Key Takeaways
- Regulatory true-up masks underlying strength: A one-off ₹460 crore EBITDA boost from Delhi’s 2022-23 tariff true-up inflated the quarter, but new businesses (solar manufacturing, rooftop, Odisha) compensated for a ~₹300 crore EBITDA hole left by Mundra’s shutdown.
- Solar manufacturing is scaling profitably: The module plant delivered a 28% EBITDA margin in Q3, with 9M PAT up 154% YoY to ₹592 crores, and management expects margins to improve further as the plant matures.
- Mundra resolution is close, but not closed: A supplementary PPA with Gujarat is one unresolved point away from completion, with a restart possible by end-March; parallel discussions with other states are underway to absorb the plant’s full capacity.
- Renewable execution is accelerating but gated by transmission: 2.2 GW commissioned so far in FY26, with 2.5 GW targeted for FY27; the pace is now dictated by delayed interstate transmission lines, not by Tata Power’s own execution capacity.
- What to watch next quarter: Whether the Mundra SPPA closes and the plant restarts, the pace of renewable commissioning against transmission line readiness, and whether Odisha and rooftop solar sustain their profit trajectory without the Delhi true-up tailwind.
Mundra: The Overhang Nearing Resolution
- The cost of shutdown: The plant has been idle for six months, booking ~₹800 crores in PAT losses over 9M because no capacity charges accrue when the plant is not operating.
- SPPA status: An arrangement with Gujarat is concluded on all issues except one, with management expecting clarity in 2-3 weeks; once signed, the SPPA will be circulated to other procurer states to schedule their offtake.
- Restart timeline: Management hopes to begin operations by end-March, positioning the plant to meet summer demand when peak loads are expected to hit 270-280 GW.
- Section 11 risk: Management expects the SPPA to close before Section 11 could be imposed, because procurer states would pay more under that directive than under the negotiated SPPA.
Dr. Praveer Sinha: "Hopefully in the next few weeks, we should be able to find out the comfort level of the other procurer state and then we will start scheduling the power."
New Businesses: The Profit Engine
Solar Manufacturing
- Q3 performance: PAT of ₹251 crores (vs ₹112 crores last year); 9M PAT of ₹592 crores, up 154% YoY. EBITDA margin reached close to 28% for the quarter and 24% for 9M.
- Margin trajectory: Management attributes current margins to having learned how to run the plant and expects them to improve further, not deteriorate.
- ALMM/DCR transition: Some imported cells were used in Q3 under ALMM orders for imported cells with domestic modules; from 1st June, only DCR cells and DCR modules will be utilized.
- Backward integration: A wafer and ingot plant is under discussion, with technology, equipment and sizing still being examined; no final decision timeline was given.
- Input cost pass-through: If input material costs rise, output material costs rise for all players; management sees no substantial impact on equity IRR given the solar-wind mix in projects.
Dr. Praveer Sinha: "Very short answer for your long question. And this will be much, much better going forward. Once we have learned how to run the plant, it will only improve. It will not become worse."
Rooftop Solar
- Execution surge: 372 MW executed in Q3 vs 173 MW last year; crossed 1 GW in 9 months. PAT rose to ₹111 crores vs ₹60 crores.
- Growth outlook: Management expects capacity additions this year to be at least 50-60% higher than last year, with the pace continuing to increase, calling the opportunity "the tip of the iceberg."
Odisha Discoms
- Turnaround delivering: Q3 profit rose to ₹226 crores vs ₹86 crores last year; 9M profit reached ₹505 crores vs ₹164 crores. Collection and billing efficiencies have improved, loss reduction has occurred, and electricity spilling has reduced drastically.
- Cash generation: The business earned ₹800 crores in cash in Q3 alone, reflecting the operational improvements flowing through to the balance sheet.
- Performance trajectory: Results have improved every quarter for the last three years, and management expects further stabilization and better results in future quarters.
Regulatory & One-Off Items
- Delhi true-up: A one-off regulatory true-up for 2022-23 tariffs contributed ₹460 crores at EBITDA and ₹344 crores at PAT in Q3; the total 6-month regulatory impact was ₹344 crores.
- Regulatory asset movement: The regulatory asset balance actually declined by ₹460 crores during the quarter; the higher reported number reflects a fresh ₹400 crore regulatory asset created by the 2022-23 true-up order.
- Maithon FGD: The flue-gas desulphurization unit is now commissioned, with regulatory returns of ~₹15 crores per quarter being recognized. Maithon is a regulatory asset with no further CAPEX; debt will only reduce as cash is earned.
- Elimination positive: A ₹60 crore positive elimination entry arose from intra-transfer losses in a Solar EPC contract being eliminated per accounting standards.
Renewable Pipeline & Execution
- FY26 commissioning: 2.2 GW commissioned so far; another 400-500 MW expected in Q4, taking the full-year total to ~2.7 GW, above the initial 1.5-2 GW expectation.
- FY27 target: 2.5 GW of own capacity, with potential to reach 3 GW; a pipeline of nearly 5.5 GW is to be executed over the next two years.
- FY28 target: Another 2.5 GW, with potential to reach 2-3 GW.
- Transmission bottleneck: Many interstate transmission lines have been delayed, some expected by March, some by May/June, some by December; project completion is being staggered to match evacuation availability. This is the binding constraint on commissioning pace, not Tata Power’s execution capacity.
- Connectivity approvals: No fresh connectivity approvals are being given for renewable projects, but the large pipeline of projects already under implementation means momentum should not slow significantly over the next two years.
- Cell sourcing: All renewable projects built on Tata Power’s own books will use the company’s own manufactured cells.
- Wind projects: A 198 MW wind project for Tata Steel was commissioned in Q3; more wind and solar projects will be commissioned between Q4 FY26 and Q1 FY27.
Distribution & Transmission Opportunities
- PPP pipeline: Management expects some states with large financial losses to come up for PPP in the next 6-9 months, driven by government incentives including long-term zero-interest loans with PPP caveats.
- Odisha ULA scheme: The government has asked state discoms to implement a utility-led scheme; Tata Power is executing it in Odisha.
- Transmission projects: The 400 kV Koteshwar-Rishikesh transmission line was commissioned; an LOI was received for the Hinjewadi line.
- Bhivpuri PSP and Bhutan hydro: Both projects are at full swing and meeting timelines.
Dr. Praveer Sinha: "There are many states who have huge financial losses. And so, some of those states will be given the opportunity of a long-term loan at zero rate of interest. But there will be certain caveats in terms of they need to go for PPP and only against that they will be given."
Nuclear & Policy
- Nuclear power: Tata Power is in continuous discussion with the government, DAE, NPCIL and NITI Aayog; management expects some projects can start work within the next 24 months.
- Electricity Act Amendment: Expected to be put before Parliament for approval in the budget session.
- Power demand: Demand was muted in Q3 and 9M but saw 7% growth in recent months; summer is expected to be warmer with peak demand of 270-280 GW.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Mundra restart | Begin operations after SPPA closure with Gujarat | End-March 2026 (this month) |
| Renewable commissioning FY26 | Additional 400-500 MW in Q4, taking full-year total to ~2.7 GW | Q4 FY26 |
| Renewable commissioning FY27 | 2.5 GW own capacity, up to 3 GW | FY27 |
| Renewable commissioning FY28 | 2.5 GW, up to 2-3 GW | FY28 |
| Module manufacturing margins | Improve from current ~28% EBITDA as plant learning continues | Ongoing, no date |
| ALMM/DCR transition | Shift to 100% DCR cells and modules | From 1 June 2026 |
| Distribution PPP opportunities | States to come up for PPP driven by zero-interest loan incentives | Next 6-9 months |
| Nuclear project start | Some projects expected to begin work | Within 24 months |
| Debt profile | Maintain conservative debt-to-equity and debt-to-EBITDA despite large CAPEX | Ongoing |
| Maithon debt | Debt to reduce as regulatory asset earns cash; no further CAPEX | Ongoing |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue | Not stated |
| EBITDA | ₹3,913 cr, up ~12% YoY |
| EBITDA 9M FY26 | ₹11,874 cr, up 12% YoY from ₹10,639 cr |
| PAT | ₹1,194 cr, increased marginally YoY despite Mundra being non-operational |
| PAT 9M FY26 | ₹3,702 cr, up 7% YoY |
| Net debt to underlying EBITDA | 3.4x |
| Net debt to equity | 1.2x |
| Mundra losses booked (9M, PAT level) | ~₹800 cr |
| TPDDL regulatory true-up EBITDA impact | ₹460 cr in Q3 |
| Renewable capacity commissioned (FY26 to date) | 2.2 GW, with another 500 MW expected in Q4, totaling 2.7 GW for the year |
| Own renewable capacity added (9M FY26) | 600 MW |
| Rooftop solar executed | 372 MW vs 173 MW YoY |
| Rooftop solar PAT | ₹111 cr vs ₹60 cr YoY |
| Solar cell and module manufacturing PAT | ₹251 cr vs ₹112 cr YoY |
| Solar cell and module manufacturing EBITDA margin | ~28% for Q3, ~24% for 9M |
| Odisha Discoms profit | ₹226 cr vs ₹86 cr YoY |
| Odisha distribution cash earned | ~₹800 cr in Q3 |
| Module sales | 962 MW peak (168 MW ALMM, 795 MW DCR) |
| Maithon FGD recovery impact | ~₹15 cr per quarter |
| FY27 own renewable capacity addition target | 2.5 GW, with potential to reach up to 3 GW |