  1. Merger of Bhubaneswar Power, Angul Energy and ISWP - completion by Q1FY2024-25 Partial - At the FY24 Annual Report, management stated the merger of Bhubaneswar Power, Angul Energy and The Indian Steel and Wire Products Limited with the Company was expected to be completed by Q1FY2024-25, subject to regulatory approvals. The ISWP Scheme became effective September 1, 2024, with ₹426 per share cash consideration approved August 24, 2024; no completion read on Bhubaneswar Power and Angul Energy in the notes.
  2. Proposed merger of seven listed and unlisted entities - value accretive Delivered - At the Announcement 31st October 2022, management stated the proposed merger of seven listed and unlisted entities would be value accretive through faster growth, optimal resource use and greater shareholder liquidity. Five listed and unlisted subsidiaries with cumulative turnover of \~₹19,700 crore in FY2022-23 were successfully amalgamated.
  3. 6 MTPA pellet plant at Kalinganagar - "coming on stream shortly" Delivered - At the Announcement 31st October 2022, management stated the 6 MTPA pellet plant at Kalinganagar was "coming on stream shortly", with phased commissioning of the 2.2 MTPA Cold Rolling Mill complex and the 5 MTPA expansion thereafter. The pellet plant achieved first phase pellet roll out in March 2023, and Kalinganagar Phase 2 is complete.
  4. UK restructuring - up to 2,800 employees potentially affected, 2,500 roles in next 18 months Delivered - At the Announcement 19th January 2024, management stated up to 2,800 employees were expected to be potentially affected by the UK restructuring, with around 2,500 roles impacted in the next 18 months. Total UK redundancies since March 2024 were about 1,900, and UK fixed costs are down nearly 50% over two years.
  5. Public commitment to reduce gross debt by at least $1 billion every fiscal year Partial - At the Announcement 14th September 2021, management committed to reduce gross debt by at least $1 billion every fiscal year before reinvesting surplus free cash flow, targeting 2x net leverage and 4x EBITDA/interest coverage through the cycle. But gross debt rose to ₹84,893 crore by March 2023; in FY2026 only \~₹2,418 crore net reduction was achieved (prepayments of \~₹9,100 crore masked by FX and leases), with gross debt at ₹92,382 crore, net debt \~₹80,100 crore and net debt/EBITDA at 2.3x.
  6. Investment grade financial metrics - achieved within 6 months Delivered - In the FY22 Annual Report, management stated the target of achieving investment grade level financial metrics set at the start of FY2021-22 was achieved within 6 months, with S&P upgrading Tata Steel to 'BBB-' in October 2021. S&P upgraded further to 'BBB' during FY25 and Moody's to Baa2 on 29 May 2026.
  7. Bridge loans for NINL acquisition - paid down through internal cash generation Delivered - In the FY22 Annual Report, management stated bridge loans for the NINL acquisition, a 1 MnTPA long products steel plant, were expected to be paid down through internal cash generation over the next few quarters. NINL was acquired at a ₹12,100 crore investment and generated \~Rs 1,000 crores each of annual EBITDA and free cash flow in FY2025.
  8. Steel Recycling shredder commissioning - expected in May'21 Delivered - At the Q4 FY21 PPT, management stated the Steel Recycling shredder commissioning was expected in May'21 with erection completed. The Rohtak Steel Recycling plant achieved \~280 KT dispatch with revenue \~₹1,255 crore in FY2022-23 and \~100% capacity utilisation in Q4 FY2022-23.
  9. Deleveraging - target of reducing debt by US$1 billion in FY2023-24 Pending - In the FY23 Annual Report, management stated the intention to resume deleveraging in FY2023-24 with a target of reducing debt by US$1 billion, plus working capital release via inventory liquidation. The cited outcome evidence is not on a comparable basis: ₹84,893 crores as on March 31, 2023 is consolidated gross debt, while ₹77,550 crores is net debt as on March 2024, so the targeted reduction cannot be verified from the cited sources.
  10. Planned capital expenditure of ₹16,000 crore for FY2023-24 Delivered - In the FY23 Annual Report, management stated planned capital expenditure of ₹16,000 crore for FY2023-24 to accelerate completion of the Kalinganagar expansion and downstream projects in India. FY2024 capex came in at Rs 18,207 crores, up 29% YoY, exceeding the ₹16,000 crore plan.
  11. UK - commence closure of heavy end assets in June 2024 Delivered - At the Q4 FY24 PPT, management stated the UK would commence closure of heavy end assets in June 2024 and proceed with investment in a state-of-the-art Electric Arc Furnace at Port Talbot. Coke ovens were decommissioned March 2024, Blast Furnace 5 shut July 2024 and Blast Furnace 4 shut September 2024; both Port Talbot blast furnaces are safely decommissioned.
  12. Digital - leader in 'Digital Steel making by 2025' Partial - At the Q4 FY24 PPT, management stated the multi-year business transformation journey intended to be leader in 'Digital Steel making by 2025'. Aashiyana and DigECA achieved GMV of Rs 2,380 crores in Q3FY26, +68% YoY, and digital platforms reached US$1 billion GMV in FY2026, but no read on the 2025 leadership claim in the notes.
  13. Retail - poised to grow 2x in high margin business Delivered - At the Q4 FY24 PPT, management stated retail was poised to grow 2x in high margin business, leveraging pan India growth and branded presence especially Tata Tiscon. Tiscon retail sales more than doubled from 100,000-120,000 tons a month to over 200,000 tons a month, with best-ever annual volumes in FY2026.
  14. Capital allocation - value accretive investments at ROIC of 15% Delivered - At the Q4 FY24 PPT, management stated capital allocation targeted value accretive investments at ROIC of 15%. In 1QFY27, annualised ROIC was \~27% in India and \~15% consolidated.
  15. Board recommends dividend of Rs 3.60 per share Delivered - At the Q4 FY25 PPT, the Board recommended a dividend of Rs. 3.60 per ordinary (equity) share of face value of Rs 1/-. A FY2025 dividend of \~Rs 4,490 crores was paid, and the FY2026 dividend was raised to Rs 4.0 per share.
  16. Overseas debt reduction - only working capital lines by FY2028 On track - At the Q4 FY26 call, management stated by FY2028 overseas debt will go down further when overseas dollar bonds are repaid, leaving only working capital lines for overseas businesses. Overseas debt is down from 50% of total in 2020-21 to 18% in 2025-26, with \~Rs 9,100 crores prepaid from internal cash in the last 12 months.
  17. Jamshedpur 0.5 MTPA finishing capacity - bar rolling start in Q1 FY2026 Delivered - At the Q4 FY25 PPT, management stated the Jamshedpur 0.5 MTPA finishing capacity bar rolling was expected to start in the first quarter of FY2026, with the combi mill furnace already commissioned. The half-million-ton combi mill was commissioned last quarter and has commenced commercial sales of specialty bars and wire rods for critical auto applications.
  18. HRPGL complex in Maharashtra - 0.7 MTPA under construction Pending - At the Q3 FY26 PPT, management stated the 0.7 MTPA HRPGL complex in Maharashtra, a Hot Rolled Pickling and Galvanising Line for automotive, construction and solar sectors, was under construction; at the Q1 FY27 call the HR galvanising line in Tarapur was being added. No completion read in the notes.
  19. Meramandali expansion - 5 MTPA to 6.5 MTPA Pending - At the Q3 FY25 call, management placed the Meramandali expansion from 5 MTPA to 6.5 MTPA in the capacity growth sequence, second after NINL and needing EC clearance; it was planned again at the Q1 FY27 call. Meramandali can go up to 1 crore ton, but no Board approval or FID appears in the notes.
  20. India captive iron ore - 3-3.5 crore tons over next few years On track - At the Q1 FY27 call, management stated newer mines Gandhalpada, MKB and Kalamang, currently <0.5 crore tons, would be taken to about 3-3.5 crore tons over the next few years, implying \~50% captive of \~6 crore tons iron ore need. Iron ore production is close to 4.5 crore tons in FY2026 with \~90% from old mines, and the NINL MKB mines are to be expanded by 1.5 crore tons per annum in phases.
  21. Netherlands CGP closure - planned, controlled closure in the future Pending - At the Q4 FY26 call, management stated the Netherlands CGP closure was agreed in a planned, controlled and safe manner in the future, with the timeline under discussion with Province and Environment Agencies; earlier guidance had the Coke & Gas plant 2 closing "sometime towards 2029", and by Q1 FY27 the discussion was 2028-29 preponement with market-bought coke. Closure cannot be done within the next 12 months.
  22. Thriveni Pellets acquisition - 50.01% stake Delivered - At the Q3 FY26 call, management announced completion of the acquisition of the 50.01% stake in Thriveni Pellets Private Limited. The completed stake in Thriveni Pellets, which holds 100% of Brahmani River Pellets, was consolidated to secure the raw material supply chain.
  23. Tata BlueScope acquisition - balance 50% stake Delivered - At the Q2 FY26 call, management announced a share purchase agreement executed with BlueScope Steel Australia to acquire the balance 50% stake in Tata BlueScope Steel Private Limited, subject to regulatory approvals. The colour coated business was consolidated as Tata Steel Colors Pvt Ltd, the erstwhile 50% JV now a subsidiary.
  24. Ferro Alloy Plant divestment - completion within three months from Nov 2025 Partial - At the Q2 FY26 call, management stated the Ferro Alloy Plant divestment at Jajpur, Odisha was signed and expected to be completed "within the next three months", subject to regulatory and stakeholder approvals, linked to the planned surrender of the Sukinda mining lease. No completion filing appears in the record past the roughly February 2026 deadline.
  25. Steel recycling business - 3 MTPA in India by FY2030-31 On track - In the FY26 Annual Report, management committed to build a 3 MTPA steel recycling business in India by FY2030-31, revised down from the FY22 Annual Report goal of >5 MnTPA capacity by 2030. The Rohtak plant achieved \~280 KT dispatch with revenue \~₹1,255 crore in FY2022-23 and \~100% capacity utilisation in Q4 FY2022-23; no further scale-up read in the notes.
  26. TMILL stake increase - from 51% to 74% Pending - At the Q4 FY26 call, management stated the TMILL stake would increase from 51% to 74% with NYK holding the balance, alongside doubling BRPL slurry pipeline capacity. The buyout of IQ Martrade, the German partner of over 20 years, is in progress with no completion filing yet in the record.
  27. EASyMelt - first industrial demonstration at 'E' Blast Furnace, Jamshedpur Pending - In the FY26 Annual Report, management planned the first industrial demonstration of EASyMelt technology at the 'E' Blast Furnace (649 m³) at Jamshedpur Works in a phased manner, restated at the Q1 FY27 PPT as the world's first industrial deployment. No completion or progress read in the notes beyond the stated intention.
  28. Hisarna demonstration plant - \~1 MTPA in Jamshedpur Pending - At the Q3 FY26 PPT, the Tata Steel Board approved setting up a 1 MTPA demo plant on HIsarna technology in India, with the CFO saying engineering work was commencing ahead of FID. The Netherlands pilot plant is doing quite well with Nucor working closely on the project, and engineering is being done for the India plant.
  29. Maharashtra greenfield - 6 MTPA plant with Lloyds Metals partnership Pending - At the Q3 FY26 PPT, management announced a strategic partnership with Lloyds Metals & Energy to develop an iron ore hub in Gadchiroli and greenfield capacity of 6 MTPA in Maharashtra, envisaged in two phases subject to approvals; at the Q1 FY27 call the volume was recalibrated to "somewhere around 15 MTPA" via three 5-MTPA blast furnaces. Land and mining updates were expected "in the next three months or so" and engineering work has not yet started.
  30. Downstream businesses - at least 50-60% of volume On track - At the Q4 FY26 call, management stated downstream businesses were to be at least about 50-60% of volume. TSK CAL and CGL commercial ramp-up took downstream sales to 53% in 9MFY26, and the auto downstream mix exceeded 50% of nine-month sales in Q3 FY26.
  31. Colors business - double the size in next 12-24 months On track - At the Q4 FY26 call, management stated the Colors business would double in size in the next 12-24 months; at the Q3 FY26 call the CEO said the aim was to double profitability of the color coated business in the next year or two. The colour coated business, now consolidated as Tata Steel Colors Pvt Ltd, has \~600,000 tons capacity with best-ever deliveries in 9MFY26 and capacity expansion to be evaluated next.
  32. Tinplate/packaging - double India capacity, 0.4 MTPA to 1 MTPA On track - At the Q4 FY26 call, management stated packaging would double India capacity as announced last year, with Phase 1 expansion from 0.4 to 0.7 MTPA underway at Jamshedpur; at the Q1 FY27 call the 0.3 MTPA tinplate expansion was on track for completion within the next 30 months. Tinplate posted best-ever domestic volumes in 9MFY26 and record PAXEL edible oil can sales in FY2026.
  33. Wires business - grow from \~600,000-700,000 tons to 1 million tons On track - At the Q4 FY26 call, management stated the wires business would grow from \~600,000-700,000 tons to a million tons, restated at the Q1 FY27 call as from 600 kt to 1 MTPA, with a Q3 FY26 PPT focus on hi-end construction product mix. The current wire business is 600 kt, the expansion is just approved, and wires delivered best-ever quarterly deliveries in Q3 FY26.
  34. Tubes business - grow from \~0.1-0.15 crore tons to \~0.4 crore tons On track - At the Q4 FY26 call, management stated the tubes business would grow from 0.12 crore tons to about 0.4 crore tons, with a 1.5 MTPA to 4 MTPA capacity expansion via an asset light model; at the Q1 FY27 call the horizon was specified as "in the next few years". The business is currently \~0.1-0.15 crore tons, with \~0.03 crore tons added and about 0.04 crore tons planned during FY2027, plus best-ever quarterly volumes in Q3 FY26.
  35. NINL merger with Tata Steel - completion by end of FY2027 Pending - At the Q4 FY26 call, management stated Board approval was received to merge NINL with Tata Steel Limited and the transaction would be completed in FY2027; at the Q1 FY27 call completion was expected by the end of the current financial year. Board approval is in place with no completion filing yet in the record.
  36. FY2027 volume guidance - at least 0.2 crore tons better than FY2026 Pending - At the Q4 FY26 call, management guided FY2027 volume would be at least 0.2 crore tons better than the previous financial year, mostly in India, with full Kalinganagar volume and Ludhiana at only 0.5 million tons as it still ramps. 1QFY27 India crude steel production was \~0.58 crore tons, lower QoQ on scheduled shutdowns and operational issues now behind, with India deliveries \~0.52 crore tons and no full-year read yet.
  37. India deliveries growth - \~0.15 crore tons additional in FY2026 Delivered - At the Q4 FY25 call, management targeted \~0.15 crore tons of net additional deliveries in FY2026, mostly in India, with \~0.2 crore tons extra from Kalinganagar offset by the H blast furnace reline at Jamshedpur and UK volumes flat. FY2026 India crude steel production and deliveries rose 8% YoY to around 2.3 crore tons, best-ever 22.53 MT, an increase of \~0.16 crore tons versus FY2025's \~2.09 crore tons.
  38. Netherlands EBITDA - moving towards €70-80 per ton, eventually €100 per ton Partial - At the Q4 FY25 call, management stated Netherlands EBITDA was moving towards €70-80 per ton and eventually towards €100 per ton, without a specified horizon. Netherlands EBITDA was €39/ton in Q3 FY26 and €34/t in 4Q FY26, with FY2026 EBITDA almost tripling to €267 million; excluding \~€150 million emission rights and \~€50 million US tariff costs, 9M FY26 EBITDA works to \~€93/ton.
  39. FY2027 capex - \~Rs 20,000 crores, 60%+ in India Pending - At the Q4 FY26 call, management intended to increase FY2027 capex to around Rs 20,000 crores with more than 60% spent in India, echoed in the FY26 Annual Report's plan of approximately ₹20,000 crore for FY2026-27. 1QFY27 capex spend was \~Rs 3,579 crores, majority in India, tracking \~18% of the annual plan with no full-year read yet.
  40. FY2026 capex - Rs 15,000 crore with \~75% in India Partial - At the Q4 FY25 call, management planned to spend about Rs 15,000 crores of capex in FY2026 with close to 75% in India, including the last part of Kalinganagar spend, the Ludhiana EAF and asset-reliability projects; the FY25 Annual Report reiterated the ₹15,000 crore plan. FY2026 capex spend was about Rs 14,000 crores consolidated, \~Rs 14,026 crores per the results release, about \~Rs 1,000 crores or \~7% under plan.
  41. India EBITDA margin - 20-22% down cycle, 25-28% medium cycle, Rs 14,000 EBITDA/ton all-weather target Delivered - At the Q4 FY25 call, management framed India EBITDA margin as \~20-22% in a down cycle, 25-28% in a medium cycle and close to 38-40% in an up cycle, with Rs 14,000 EBITDA per ton the all-weather target. India EBITDA margin moved from 21% in 4QFY25 to 24% for FY2026 and 27% in 1QFY27, with EBITDA/ton of Rs 19,162 in 1QFY27, well above the Rs 14,000 target.
  42. India capacity growth - 40 MTPA by FY2030 Partial - Management repeatedly stated a goal of 40 MnTPA crude steel capacity in India by 2030, from the FY22 Annual Report through the Q4 FY23 PPT and Q1 FY24 PPT; at the Q4 FY25 call management softened this, saying "we will not have completed capacity by FY30", and at the Q1 FY27 PPT expansion was framed as from \~27.4 MTPA to 40+ MTPA. \~6.7 MTPA of organic and inorganic capacity was added over the last five years, Kalinganagar Phase 2 complete taking the site from 3 to 8 MTPA, and site optionality of 48-50 MTPA plus 15 MTPA Maharashtra is now cited.
  43. Netherlands cashflow positive - full year FY2026 Delivered - At the Q3 FY25 call, management targeted the Netherlands being cashflow positive for the full next year (FY2026), with transformation program impact flowing from 1QFY26. The Netherlands has been EBITDA and cash flow positive every year in the last 18 years except the blast furnace relining period, FY2026 EBITDA almost tripled to €267 million and the business is effectively net debt free.
  44. Netherlands decarbonisation - DRI-EAF transition, FID and government support Pending - At the Q3 FY25 call, management expected clarity on Netherlands decarbonisation government support over "the next 4-5 months" ahead of FID on the DRI-EAF transition by around 2030; at the Q2 FY26 call a binding agreement and FID were promised "next year". A non-binding Joint Letter of Intent with the Dutch government and Province of North-Holland was signed in September 2025 with support of up to €2 billion intended for phase one, but no FID has been taken; a material uncertainty letter on permit revocation was flagged to going concern, and by Q1 FY27 the company said it would not move till it had clarity.
  45. NINL expansion - 4.8 MTPA long products expansion, FID and commissioning On track - From the Q3 FY25 call, management progressively timed the NINL 4.8 MTPA expansion Board case - FID "in a few months", then "in the next couple of months", then between July and September 2026, with commissioning in FY2029-30 and execution about 35-40 months post-approval. The Board approved final investment on July 30, 2026 at Rs 33,873 crores with a committed 48-month timeline from zero date 01 August 2026 to reach 6.2 MTPA, and site preparation work has started.
  46. Net debt/EBITDA - below 3x, comfort range 2.75-3x Delivered - At the Q3 FY25 call, the CFO targeted net debt/EBITDA below 3 with a comfort range of "somewhere around 2.75 - 3" including growth, refined by Q3 FY26 to "up to about 3x, moving to 3.2x in cyclical stress"; the Q4 FY24 PPT had targeted <2.5x across cycle. Net debt/EBITDA moved from \~3.3x in Q3 FY25 to 3x in Q2 FY26, \~2.6x in Q3 FY26 and 2.3x at FY2026 year end and in 1QFY27, within the stated range.
  47. FY2027 cost transformation - Rs 7,100 crore savings target Pending - At the Q4 FY26 call, management aimed for FY2027 cost transformation savings of \~Rs 7,100 crores versus FY2026 levels, with the results release citing Rs 7,140 crs and the Q1 FY27 PPT restating a Rs 11,500 crores target against an average FY2026 baseline. FY2027 is the current fiscal year and 1QFY27 results do not disclose cost transformation progress against the target.
  48. Group cost transformation - Rs 11,500 crore savings in FY2026 Partial - At the Q4 FY25 call and Q4 FY25 PPT, management targeted further cost takeouts of almost Rs 11,500 crores (\~$1.3 billion) in FY2026 - India Rs 4,000 crores / UK Rs 3,000 crores / Netherlands Rs 4,500 crores - following Rs 6,600 crores achieved in FY2025; the target was reiterated at Q2 FY26. FY2026 delivered Rs 10,868 crores of savings, 95% compliance to plan, with India \~Rs 3,927 crores, UK \~Rs 1,958 crores and Netherlands \~Rs 4,983 crores; the key variation was the delay in TSN restructuring, since completed.
  49. Ludhiana EAF - 0.75-0.85 MTPA scrap-based plant, commissioning by FY2026-27 Delivered - The Ludhiana 0.75 MnTPA scrap and EAF based long products plant, first cited in the FY23 Annual Report with FY2024-25 completion, was rescheduled in the Q4 FY25 PPT to FY2027, then guided to commissioning in 1HFY27 with hot trial started, after earlier hopes of "by the end of this financial year" (FY2026). The first scrap-based 0.75 MTPA Electric Arc Furnace was commissioned at Ludhiana during FY2026, starting March 2026 versus the April 2026 start planned, built in two years at \~Rs 3,000 crore capex and ramping with a 0.5 million ton FY2027 volume expectation.
  50. Kalinganagar Phase 2 - 5 MTPA expansion completion by September 2026 Delivered - At the Q3 FY25 call, management stated "By September of 2026, we would have completed Kalinganagar and then the full benefit will start coming in", with the 5 MTPA blast furnace commissioned in September 2024 and third caster and related facilities expected by September 2025. Kalinganagar Phase 2 is now complete with downstream facilities commissioned and over 25 new grade approvals secured; the site ran at a 0.7 crore tons per annum rate in Sep 2025 and FY2026 India crude steel production rose 8% YoY to \~2.3 crore tons on the ramp-up.