Key Takeaways
- FY25 was an inflection year: WTG contribution margin hit 23.6%, 360 bps above the 20% target, as operating leverage from doubled deliveries kicked in.
- FY26 guidance is aggressive and specific: Management committed to minimum 60% growth across revenue, deliveries, EBITDA and normalized PAT, with COD growth "much higher than 60%."
- The order book is not the constraint: Management sees no order inflow issue for at least 18–24 months, with momentum expected to accelerate over FY25.
- Consolidated margins will structurally compress: As the lower-margin WTG division (23%) grows faster than high-margin O&M (68%), the blended contribution margin fell from 36% to 33.7% and will keep falling.
- What to watch next quarter: Whether the land development pipeline converts into announced EPC contracts, the pace of SE Forge's external sales ramp, and any quantification of the repowering opportunity.
FY26 Guidance: The 60% Growth Commitment
- Revenue, deliveries, EBITDA, normalized PAT: All guided to grow at least 60% YoY in FY26 over FY25, a commitment management framed as meeting all analyst estimates.
- COD growth: Expected to be "much higher than 60%," reflecting the lumpy commissioning profile where over 2.5 GW was commissioned in March and April combined.
- WTG contribution margin: Targeted to hold at 23% in FY26, the same level achieved in FY25, implying no further operating leverage benefit is being promised despite higher volumes.
- Consolidated EBITDA margin: Guided at ~17% for FY26, flat with FY25, as the mix shift toward lower-margin WTG offsets scale benefits.
- Tax rate: Assumed at 25% for FY26, driven by P&L charges from DTA amortization rather than cash tax outflows. A large part of the ₹638 crore DTA created in Q4 FY25 is expected to be absorbed during FY26.
- Capex: Base case of ₹400–₹450 crores for sustenance, R&D, IT and capacity augmentation. Blades can be expanded by adding moulds without capex-intensive investment.
- R&D spend: Estimated at ~₹225 crores for FY26, up from ~₹150 crores historically, reflecting investment in new products including repowering solutions and low-wind-site turbines.
- Depreciation: Forecast at ₹350–₹400 crores annually going forward, up from Q4's ₹93 crore run-rate which included Renom acquisition capitalization and one-off IT asset charges.
- Interest cost: Expected to increase from FY25's ~₹150 crores, driven by Renom's working capital debt, SE Forge borrowing, and higher working capital for enhanced deliveries.
Chalasani: "I don't think the order book not being arrogant, not being overconfident or at least the next 18 months, 24 months I don't see the orders becoming an issue for us."
The Land Problem: Delays, Mitigation and a Development Pipeline
- What caused the FY25 shortfall: Industry commissioned ~4.2 GW in FY25, growing 28% but falling short of expectations due to transmission and land acquisition challenges. Less than 30% of Suzlon's order book comprises non-EPC projects where land acquisition lies outside its scope, so client-side delays directly impacted commissioning timelines.
- Mitigation in execution: Suzlon prioritized projects with partial land availability upfront to keep deliveries moving despite incomplete site readiness.
- The structural fix: A land development pipeline is being built through framework agreements in Andhra Pradesh, Rajasthan, Madhya Pradesh and Karnataka. Some of these are converting into EPC contracts, with announcements expected this year and increasing quarter-to-quarter.
- NTPC as a visibility anchor: Projects like NTPC come with substantial land readiness, offering greater commissioning visibility for FY26.
- What management will not quantify: When asked how much of the land development pipeline will convert to EPC contracts in FY26, management declined to put a number on it.
Order Book & Demand: Visibility Without Anxiety
- Order inflow momentum: Management expects order inflow to continue or accelerate slightly compared to FY25, with good momentum sustained across segments.
- C&I growth: Continues to grow in absolute terms; the slight percentage shrinkage in its share reflects public sector growing significantly faster, not any weakness in commercial and industrial demand.
- Market creation stance: Management framed its approach as creating markets rather than reacting to them, pointing to its role in shaping India's wind energy trajectory.
- Grid frequency headwind: About 20% of the time in H2 FY25 (October to March), grid frequency went beyond norms due to increasing solar penetration, a systemic challenge for wind integration.
- Electricity market dynamics: Spot prices fell to near zero during solar generating hours due to surplus supply, but during wind generating hours tariffs remain ₹4.50–₹5/kWh with demand continuing to grow. Management argues solar-plus-storage cannot replace wind unless battery costs fall below ₹1.25/kWh.
Chalasani: "We work in the different environment in India is we don't react to the market. We actually create the market."
Margin Structure: The Mix-Shift Math
- The core dynamic: Consolidated contribution margin fell from 36% in FY24 to 33.7% in FY25 because WTG division (23% contribution margin) doubled deliveries, while O&M (68% contribution margin) grew only at an inflationary rate. As WTG's share of the mix keeps rising, consolidated contribution margin will keep falling.
- WTG margin achievement: The 23.6% contribution margin in WTG surpassed the earlier 20% estimate by 360 bps, validating the scalable business model as operating leverage materialized.
- O&M margin clarity: India O&M operating margin is ~38% per the investor deck; the lower 26% segmental margin in regulatory filings (REC-33) includes international O&M and Renom, which drag the blended number down. Management directed analysts to the investor deck for India O&M margins.
- Renom integration: The multi-brand O&M acquisition crossed 3 GW of assets under management and is still striving for customer fleet acquisition. It is not yet reported as a separate O&M division.
- Forging & Foundry: Started showing an uptick in the last two quarters and is expected to continue this trend, with SE Forge now ready to supply forgings for 3 MW turbines for both internal requirements and external wind sales.
Balance Sheet & Below-the-Line Items
- Net cash position: Rose to ₹1,943 crores, an increase of ₹836 crores over Q3 FY25, on a consolidated net worth of ₹6,106 crores.
- DTA creation: A deferred tax asset of ₹638 crores was created in FY25 on the back of assessed losses of ~₹2,500 crores, based on absolute certainty of profits in FY26 per IndAS 12. This will start getting charged into the P&L from Q1 FY26.
- Liabilities booked: ~₹900 crores of liabilities sit on the balance sheet: ~₹400 crores for Renom put/call options (from the original SHA signed during the 51% stake buyout in FY25) and ~₹400 crores for One Earth (Pune HQ) put/call option.
- Depreciation step-up: Q4 depreciation rose to ₹93 crores from ₹66 crores in Q3 due to Renom acquisition capitalization (5-year amortization) and one-off small IT assets.
- Interest cost drivers: The increase reflects Renom consolidation (₹120 crores working capital debt), SE Forge borrowing (₹100 crores in Q4 with one-time costs), and increased working capital for enhanced deliveries.
Products, Capacity & the Technology Roadmap
- Current capacity: Manufacturing capacity is 4.5 GW, but with consistent demand and 3-shift operations, Suzlon can deliver 5.5 GW without adding capacity. Quarter-to-quarter demand variation (1 GW vs 2 GW) is why 4.5 GW is the stated number. Nacelle capacity needs no enhancement; blades can be expanded by adding moulds.
- S144 platform: The current turbine can easily meet market demand; a variant may come on this platform. The next model will arrive when the country needs it to keep tariffs from rising.
- Low-wind sites: A new product is required for fresh sites with low wind; rotor diameter and hub height determine what is needed, not megawatts. The goal is lowest cost per kilowatt hour.
- Repowering: Two distinct opportunities exist. First, a product to replace blades/nacelles on older turbines to increase capacity, with potential tapping expected to start toward the end of this year and pick up next year. Second, full repowering (uprooting and replacing) is at the beginning stage. Management declined to quantify either opportunity.
- RLMM compliance: The draft notification covering domestic manufacturing, cyber security and R&D within India was issued on 17 April. Management stated Suzlon is completely compliant with all conditions.
- Component manufacturing capacity: Adequate capacity exists in India; if utilization rises (e.g., casting from 25% to 60%), fixed cost per component falls and prices fall. The generator factory sold off earlier remains non-operational due to no demand.
Chalasani: "We are working on a product for that, which can replace — can increase the capacity of some of our older turbines, which are of lesser capacity. That we mapped — there is a significant amount of potential for that and which we would see that tapping the potential or maybe starting towards end of this year and what's picking up next year."
Exports & Competitive Positioning
- Export preparedness: Management stated Suzlon will be prepared for exports in 18–24 months if there is a requirement beyond domestic supply capacity, but was explicit that this is not an affirmative commitment: "Let's wait and watch for the time."
- Import substitution: The mandate does not change anything for Suzlon, which already manufactures nacelles and blades in-house and procures gearboxes domestically. Backward integration from the mandate is "possibly yes, but it's too early to talk about that."
- Competitive dynamics: Management did not directly address whether competitors would face RLMM compliance challenges, instead stating the draft notification creates a level playing field advantage for Indian companies.
- Long-term demand visibility: Management expects India's capacity addition to see year-on-year growth until 2030, with FY27 higher than FY26 and FY28 still higher.
Chalasani: "Would we be prepared? Yes, we would be prepared. Would we be doing it? Let's wait and watch for the time."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue, deliveries, EBITDA, normalized PAT growth | Minimum 60% YoY growth over FY25 | FY26 |
| COD growth | "Much higher than 60%" over FY25 | FY26 |
| WTG contribution margin | Maintain at 23% | FY26 |
| Consolidated EBITDA margin | ~17% (flat with FY25) | FY26 |
| DTA absorption | Large part of ₹638 cr DTA charged into P&L | FY26 |
| Capex | ₹400–₹450 crores base case | FY26 |
| R&D spend | ~₹225 crores (up from ~₹150 cr) | FY26 |
| Depreciation | ₹350–₹400 crores annual run-rate | Going forward |
| Tax rate (P&L charge, not cash) | 25% | FY26 |
| Land development pipeline conversion | EPC contracts announced from framework agreements, increasing quarter-to-quarter | FY26 |
| Repowering product launch | Start tapping potential for blade/nacelle replacement | End of FY26 / FY27 |
| Export preparedness | Capability ready if required beyond domestic supply | 18–24 months |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Consolidated revenue | ₹3,774 cr, 73% YoY and 27% QoQ |
| Consolidated EBITDA | ₹693 cr, 95% YoY and 39% QoQ |
| Consolidated EBITDA margin | 18.4%, up 200 bps from 16.4% in Q4 FY24 |
| Consolidated PAT | ₹1,181 cr, highest ever quarterly PAT, includes deferred tax asset recognition of ~₹600 cr |
| Deliveries | 573 MW, almost 2x YoY |
| FY25 consolidated revenue | ₹10,851 cr, 67% YoY |
| FY25 consolidated EBITDA | ₹1,857 cr, 80% YoY |
| FY25 consolidated EBITDA margin | 17.1%, up from 15.8% in FY24 |
| FY25 consolidated PAT | ₹2,072 cr, 190% YoY, after exceptional items and including deferred tax asset recognition |
| FY25 WTG division revenue | ₹8,481 cr, 101% YoY |
| FY25 WTG deliveries | 1,550 MW, 118% YoY |
| FY25 WTG contribution margin | 23.6%, surpassing earlier estimates of 20% by 360 bps |
| FY26 guidance: growth across key parameters | Minimum 60% over FY25, across deliveries, revenue, EBITDA, normalized PAT |
| Net cash position | ₹1,943 cr, increase of ₹836 cr over Q3 FY25 |
| Consolidated net worth | ₹6,106 cr as of March 2025 |
| Deferred tax asset created in FY25 | ₹638 cr, on assessed losses of ~₹2,500 cr |
| OMS capacity under management in India | >15 GW, mission availability above 95% |
| Renom assets under management | >3 GW |
| FY25 consolidated contribution margin | 33.7%, down from 36% in FY24 |
| FY25 OMS contribution margin | 68%, up from 66.7% in FY24 |
| FY25 capex incurred | ~₹350 cr |
| FY26 estimated capex | ~₹400–₹450 cr |
| FY26 estimated R&D expenditure | ~₹225 cr, up from ~₹150 cr historically |
| FY26 estimated annual depreciation | ₹350–₹400 cr |
| FY25 full year interest cost | ~₹150 cr |
| Public sector share of order book | 26% |
| Industry commissioned in FY25 | ~4.2 GW, 28% growth |
| Suzlon commissioned in FY25 | 336 MW, with additional 370 MW in pre-commissioning, total over 707 MW |
| Domestic component share | Up to 80% |
| Solar-plus-wind hybrid tariff | ~₹3.35–₹3.4/kWh |
| Pure wind tariff, recent bids | ~₹3.76/kWh average |
| Solar-plus-battery tariff, one bid | ~₹8/kWh |
| FY26 estimated tax rate | 25% |