Key Takeaways
- Record Q2 execution, tax shield unlocked: Installations hit 565 MW (121% YoY), and a ₹718 cr deferred tax asset was recognized, creating a tax shield on ₹5,000 cr of future profits.
- Margin story is a mix shift, not a miss: Group EBITDA margin rose 460 bps YoY to 18.6%, but the WTG revenue share grew to 84%, mechanically compressing the blended margin even as each segment improved.
- Receivables spike is structural, not alarming: Receivables surged because ~300 MW of the quarter's 565 MW went to a single PSU with slower payment terms; this was priced into bids and is expected to taper as the PSU mix normalizes.
- Land bank strategy targets EPC control: 23+ GW of renewable sites identified and 7+ GW of land development underway, aiming to shift the EPC mix from 20:80 to 50:50 by FY '28 and reduce commissioning delays on non-EPC projects.
- What to watch next quarter: The pace of commissioning from the 327 MW balance of erection, any new turbine model announcement, and whether the PSU-heavy receivables mix begins to unwind as guided.
Execution & Financial Performance
- Record installations: 565 MW delivered in Q2 FY '26, the highest Q2 in Suzlon's 30+ year history and double the installations of Q2 FY '25, with 121% YoY growth.
- Revenue and profitability: Consolidated revenue of ₹3,866 cr, EBITDA of ₹721 cr (145% YoY growth), PBT of ₹562 cr (179% YoY growth), and PAT of ₹1,279 cr. EBITDA margin improved 460 bps YoY to 18.6% from 14.1%.
- Deferred tax asset recognition: An incremental net DTA of ₹718 cr was recognized in Q2 based on reasonable certainty of future profits, bringing total DTA to ₹1,229 cr. This provides a tax shield on future profits of ₹5,000 cr, with additional carryforward losses of ~₹14,000 cr still available for further DTA recognition subject to meeting criteria.
- Balance sheet strength: Net worth of ₹7,860 cr, net cash of ₹1,480 cr, and banking limits of ₹7,000 cr tied up for order book execution.
- Execution pipeline visibility: 568 MW of erection done beyond the 270 MW commissioned; 80 MW already commissioned post-September taking cumulative to 350 MW; 160 MW ready for commissioning awaiting client evacuation readiness; 327 MW balance of erection with clear visibility for commissioning this quarter.
- Forging and foundry surge: 53% YoY revenue growth in H1 FY '26, EBITDA jumped 243% to ₹52 cr, with the trend expected to continue. SE Forge margins expanded sharply from 8.6% to 19.5% due to cost control initiatives: machining internalized (previously outsourced), scrap recycling increased, and procurement costs reduced.
- OMS business: Over 15 GW under management in India, with machine availability consistently above 95%.
Chalasani: "What we have today problem is that, okay? Most of the places where we supply the turbines, they are not able to commission them are in the non-EPC projects, very less in the EPC project. So when we move to the EPC, we are mitigating that risk."
Margin Composition & Mix Effects
- Group margin mechanics: Individual business margins (WTG, OMS) are improving, but group-level margins change because WTG revenue share rose from 82% to 84% and WTG margins are structurally lower than OMS margins.
- OMS EBIT dip is a one-off: O&M EBIT was lower at ₹150 cr vs ₹200 cr YoY, but on a contribution margin level there is no difference vs last year. The EBITDA margin impact is a one-off this quarter due to conservative provisioning or some cost being provided for. First half OMS margin still at 37%, and guidance remains 39-40% range with no red flags.
- SE Forge margin sustainability: The sharp margin expansion from 8.6% to 19.5% is expected to be sustainable, driven by structural cost control measures rather than one-time gains.
- Revenue per MW: Average realization per MW remains in line with guidance, with no change YoY.
Order Book, Pipeline & Land Strategy
- Order book execution timeline: Current order book to be executed in the next 18 to 24 months.
- Order pipeline: Significant pipeline exists under various discussions; adequate pipeline from bids under progress (about 11 GW) will continue to provide order booking, especially in C&I and public sector segments. Management expects to maintain the trend of closing the order book higher than the opening order book despite increasing supplies.
- S144 certification: The S144 order book has been certified as lowest carbon footprint and fully compliant with MNRE's latest regulations.
- Land development strategy: 23+ GW of renewable potential sites identified, 7+ GW land development underway to ensure rapid deployment readiness and reduce execution delays. Seed capital of ~₹150-160 cr allocated without materially impacting working capital, and this capital will keep getting recycled through co-developer partnerships. The target is to move the EPC mix from the current 20:80 to 50:50 by FY '28.
- Renom's AUM expansion: Renom's assets under management set to expand further, driven by customer fleet acquisitions and an ongoing pipeline.
Regulatory Environment & Domestic Manufacturing
- GST reduction: GST on wind turbines reduced from 12% to 5%, expected to lower capital expenditure and the levelized cost of energy.
- ALMM wind SOP: MNRE released standard operating procedures for inclusion in the ALMM wind, reinforcing commitment to quality and domestic manufacturing.
- REEIMS portal: The Renewable Energy Equipment Import Monitoring System became effective from 1st November; any component import requires registration on this portal.
- Local manufacturing SOP: MNRE released a detailed SOP defining qualification process, inspection requirements, ISO requirements, and listing process for domestic manufacturing of wind turbines. A new model on the same platform is not recognized unless incremental power is more than 10% and rotor diameter increases by at least 2%; otherwise it is considered the old model and does not get the 800 MW import allowance.
- Subcomponent restrictions expected: The next expected regulatory step is subcomponent-level restrictions (e.g., gearbox assembly, castings). Management stated that with volume increases, Suzlon would consider getting into subcomponent manufacturing if regulations require it, citing existing experience manufacturing generators, transformers, and panels.
Chalasani: "So I think this only shows that they are very, very extremely keen that the domestic manufacturing has to increase and which we said earlier, and we meet that requirement fully and we encourage that and this provides level playing field."
Technology, Competition & Wind Economics
- Next turbine model: Management declined to give a timeline for graduating from 3.x MW to higher capacity variants but stated progress is underway, with some models under prototype and some under procurement. Management is confident that when 3.15 MW interest exhausts, a higher model turbine will be available, and does not see this as a major competitive issue.
- Wind vs solar-plus-BESS economics: Management argued that solar-plus-BESS alone for round-the-clock power (80% PLF annually, minimum 75% monthly, 90% availability in peak periods) would cost ~₹6.5/unit, while solar-plus-wind-plus-BESS would cost ~₹4.65-4.7/unit. Wind remains essential for cost-effective firm power.
- Battery supply concentration risk: Management flagged that battery supply is concentrated in a single country, creating a major concern about external price and supply control.
- 42 GW LOA cancellation: Management stated there is no impact on Suzlon, characterizing the cancellations as mainly affecting pure solar bids where DISCOMs are unwilling to sign PPAs at current tariffs.
Chalasani: "If you want to create a project of, let's say, 300 megawatts where you need 80% of PLF on a year with a minimum 75% on every month basis and 90% availability in the peak period, if you do that, if you do the BESS and the solar only, which is what many people are talking, that tariff is expected to be somewhere around 6.5, okay? And the same thing if you do solar plus wind plus BESS, which is what is the required one, the tariff cost to somewhere around 4.7, 4.65, okay? So therefore, on the cost of energy basis, you can never ever have a lower tariff with solar plus BESS meeting round-the-clock power. This is just a myth."
Working Capital, Receivables & Cash
- Receivables surge explained: Receivables increased because in Q1 and Q2, supplies to specific PSU contracts were more than 50% of total. In the 565 MW supplied in Q2, close to 300 MW went to a single PSU. PSU payment terms are slower: 10% advance, first payment (70%) only after materials received at site, balance 20% spread till commissioning, with payment taking up to 45 days vs 20-25 days for other contracts. This was known in advance and working capital interest was loaded into bids and pricing. The surge is expected to get controlled as PSU supplies taper down.
- Cash position and usage: Cash of ~₹1,800 cr is described as small relative to needs; it will be used for capex, seed money for development (₹150 cr provided), and as reserve. Management stated the company needs to reach a stage of having a "good problem" of excess cash before considering dividends.
Chalasani: "But let's reach that stage of having a good problem on hand. But right today, I think it is really used for our capex and various other purposes."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY '26 growth | 60% year-on-year growth across all key performance parameters | FY '26 |
| Industry installations | Total wind installations to reach approximately 6 GW | By end of FY '26 |
| Industry installations | Total wind installations to reach 8 GW | FY '27 |
| EPC mix shift | Move from current 20:80 to 50:50 | By FY '28 |
| OMS margin | Remain between 37% and 40% | Ongoing |
| SE Forge mix | Shift to one-third Suzlon, two-thirds non-Suzlon | FY '27 |
| Export orders | Export order to be obtained; supplies to start in FY '28 | FY '27 / FY '28 |
| Order book execution | Current order book executed | Next 18-24 months |
| DTA recognition | Further DTA expected to be added as more profit visibility emerges | Subject to meeting criteria |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹3,866 cr, +84% YoY |
| EBITDA | ₹721 cr, +145% YoY |
| EBITDA margin | 18.6%, up 460 bps YoY from 14.1% |
| Profit before tax | ₹562 cr, +179% YoY |
| Profit after tax | ₹1,279 cr |
| Net deferred tax asset recognized in quarter | ₹718 cr incremental, total DTA now ₹1,229 cr providing tax shield on ~₹5,000 cr of future profits |
| Net worth | ₹7,860 cr as of September 2025 |
| Net cash position | ₹1,480 cr |
| Deliveries | 565 MW, +121% YoY, highest-ever Q2 in over 30-year history |
| Order book | 6.2 GW, added more than 1.4 GW during the quarter |
| Order book composition | 61% C&I, 14% PSU, 35% bidding |
| Execution pipeline | 1,865 MW at various stages across 29 locations in 7 states |
| EPC mix | 20% EPC, 80% non-EPC; target 50:50 by FY '28 |
| OMS assets under management | >15 GW in India, machine availability consistently above 95% |
| OMS EBITDA margin | 34.5% in Q2, 37% in H1; guidance range 39–40% |
| WTG contribution margin | 26.9% |
| Forging and foundry EBITDA | ₹52 cr in H1 FY26, +243% YoY; margin improved from 8.6% to 19.5% |
| FY26 growth guidance | 60% YoY growth across all key performance parameters, reaffirmed |