 1%, with passenger vehicles (up 15% on SUV demand) offsetting weakness in farm equipment (down 8.7%).
- Raw material overhang: Steel costs have pushed raw material content to 42-43% of sales versus a historical 39-40%. While customers have compensated for steel price increases, they have not done so fully, compressing margins below the 16-17% historical range.
- Inventory timing extends the pain: With approximately 120 days of high-cost inventory still working through the system, per an analyst's math, management acknowledged that some grades and SKUs have been consumed while others have not, with no fixed rule for when normalization completes.
- Exports remain a weak spot: Pre-COVID European customers faced financial stress and rationalized their businesses. Sterling is pursuing new customer acquisition in export markets but visibility is "very slow."
- Growth strategy is customer and product acquisition: Management's three-pronged approach targets new customer wins, higher content per vehicle, and new product development, all aimed at outpacing industry growth and boosting capacity utilization.
Margins: A Tale of Two Businesses
- Fastener margin recovery is a waiting game: The path back to 16-17% EBITDA margins runs through raw material cost normalization to the 39-40% historical level, which management expects "in times to come" without specifying when.
- SGEM margin is structurally capped near 7-9%: The business is asset-light and working-capital-intensive, meaning volume leverage does not translate into significant margin expansion. Management guides a steady-state range of 7-9%, with no plans this year for investments (SMT lines, in-house processes) that would alter that structure.
- Standalone 15% EBITDA target still alive, but confidence is muted: Management corrected an analyst who attributed the 15% target to consolidated results, clarifying it applies to standalone. They remain "very hopeful" of getting close but will not give confident guidance because industry growth is not fast enough to provide visibility.
- Consolidated margin was never guided to 15%: The 12.5% consolidated EBITDA margin is the baseline; management explicitly stated they never promised 15% at the consolidated level.
Strategic Initiatives & Partnerships
- Gtake technology agreement nearing signature: After more than two years of work, management expects to finalize the technology arrangement with Gtake within November 2023, with a meeting scheduled later that month. The agreement covers fine-tuning of existing arrangements.
- No minority investment from Gtake: Government restrictions on investments from neighboring countries have blocked any equity participation, and after two years of collaboration on the technology arrangement, management is unsure there is remaining value in pursuing an investment.
- New MCU products promised before year-end: Sterling Gtake hopes to launch additional products before the end of 2023, aimed at capturing greater share in the MCU business and expanding share of wallet with existing customers.
- Hyundai Kia partnership is very early stage: An analyst referenced a partnership with the Hyundai Kia Group; management confirmed it exists but said it is far too early to provide any guidance on volumes or revenue.
- ESOP plan introduced: The company announced the STL ESOP Plan 2023, subject to regulatory approvals, designed to provide productivity and performance-based incentives to employees of the company and its subsidiaries.
Jaideep Wadhwa: "I think other than the political leadership of this country, I think no one else knows when that will happen."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Gtake agreement finalization | Technology arrangement to be signed | Within November 2023 |
| New MCU product launches | Additional products in Sterling Gtake subsidiary | Before end of 2023 |
| CAPEX completion | ₹28 crores plan completed | Before 31 March 2024 |
| Three-wheeler EV pickup | Segment adoption begins to accelerate | Q1 calendar 2024 or Q1 FY25 |
| H2 top line | Maintain current run rate, "maybe marginally better" | H2 FY24 |
| Standalone EBITDA margin | "Very hopeful to be very close to 15%" | No date; conditional on industry growth |
| Revenue diversification to 50% non-two-wheeler/non-Ola | Will NOT be achieved in FY25; timelines changed | Post-FY25, undated |
| SGEM steady-state margin | 7% to 9% | Ongoing; no investment-driven change this year |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Consolidated revenue growth | +23% YoY |
| Standalone revenue growth | +4% YoY, outpacing auto industry growth of 1% |
| Standalone revenue (FY23 full year) | ₹600 cr, with full-utilization capacity of ₹800–850 cr based on current product mix and price points |
| Consolidated EBITDA margin | 12.5% |
| Standalone EBITDA margin target | 15%+, management remains hopeful of approaching this level |
| Raw material content | 42–43% of revenue, versus historical 39–40% |
| Fasteners business monthly run rate | ~₹50 cr per month |
| Fasteners inventory carrying days | ~120 days |
| SGEM (EV subsidiary) revenue growth | +111% YoY |
| SGEM steady-state margin expectation | 7–9% |
| SGEM capacity | 1,500 units per day, utilization averaging ~70% |
| SGEM customer contracts (MCU) | 16 contracts, covering ~120 vehicle models; additional ~10 contracts in pipeline |
| SGEM two-wheeler market share | Over 40% |
| SGEM three-wheeler customers in active production | 5 |
| Consolidated CAPEX plan (FY24) | ₹50 cr+, on track; H1 CAPEX was ~₹5 cr of the ₹28 cr SGEM plan, with balance ₹23 cr expected by 31 March |
| Consolidated steady-state ROCE expectation | 15–20%, with fasteners lower and subsidiary higher |
| EV industry growth | 37% YoY, below company expectations due to FAME II subsidy changes |
| MCU product resizing (downsizing) | ~one-third reduction in size, cost, and price to align with smaller battery packs |