Key Takeaways
- Steady half, diversification underway: Total income rose 13.4% YoY to ₹347 crore, with newer verticals (coal, fly ash, car carrier, freight forwarding, EVs) contributing 11.5% of H1 revenue, up from 5.5% in FY26.
- Profit growth lagged the top line: EBITDA grew 13.7% YoY with a marginal margin uptick to 15.7%, but PAT rose only 9.6% YoY to ₹13.8 crore.
- The balance sheet is stretching to fund growth: Net debt-to-equity reached 1.24x, driven by a working capital increase tied to new, longer-cycle segments like mining. Management has drawn a line at this level.
- Mining is the new, uncertain growth lever: A maiden 5-year, ₹28 crore bauxite mining contract is underway, but the associated transportation revenue, a potentially larger prize, remains unquantifiable until CMDC auctions its output over the next six months.
- What to watch next half: Whether the mining transportation revenue materializes as hoped, the pace of debtor collection in new segments, and if the targeted 85% fleet utilization can be reached without further working capital strain.
Revenue Diversification & New Verticals
- Core FTL dependency shrinks: Top 10 customer revenue share halved from 77% to 49%, driven by deliberate shedding of low-margin routes and order splitting within large groups like Jindal; group-wise concentration remains at 68–69%.
- Coal and fly ash open a volume play: A ₹5 crore multimodal coal contract with Hindalco and a ₹16 crore fly ash contract with Chhattisgarh State Power were secured, with the latter sitting on a ~2 lakh ton inventory growing 5% annually. These tenders are short-tenure (3–9 months) but offer good unit economics and repeat potential.
- Freight forwarding and car carrier build slowly: 10 car carriers were added to the fleet this half, and the company is developing these as additional verticals alongside its core FTL business, though their individual revenue contributions were not broken out.
- Customer base broadens: New relationships were added across mining, fly ash, coal transportation, and EV deployment, while engagement with Tata Motors Passenger Vehicle Limited was strengthened.
Mining: The High-Stakes Debut
- The anchor contract: A 5-year, ₹28 crore work order from CMDC for bauxite mining and excavation at Jamira Park, Chhattisgarh, with 23,500+ tons already mined in H1 against an annual target of 65,000+ tons. Extraction was limited to the last three months due to the rainy season, and transportation only began in October.
- The transportation upside is a black box: Revenue from transporting mined bauxite is billed separately and depends entirely on CMDC’s successful auction of the minerals. Only 4,000 tons moved in October, and management explicitly declined to quantify the potential, calling it “very difficult to evaluate as of now.”
- Unit economics exist but no pipeline: Management described the economics of overburden removal for a specific project type but did not disclose a quantified pipeline or revenue target beyond the CMDC contract.
Lunia: “I think we have, we need to wait for this next six, for the six months to completely understand what would be the additional revenue potential from this work order.”
EV Fleet: Contracts Secured, Cost of Capital in Play
- Deployment begins with anchor clients: Two long-term contracts were secured: an 8-year, ₹38 crore deal with Dalmia Cement (10 EVs in Odisha) and a 5-year, ₹27 crore deal with Jindal Stainless (10 EVs in Odisha). Trials were completed with additional potential customers including Hindalco, Tata Steel, DVC, Jindal Steel and Pipes, and Dalmia Bharat Cement.
- Funding mix tilts toward debt: Of the 20 EVs added, 10 were funded from internal profits and 10 via term loans from Axis and Kotak at ~8%. The future target is a 50:50 split between internal accruals and financing, though management is also evaluating EV leasing options.
- Leasing is 300 bps too expensive for now: EV leasing options from firms like Bertello and Driven were explored but found to be 300 basis points costlier than term loans. Management is still evaluating the strategy, balancing the cost of capital against the benefits of off-balance-sheet financing.
Lunia: “But those leasing costs, when we are comparing it with the financing cost, it is 3%, which is 300 basis point expensive. So, we are evaluating the strategy as to what we should be doing because I have to look at the cost of capital as well, borrowing costs.”
Operations & Fleet Productivity
- Utilization inches up: Fleet utilization improved to 83% in H1 FY27 from 82% in FY26, helped by the new ERP system’s impact on fleet efficiency. The remaining 17% downtime covers maintenance, transit to loading stations, and waiting for placement. The internal target is 85% for FY27, with a benchmark of 87–88% thereafter.
- ERP is a work in progress: The new ERP system is deployed except for the finance module, with full-fledged testing underway. The complete package, covering all transportation and freight forwarding, is expected operational by April 2027.
- Fleet grows to 1,381: 43 vehicles were added in H1: 20 EVs, 10 car carriers, 10 32-feet single axle trailers, and 3 tippers.
Balance Sheet & Working Capital
- Debt rises with the opportunity set: Net debt-to-equity reached 1.24x, driven by a working capital increase to ~₹108–110 crore from ~₹91 crore in FY26. The debtor cycle stretched from ₹72 crore to ₹84 crore as the company entered new segments like mining with inherently longer collection cycles.
- Management draws a line: The internal target is to not breach the current 1.24x leverage level, implying future growth must be funded within this ceiling or through improved cash conversion.
- Operating cash flow guided lower: Full-year FY27 net cash from operating activities is expected at ~₹50–53 crore, incorporating the slightly higher debtor collection cycles.
Lunia: “So the debt position that internally we have targeted should not breach the current level, which is 1.24 times as on H1 FY ’27.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| H2 FY27 revenue | 10–15% higher than H1 FY27 | H2 FY27 |
| Full-year FY27 operating cash flow | Net cash from operating activities of ~₹50–53 crore (management's expectation, incorporating higher debtor cycles) | FY27 |
| Revenue growth trajectory | FY27 vs FY26 growth rate sustained | Next 2–3 years (management's projection) |
| Fleet utilization | Reach 85% (internal target) | FY27 |
| Net debt-to-equity | Not to breach current 1.24x level (internal target) | Ongoing |
| ERP full deployment | Complete ERP package including finance module operational | By April 2027 |
| EV funding mix | 50% internal profits, 50% financed | Future fleet additions |
Key Metrics
| Metric | H1 FY27 |
|---|---|
| Total income | ₹347 cr, +13.4% YoY vs ₹306 cr in H1 FY26 |
| EBITDA (incl. other income) | ₹54.30 cr, +13.7% YoY vs ₹47.8 cr |
| EBITDA margin | 15.7%, vs 15.6% in H1 FY26 |
| Profit before tax | ₹18.5 cr, vs ₹16.8 cr in H1 FY26 |
| Profit after tax | ₹13.8 cr, +9.6% YoY vs ₹12.6 cr |
| Net cash from operating activities | ₹22.8 cr in H1 FY27; full-year FY27 expected ₹50–53 cr |
| Total borrowings | ₹256.9 cr as of Sep 30, 2026 |
| Net debt-to-equity | 1.24x as of Sep 30, 2026 |
| New orders secured | ₹146.11 cr during H1 FY27 |
| Fleet size | 1,381 vehicles as of Sep 30, 2026, 43 added in H1 (20 EVs, 10 car carriers, 10 single-axle trailers, 3 tippers) |
| Fleet utilization | 83% in H1 FY27, vs 82% in FY26; internal target 85%, benchmark 87–88% |
| Strategic verticals revenue share | 11.5% of H1 FY27 revenue (coal, fly ash, car carrier, freight forwarding), vs ~5.5% in FY26 |
| Top 10 customer revenue share | 49% in H1 FY27, vs 77% previously; group-wise share ~68–69% |
| EV payback period | 4.4 to 5 years on long-term deployment contracts |
| Debtor cycle | ₹84 cr, increased from ₹72 cr |