Key Takeaways
- Chemicals margin miss, self-inflicted: Management admits it failed to raise prices fast enough before commodity costs spiked, while inventory stuck on the water and Russia shipments blocked further compressed Q4 profitability.
- Commodity shock blindsided Q4: Flat steel rose 15%, long steel and BQ plates >20%, and stainless steel tubes well above 20% within two weeks in March, hitting both Energy and Chemicals segments hard.
- Order book strength with pricing discipline: The company walked away from at least two large orders on unacceptable long-term pricing, even as the pipeline grew 20% above pre-COVID levels and multiple capex-heavy segments show continued visibility.
- Solar opex and new segments are live: 25 MW of solar opex orders closed in four months, an SRU project opened refining/petrochemical beyond utilities, and waste-to-energy plus biomass plants are scaling.
- What to watch next quarter: Whether the April-May chemicals recovery sustains through styrene supply tightness, how much of the Q4 price increases stick, and whether softening steel costs flow through to margins fast enough.
Chemicals Segment: The Margin Reset
- Pricing lag was the core problem: The chemicals business, structured as an export-oriented resin unit, absorbed commodity price increases through the year while pushing out freight charges to chase volume growth at the new Dahej plant. Long-term customers received only limited price increases, nowhere near enough to offset the commodity impact.
- Inventory on the water: Revenue and profitability took an additional hit because more inventory was in transit than in any previous quarter, so profitability on those shipments could not be recognised.
- Russia disruption: A couple of shipments to Russia could not be delivered after the customer, an MNC, chose to terminate operations there. The oil field chemicals business was where supplies to Russia got impacted.
- Gas availability squeezed: Both Dahej and Jhagadia plants saw gas availability impacted in Q4, and whatever gas was available came at higher prices.
- Capacity utilization collapsed: The new Dahej plant barely hit 60% capacity utilization in Q4 because of the combined effect of price increases, the Russia impact, and natural gas constraints.
- Pricing model shift underway: In Q4, management moved more customers to a variable pricing model with some link to styrene, targeting 30% to 40% of major customers with such linkage. Big price increase steps were taken in Q4, with results expected to start showing partly in Q1 and later.
- Recovery started but styrene is the wildcard: Recovery from gas and supply chain issues began in April, with a sharper recovery expected in May. The biggest concern is styrene supply, where two plants globally are going through shutdowns.
- Long-term ambition intact: Management is not pessimistic; the chemicals business has well over 50% of revenue from exports and can be a big part of Thermax's long-term growth story. The focus is clearly on double-digit profitability, and in the next one to two years the company wants to be adding capacity.
Bhandari: "So what we did not do well is the raising the prices even before some of this happened, I think we could have done more to increase prices and the reason we did not or we could not as effectively as we would like, was that we have structured our chemicals plant to become more of an export oriented business on the risen side especially..."
Commodity Cost Shock & Margin Impact
- March was the blow-up month: Flat steel rose 15%, long steel and BQ plates rose more than 20%, stainless steel tubes rose well above 20%, and aluminium and nickel spiked more than 1.8%, all within a two-week period. The impact in Q4 was significant and entirely unexpected.
- Chemicals hit harder than Energy: The commodity cost shock had a massive impact on the Chemicals segment, more so than on Energy. Overall, price increases did not cover the impact of commodity price increases, especially in Q4.
- FGD projects a multi-quarter margin drag: Long gestation periods between bid and award (6 to 9 months for government projects) created a cost impact that hit in Q3, Q4, and will have some impact this year and potentially a little bit next year. The NTPC steel price indexing clause only covers part of the cost.
- FGD renegotiations underway: In some cases, Thermax is going back to renegotiate contracts and pricing. For all new projects, pricing has been increased quite a bit. Some softening of steel prices now provides tailwinds on the cost side.
- Energy segment had a tough comp: Margins were also impacted by a very large, highly profitable African project in the prior year that was not repeated. Excluding the Q4 impact, the Energy segment was on track to deliver okay profitability on a percentage basis and very good on total number.
- Q1 relief emerging: In Q1, commodity prices, especially steel prices, are softening. They went up in a big way but are now coming down reasonably faster.
Bhandari: "What happened in Q4 in March was entirely unexpected. The steel that we buy - the flat steel that we buy went up by 15%, the long steel that we buy and the BQ plates we buy went up by more than 20%, the stainless steel tubes that we buy went up well above 20%. All the aluminium and nickel were at 1.8% plus above within a two-week period, so that impact in Q4 was quite a bit."
Order Book & Capex Cycle
- Pipeline up 20% above pre-COVID: Price impact maybe 10%, but volume growth is more than 10%. Plant capacity utilization, labour hours at the plant, and new volume are all going up.
- Large project visibility intact: Refining and petrochemical, steel, and power (FGD portion) segments have continued visibility for capital-intensive projects for at least the next one year.
- Pricing discipline cost some wins: At least two major orders were declined in the last quarter because management was not comfortable with long-term pricing. On the project side, customers that delayed ordering in Q3 and came back in Q4 with the exact same project and scope saw price increases close to 20% (very high teens). Some projects were lost because the customer said the numbers were way out of budget.
- Base order book expectation: Management expects the business to provide roughly ₹1,600 Crores as a base order book, with some softening possible as steel prices come down because of the price impact.
- Cement and steel outlook reasonably positive: Cement went through a lull in Q4 after brownfield projects, but lots of new plants have been announced and the sector is expected to be active again in the three-to-nine-month window. Steel has not slowed down; bigger projects are more set for next year's ordering.
- Steel export duty a mixed signal: The duty will impact steel sector capex a little bit, too early to say by how much. It should moderate demand from steel but give a jump to the overall economy in managing inflation, and Thermax would be a net beneficiary.
- International pipeline stabilizing: Core Southeast Asia markets (Indonesia, Thailand, Philippines, Malaysia) are now getting somewhat more stable, though still not great. The Indonesia plant had a reasonable Q4; if orders can be kept at that number, it can break even and reach profitability in year four of operation.
Bhandari: "I would say, cautiously optimistic and I will say why I would be optimistic in terms of with the rest of the world already talking about a recession and why do we think we are looking at this, with the glass more than half-full."
New Growth Engines: Solar, Waste-to-Energy, SRU
- Solar opex launched and winning: The opex model started only in the last four months, with the team assembled over the preceding three to four months. In that short window, 25 MW of orders were closed. The goal for the first year is 50 to 100 MW, and management is reasonably confident of hitting that number. At least one project will enter revenue streams at the end of this quarter or the beginning of next quarter.
- Solar asset build ambition: Thermax intends to deliver 1 GW over three to five years, with equity contribution of roughly 30% and the rest debt. Capex is expected at ₹50 to 100 Crore in the next one year, potentially exceeding ₹1,000 Crore over five years. Focus is entirely on industrial and core customers, not utility solar.
- Solar market is messy but demand is real: The opex renewables market is disrupted by effects fluctuations, panel availability issues, and shifting local sourcing requirements. Demand is very good; if the market gets some stability on the cost side, a lot of opportunities will fructify.
- Waste-to-energy scaling: Thermax has crossed 30 biomass plants in India on a build-and-operate basis with long-term contracts. Three new orders were received: one for non-recoverable solid waste for paper plants and two for bio-CNG. The company is also putting in its own bio-CNG plant. The Assam 2G ethanol plant commissioning this financial year will open up more projects.
- SRU opens refining and petrochemical beyond utilities: An SRU project won in Assam creates a new segment for Thermax in refining and petrochemical beyond the utility and power block. Management does not expect another such order in the next 12 months, but on a five-year horizon this creates a brand new segment, giving the track record needed to pursue more projects.
- Cement waste heat recovery: Orders are expected to continue this year, with quite a bit of traction also expected from the steel sector on waste heat recovery.
Bhandari: "This creates a new segment for Thermax because SRUs and the many Indian refinery and global refinery projects will need SRUs and doing this project will give us the required track record both internally and externally to do more projects in the future. They may not happen immediately like we do not expect another such order in the next 12 months, but if you look at a five-year horizon, this creates a brand new segment for Thermax."
Segment Performance & Restructuring
- TBWES cracking 20%+ growth: Both standard boilers and high-range boilers businesses are delivering 20% plus growth numbers. Boiler capacity is close to 100% of rated capacity; shifts can be added to increase capacity but only if profitable.
- Services grew massively: Services growth in the last year is repeatable and less prone to falling compared to project businesses like water.
- Water had its best year: The water business grew the top line while keeping bottom-line percentages stable, so overall bottom line improved quite a bit with the growing top line.
- International contribution fell to half over three years: This was due to dependence on one large project. The current focus is on growing the base business through international factories entering more segments rather than relying on single large projects. Management is cautiously optimistic, describing the path as slow but consistent, growing year by year from the current base.
- Industrial products unit created: The company internally restructured to create an industrial products business unit, running it differently from project businesses in philosophy and capability.
- New product launches: A heat pump on the cooling side and products around low heat conversion have been created.
- Construction chemicals: A small business but seeing some strength, with tremendous potential for growth.
- Energy efficiency solutions: Thermax is adding digital capability and taking a solutions mindset with a key account approach. No one in India has done something like this; success is uncertain.
Bhandari: "Our product basket is as good as anybody else, what we need to be able to add as the solutions mindset and an approach very specific key account approach around energy efficiency to be able to win, we are doing that whether that will become successful or not, I do not think anybody in India has done something like this so let us see if we are successful."
FGD, Coal Gasification & Energy Transition
- FGD private side strengthening: More strength is visible from private players than six months ago; multiple customers are now looking to execute projects. On the state side, several projects are in play but Thermax is very cautious and is not an active player working with state electricity boards; that may change as the year goes.
- FGD will remain a discussion point: The margin impact from long-gestation government projects will continue to be an area of discussion in future quarters.
- Refining and petrochemical demand durable: Over the next five years, India's dependency on fossil fuels for transportation, petrochemicals, and plastics will continue to be strong. The requirement for investments in refining, petrochemical, and fertilizer will remain very high; India is far from peak oil demand, unlike global markets.
- Coal gasification actively pursued: Thermax is actively looking at coal gasification technologies, including working on its own technology best suited to address Indian high ash coal. Coal gasification is part of the answer to energy security. However, the technology is in its infancy; scaling to 1,000 to 3,000 times the current plant size will require an intermediate plant and government support.
Bhandari: "Without coal India's energy basket of 20 to 30 years from now you just cannot see how it will happen, because even if you grow solar at 30 to 35 gigawatts a year, you are still be left with a massive energy basket, which you have to fill from somewhere and if you have to figure out how to fill that beyond coal, you cannot depend on fossil fuels."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Chemicals profitability | Double-digit margins; recovery from gas and supply chain issues began April, sharper recovery expected May | Wait for Q1 to run through for visibility |
| Chemicals capacity addition | Add capacity in chemicals business | Next one to two years |
| Solar opex orders | 50 to 100 MW in first year; 25 MW already closed in four months | First year of operations |
| Solar asset build | Deliver 1 GW; equity ~30%, rest debt; capex ₹50–100 Cr next year, >₹1,000 Cr over five years | Three to five years |
| Indonesia plant | Break even and reach profitability if orders sustained at Q4 level | Year four of operation (current year) |
| Base order book | ~₹1,600 Crores, with possible softening as steel prices decline | Ongoing |
| Cement sector ordering | Sector to become active again after Q4 lull | Three to nine months |
| Steel sector large projects | Bigger projects on the anvil | More set for next year |
| SRU follow-on orders | No similar order expected in near term; creates new segment on a five-year horizon | Next 12 months: none; five-year: new segment |
| FGD state side participation | May choose to act on state side; currently very cautious | As the year goes |
Key Metrics
| Metric | Q4 FY22 |
|---|---|
| Order book | ₹3,400 cr |
| Order inflow (FY22) | ~₹9,400 cr |
| Large orders as % of order inflow | ~32%, comprising FGD (₹1,400 cr), sulphur recovery (₹1,200 cr), and large boiler (~₹350 cr) orders |
| Base orders (Q4) | ~₹1,700 cr to ₹1,800 cr |
| Direct big orders (Q4) | ~₹1,600 cr |
| Pipeline improvement vs pre-COVID | More than 20% above in overall pipeline development and health |
| Chemicals business capacity utilisation (Dahej) | 68% in Q4 FY22, down from 76% in Q3 FY22 |
| Chemicals business capacity utilisation (Paudh) | Close to full |
| Resins overall capacity utilisation | 70% to 75% |
| Chemicals business exports share | More than 50% of revenue |
| Chemicals business profitability (prior year peak) | 24% to 25% in a couple of quarters last year |
| TBWES businesses growth | 20% plus growth numbers |
| Biomass plants | Crossing 30 plants in India on build-and-operate basis |
| Solar opex orders closed | 25 megawatts in the last four months |
| Solar opex first-year target | 50 to 100 megawatts |
| Solar assets long-term target | 1 gigawatt over three to five years |
| Solar capex (next one year) | ₹50 cr to ₹100 cr |
| Solar capex (five-year) | More than ₹1,000 cr |
| Project side price increases (delayed Q3 orders) | Close to 20%, very high teens |
| Steel cost increases in Q4 | Flat steel up 15%, long steel and BQ plates up more than 20%, stainless steel tubes up well above 20% |
| Waste to energy orders (Q4) | 3 orders: one for non-recoverable solid waste for paper plants, two for bio-CNG |