- Soft quarter, heavy provisions: Revenue was soft while EBIT and PBT took a combined hit of Rs. 189 crores from inventory obsolescence and warranty provisions, tied to the wind-down of the large BSNL project cycle.
- BSNL 4G network goes live: The Prime Minister inaugurated the nationwide BSNL 4G network running on 97,500 Tejas RAN-equipped towers, making India the fifth country with a complete 4G/5G technology stack.
- Product portfolio leaps forward: Tejas launched a 64T64R Massive MIMO radio and a 1.2 Tbps DWDM system, while the SL3000 SDR chip entered smartphones and laptops, signaling a shift from project execution to product-led expansion.
- Balance sheet remains stretched: Receivables stand at Rs. 4,026 crores and borrowings at Rs. 4,166 crores, both largely tied to BSNL 4G working capital; management expects these to unwind as milestone collections flow in over the next 2 to 3 quarters.
- What to watch next quarter: Whether BSNL purchase orders land within the financial year as expected, the pace of receivables collection, and any conversion of international operator POCs into commercial orders.
BSNL 4G: The Anchor Event
- Network inauguration: The Honorable Prime Minister inaugurated BSNL's nationwide 4G network, with 97,500 cell towers now running on Tejas' 4G RAN products, a milestone that management frames as proof of execution capability on a project of national scale.
- Financial hangover: The wind-down from this large project cycle triggered a thorough inventory review, resulting in Rs. 145 crores of obsolescence and write-down provisions (contract manufacturing process losses, design changes) and Rs. 44 crores in warranty provisions based on field data on fault rates and repair requirements.
- Working capital lock-up: Receivables of Rs. 4,026 crores and borrowings of Rs. 4,166 crores are both predominantly linked to BSNL 4G order milestones; Rs. 700 crores was collected during the quarter, and management expects significant further collections as milestones complete over the next 2 to 3 quarters.
- Next leg: Management expects BSNL purchase orders to arrive in the current financial year, though shipments may spill into the next year depending on PO timing.
Arnob Roy: "In launching this network, we have become the fifth country in the world to have a complete 4G/5G technology stack."
Product Portfolio & Technology Bets
- New product launches: At the Indian Mobile Congress, Tejas launched the Ojas64 64T64R Massive MIMO radio and a 1.2 Tbps DWDM transmission system, expanding the portfolio to 800 gig and 1.2 terabit capabilities.
- SDR chip integration: The SL3000 SDR chip has been integrated into multiple smartphones, feature phones, and laptops, boosting the direct-to-mobile (D2M) application and opening a new adjacency beyond telecom infrastructure.
- 5G radio portfolio: A brand-new portfolio of radios and baseband units covers the entire frequency band from 450 MHz to 4.9 GHz, with massive MIMO radios at 3.5 GHz and 4.9 GHz; the first 5G RAN deployment was completed under BSNL's captive non-public network program in a coal mine.
- 6G ambition: Tejas is active in 3GPP, O-RAN Alliance, TIP and ITU, developing IP in ubiquitous connectivity, AI use and integrated sensing, with the stated goal of having a 6G product as early as the rest of the market.
- Optical wins: Multiple 400-gig deployments were won across India, Europe, Cambodia, Ghana and Nigeria, and the first 10-gig CPON/combo PON solution was deployed in Europe, giving momentum to international optical expansion.
Kumar Sivarajan: "Our goal is to have a 6G product as early as possible in line with the rest of the market and not lag there."
International & Open RAN Expansion
- Go-to-market strategy: Tejas is targeting developed markets with open RAN architecture (radio units paired with partners' CU/DU software) and developing markets (Africa, Asia, Latin America) with a full 4G and 5G solution. Partnerships with both NEC and Rakuten provide two paths to address O-RAN customers worldwide.
- South Asia POC: A 4G/5G RAN proof-of-concept was completed in a mobile operator's network in South Asia and is expected to convert into a commercial order.
- Engagement pipeline: Management reports multiple engagements with operators in India and international markets that are in fairly advanced stages, though the cycle from initial engagement through technical discussions and POCs is lengthy; some closures are expected going forward.
- Wireline international wins: Tejas won additional BharatNet Phase-3 orders for IP/MPLS routers from multiple system integration partners and is now the supplier of the largest number of packages for that program.
Data Center & AI Connectivity Opportunity
- The connectivity layer: Tejas does not build data centers or the equipment inside them (GPUs, servers); it builds the networking and transmission equipment that provides low-latency, high-bandwidth connectivity between data centers and between users and data centers. As AI data centers are built in distributed clusters, this connectivity requirement grows.
- TCS investment: TCS announced a $4–$5 billion investment in data centers; the connectivity requirements will create an opportunity for Tejas' products, but Tejas must compete for those opportunities. Being related parties gives a fair chance to engage and bid, but business does not come automatically.
- Technology transitions as entry points: Rapid technology transitions to 800 gig and 1.2 terabit give Tejas an opportunity to enter new customer accounts and new territories as its product portfolio evolves.
Profitability & Balance Sheet Health
- Provision breakdown: The Rs. 189 crores in combined provisions (Rs. 145 crores inventory, Rs. 44 crores warranty) are framed as a natural consequence of coming off a large project execution cycle and conducting rigorous reviews of realizable value, obsolescence and marketability, an ongoing process for any manufacturer.
- Project-level profitability: Management states that all projects are bid with an underlying assumption of reasonable profitability and that the company does not have negative profitability for any executed projects; international deployment projects typically carry higher profitability than Indian customer projects.
- Receivables and borrowings trajectory: Both are expected to come down as BSNL 4G-related working capital is realized through milestone collections over the next 2 to 3 quarters.
Sumit Dhingra: "No, generally we don't have negative profitability for any of the projects that we execute."
Management Stance on Guidance & Risk
- No quantitative guidance: Management repeatedly declined to provide breakeven revenue, quarterly or yearly performance numbers, market share targets, 3-year pipeline figures, debt closure timelines, or reserve surplus trajectories, stating this is a consistent policy from the beginning.
- The only stated risk: Execution on product development plans and product success in trials and POCs is the sole risk management explicitly names; the opportunities are clearly there, and the outcome depends on execution.
- Long-term ambition: Over time, the company wishes to participate in a meaningful manner in the global $25–$30 billion annual opportunity and have a reasonable market share, though it declines to specify a number.
Arnob Roy: "The risk would be if you are not able to execute on our plans of our product development. And, if our products don't succeed in the opportunities in the trials, and the opportunities that we have in hand, I would say that is the only risk that we see of not performing."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| BSNL receivables collection | Significant amount of collections from BSNL 4G order-related receivables | Through this year, milestones completing over next 2–3 quarters |
| BSNL purchase orders | Expecting POs to come; shipments may spill depending on PO timing | Current financial year |
| South Asia commercial order | 4G/5G RAN POC expected to convert into a commercial order | Not specified |
| International operator closures | Engagements in fairly advanced stages; expecting some closures | Going forward |
| Borrowings reduction | Expected to come down as working capital is realized | Not specified |
| 6G product availability | Goal to have a 6G product as early as the rest of the market | In line with market timeline |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹262 cr, +30% QoQ from ₹202 cr |
| EBIT | Negative ₹394 cr, compared to negative ₹232 cr in Q1 FY26 |
| EBIT (adjusted) | Negative ₹205 cr, excluding provisions and charges |
| PBT | Negative ₹473 cr, compared to negative ₹297 cr in Q1 FY26 |
| PBT (adjusted) | Negative ₹284 cr, excluding provisions and charges |
| Inventory obsolescence and write-down provision | ₹145 cr, mainly for contract manufacturing process losses and design changes |
| Warranty provision | ₹44 cr, based on potential fault rates and repair requirements |
| Inventory | ₹2,383 cr at quarter-end |
| Receivables | ₹4,026 cr at quarter-end; ₹700 cr collected during the quarter |
| Payables | ₹355 cr, down from ₹580 cr in Q1 FY26 |
| Borrowings | ₹4,166 cr at quarter-end, largely for working capital |
| BSNL 4G towers live | 97,500 cell towers running on Tejas RAN products |
| BSNL network daily data traffic | 4 petabytes |
| BSNL active subscribers | 2.6 crore |
| Patents | 587 total; 39 filed during the quarter |