Key Takeaways
- Strong quarter, on track: Revenue grew ~25% YoY with margins in line with guidance despite elevated input costs for transformers and CRGO steel.
- Data center is the story: Chennai capacity uplifted to ~35–40 MW from 24 MW within the same footprint, 10 new logos signed, and an MOU with a global hyperscaler in Andhra Pradesh.
- Order book compounding: Unexecuted order book stands at ₹11,000 crore, up from ₹9,600 crore at June-end, with fresh orders of ₹2,200 crore and another ₹2,100 crore in L1 positions.
- Smart metering entering harvest phase: Madhya Pradesh is fully saturated and cash-generating; the remaining three concessions complete by December with no further capex needed this year.
- What to watch next quarter: Whether the promised "good news" from Chennai and Noida materializes in Q2, the pace of data center customer onboarding, and any quantification of the committed-versus-speculative capex split.
Data Center Build-Out
- Chennai capacity uplift: Designed IT load increased to ~35–40 MW from the originally planned 24 MW without additional land or buildings. The uplift came from re-engineering electrical topology, cooling architecture, and construction sequencing within the same footprint.
- Demand drivers: West Asia conflict pushed deployments toward APAC; available APAC capacity outside India is absorbed; Mumbai is largely committed for 18–24 months. Demand is flowing to other Indian cities with Chennai leading.
- Customer traction: Signed 10 new logos across colocation, cloud, and interconnection, including 2 leading telecom carriers subscribing ~130 kW of IT load.
- Revenue pattern: Data center revenue tracks customer commissioning, validation, and migration cycles; builds gradually for a new operator and compounds as the ecosystem fills in.
- Billing status: Billing currently runs at Gurgaon and Chennai; Mumbai is onboarding customers; Noida follows on commissioning.
- Chennai and Noida expectations: Management expects "very good results" from Chennai and Noida in Q2 itself, but definitely not later than Q3.
Padam Prakash Gupta: "It is no more a kind of a historic growth business. It is very transformative business as of today because of the AI penetration now. So at the moment, we are, we are at a very inflex position in this sector, very privately placed, and expecting very good results out of Chennai and Noida in next, maybe this quarter, Q2 itself, but definitely not later than Q3."
Data Center Pipeline & Expansion
| Facility | Status | Commentary |
|---|---|---|
| Gurgaon | ▲ Fully occupied | Cloud services operations commenced; private, hybrid, and sovereign models live. |
| Chennai | ▲ Capacity uplifted | TIA 942B certified, IGBC Gold; ~35–40 MW designed IT load; billing active. |
| Mumbai | ▲ Commissioned | Customers being onboarded. |
| Noida | ▬ Building | Building plan approved in July; long-lead equipment under manufacturing; commissioning in final quarter of FY27; JV with RailTel under revenue-share model, ~5 MW initial capacity. |
| Kolkata | ▬ Foundation works | Not commissioning before FY28; traction expected around mid-next year. |
| Andhra Pradesh | ▲ MOU signed | ~2 MW with a global hyperscaler; per kW per month basis; pathway to multiple megawatts; more guidance expected end of FY27. |
| Edge network | ▲ Building | Over 100 edge locations across 23 states with RailTel arrangement. |
- Noida absorption: Management expects the entire Noida capacity to be absorbed by central government ministries, departments, CPSUs, or the government ecosystem; described as possibly the only government data center being built today.
- Chennai Phase 2: ₹400 crore budget kept; will be taken up as and when demand comes through, since customer queries are for larger capacity.
- Medium-term ambition: 250 MW of capacity by 2030, anchored on contracted enterprise-led demand.
- Capacity occupation reality: Whenever capacity is occupied, occupation will be anywhere from 25 to 100 MW; the company has to build for it in 9 to 12 months.
Ankit Saraiya: "Our digital infrastructure business was founded on a single conviction that the data center is fundamentally a power asset and that the company which understands power best will therefore build India's digital infrastructure best."
GPU-as-a-Service & AI Demand
- Disciplined approach: The company is not building GPU capacity speculatively; only building where there is committed demand from specific customers with very strong counterparties, at a nascent, measured scale.
- No GPU ownership: Management clarified they are not buying GPUs; only providing infrastructure to house GPUs owned by third parties.
- Anchor commitment: Preparing toward GPU as a service at Noida Edge facility on an anchor public sector commitment.
- AI pipeline: Management stated there is not a single opportunity in the pipeline that is non-AI.
- Lead time pressure: Higher cost of servers, GPUs, and switches, along with supply constraints, will extend lead times for workload migration and deployment after definitive agreements are signed.
Ankit Saraiya: "We are not going ahead and deploying billion dollars of GPU or multi-billion dollars of GPU. Uh, that is not the plan. We are doing it at a very measured level, at a very measured scale, where the counterparty requirements are very well known."
Smart Metering & Transmission
- Madhya Pradesh: Fully saturated and achieved go-live; now in annuity phase and cash-generating mode.
- Remaining concessions: Ranchi, Tripura, and J&K are more than 70% complete (60–80% deployment); all meters completely deployed by December.
- No further capex: No more capital expenditure expected in this segment this year; will be self-funded out of revenue from commissioned meters and lump sum payments on meters going live monthly.
- Collections plan: Plan to collect about ₹450 crore during the year out of smart meter PMPM and lump sum payments; outgo in deploying balance meters only about ₹400 crore.
- O&M economics: O&M is software-based, remotely run and controlled; upside exists from inducting AI and additional services demanded by DISCOMs.
- Transmission monetization: Two transmission assets to be monetized to IndiGrid this year: Ishanagar in Q2 and Dhule in Q3.
- Contracted assets: Contracted assets worth about ₹1,500 crore as of June 2026; as and when these assets get capitalized or monetized they will unlock bottom line.
- RDSS runway: Program runway to March 28th, expected to be further extended to 32.
Financial Performance & Balance Sheet
- Revenue growth: Q1 FY27 revenue grew approximately 25% YoY driven by strong planning and execution across projects despite challenges.
- Margin resilience: Margins are in line with guidance despite elevated input costs for transformers, CRGO steel, and other long lead equipment; advance planning for order placement and vendor relationships sustained profitability.
- EPS decline explained: EPS was lower versus FY26 because last year included income from discontinued business (~₹2 per share); QIP proceeds that were earning investment income have now been deployed toward data center, AMI, and transmission projects.
- Other income decline: Primarily due to deployment of QIP funds for underlying projects since June of last year.
- Balance sheet: Company remains debt-free with net cash position and AA rating.
- Receivables: Sector dues are no longer a challenge because customers want projects completed early; EPC business is self-funded with no additional working capital being provided to support revenue growth.
- Seasonality: Q1 is no more than 15% of annual outlook; H1 is about plus/minus 40%; balance 60% happens in H2.
Padam Prakash Gupta: "Quarter-on-quarter comparison in our type of business is not sound. Be prudent and practical. We have been always highlighting that Q1 is no more than 15% of the annual outlook, and H1 is about plus minus 40%, and balance 60% happens in H2 of the year."
Order Book & Growth Visibility
- Order inflow: Secured fresh orders worth no less than ₹2,200 crore till date, including ₹666 crore for Q1 and balance ₹1,530 crore till date.
- L1 positions: Placed L1 in another ₹2,100 crore of bids with various concession owners.
- Unexecuted order book: Stands at ₹11,000 crore as on date, up from ₹9,600 crore at 30th June 2026.
- Order inflow momentum: Strong and ahead of projections for FY27, giving good visibility for the year ahead.
- Transmission investment backdrop: India expected to invest approximately ₹9 lakh crore in transmission infrastructure between FY26 and FY32; peak power requirement projected to reach around 480 GW by FY32.
- Tax holiday tailwind: Tax holiday provided in last budget to cloud operators serving global customers through Indian data centers has made the country sweeter for capital investments into data centers.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 revenue | ₹4,000 crore or more | FY27 |
| FY27 EBITDA margin | Around 13–14% | FY27 |
| FY27 order book target | ₹4,000 crore, likely to be exceeded | FY27 |
| Top line and bottom line growth | At least 25% this year | FY27 |
| Smart meter deployment | All meters completely deployed | December |
| Transmission asset monetization | Ishanagar to IndiGrid | Q2 FY27 |
| Transmission asset monetization | Dhule to IndiGrid | Q3 FY27 |
| Noida commissioning | Final quarter of FY27 | Q4 FY27 |
| Chennai and Noida results | "Very good results" shared | Q2, definitely not later than Q3 |
| Data center revenue guidance | ₹40 crore | FY27 |
| Data center segment reporting | Start reporting quarterly revenues and bottom line | Second half of FY27 |
| Data center revenue/EBITDA guidance | Better numbers and some guidance | Second half of FY27 |
| Andhra hyperscaler project | More guidance | End of FY27 |
| Kolkata commissioning | Not before FY28 | FY28 |
| Medium-term data center capacity | 250 MW | By 2030 |
| Smart meter monetization | DOT project eligible now; remaining three projects | Next year |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Consolidated revenue | ₹630 cr, +20% YoY from ₹525 cr |
| Standalone revenue | ₹641 cr, +25% YoY from ₹514 cr |
| Consolidated EBITDA | ₹99 cr, +8% YoY from ₹92 cr |
| Consolidated EBITDA margin | 15.79% |
| Standalone EBITDA margin | 13.88% |
| Consolidated PAT | ₹93 cr |
| Standalone PAT | ₹96 cr |
| Consolidated EPS | ₹8.02, lower YoY partly due to ₹2 per share discontinued-business income last year |
| Order inflow, Q1 | ₹666 cr |
| Order inflow, YTD | ₹2,200 cr, including ₹1,530 cr post-Q1 |
| L1 bids | ₹2,100 cr with concession owners |
| Unexecuted order book | ₹11,000 cr as on date, up from ₹9,600 cr at 30 June 2026 |
| FY27 revenue guidance | ₹4,000 cr or more, with 13–14% EBITDA margins |
| FY27 order inflow target | ₹4,000 cr, likely to be exceeded |
| Data center demand pipeline | ~150 MW IT load under active discussion, 30+ open opportunities |
| Data center new logos | 10 signed in Q1, including 2 leading telecom carriers subscribing ~130 kW |
| Chennai data center capacity | ~35–40 MW expected, up from 24 MW originally planned |
| Data center capex, Chennai | ₹524 cr as at 31 March 2026; cumulative portfolio capex ₹628 cr |
| Data center capex, Noida and Kolkata | ₹500–600 cr combined planned |
| Smart meters installed | 18.5 lakh, leaving 4 lakh to install |
| Smart meter project value | ₹2,600 cr revenue commitment under RDSS across 5 states |
| Contract assets | ₹1,500 cr as of June 2026 |
| Cash and current investments | ₹1,250 cr as of 26 June |
| Net cash position | Debt-free, AA rated |