- Scaffolding demand cratered, then snapped back: US sales ran at ~50% of 2024 levels from July to November, but December and January returned to original levels, setting up a better Q4.
- Margins hit an all-time low in the core segment: Scaffolding EBIT margin fell to ~8% as revenue halved against sticky fixed costs; management targets a return to 15% next year, conditional on geopolitics and trade.
- Tariff relief is material and immediate: The Russian oil tariff component dropped away, cutting the effective Drum Closures tariff from 50% to 25% and eliminating the company's need to absorb any portion.
- The Formwork slowdown is a timing issue, not a demand problem: Volumes slipped because customer-site approvals from architects and MEP contractors were delayed; the order book still covers roughly 6 months of dispatches.
- What to watch next quarter: Whether the December-January scaffolding sales recovery holds through the March quarter, the pace of the margin climb back toward 15%, and any US trade-deal notification that could further reduce the reciprocal tariff to 18%.
Scaffolding: The Demand Shock and Recovery
- The US slowdown: From July through November, scaffolding sales in the US averaged roughly 50% of 2024 levels as customers deferred capex amid tariff uncertainty and changing trade policy.
- The snapback: December sales returned to original 2024 levels, and January stayed close to that run rate, all before any trade deal was announced. The pickup was demand-driven, not tariff-driven.
- Margin mechanics: Revenue dropped from roughly INR400 crores to INR300 crores, but fixed costs (about 20% of total costs, variable with revenue) did not compress proportionally, driving EBIT margin to an all-time low of ~8%.
- Recovery trajectory: Management expects the January-March quarter to be better than October-December on both volume and profitability, with the scaffolding margin target set at 15% for next year, barring major geopolitical disturbances and assuming the trade deal holds and US demand continues at current levels.
- Capacity doubling still on: The company will double scaffolding capacity for sure; the question is only whether that lands in FY28, FY29 or FY30. Capex guidance remains on track.
- Europe is a green shoot, not yet a driver: Certification was obtained and sales have begun, but volumes have not reached satisfactory levels. Some pickup is visible in Western and Central Europe; management is cautiously optimistic.
Saraf: "July to November, we were at about 50% of our sales levels averaging of '24. December, we were back to our original sales levels. And January also, we are close to that."
Tariffs: The Moving Parts
- Drum Closures tariff halved: The effective tariff dropped from 50% to 25% because the Russian oil tariff component (25%) was removed with immediate effect. The reciprocal tariff remains at 25%, with an expected further reduction to 18% once the US administration issues the official notification, expected in days.
- Absorption eliminated: Under the old 50% regime, the company absorbed 25% and passed 25% to customers. At 25%, the company absorbs nothing. The prior absorption had negligible margin impact because US inventory is minimal (direct customer sales), sales in other territories grew, and rupee depreciation above INR90 helped.
- Scaffolding tariff question mark: The trade deal has not yet materially impacted scaffolding tariffs. Scaffolding falls under Section 232 (steel and aluminium), which carries a 50% tariff irrespective of country of production, so whether the deal changes that rate remains unknown.
Saraf: "The tariff used to be 50%. We were absorbing 25%, and we were passing on 25% to the customer. Now the tariffs are reduced to 25%. So we don't need to absorb anything."
Aluminium Formwork: Soft Quarter, Intact Order Book
- Volume decline is external, not operational: The sequential volume drop from September to December was caused by delays at customer sites in getting drawings approved from architects and MEP contractors. Offtake varies month-to-month based on site readiness, not order book weakness.
- Order book depth: The order book stands at roughly 350,000-400,000 square meters against a monthly dispatch run rate of about 60,000 square meters, implying about 6 months of coverage.
- Competition is rising: New companies are entering aluminium formwork as demand grows in India. Management expects this to play out gradually and filter out over time. Margin impact from formwork was only 1-2 percentage points, not the main driver of the overall margin decline.
- Mach One capacity held back deliberately: Installed capacity is partially available to reach 100,000 square meters, but the company is consciously keeping output at 75,000 due to pricing pressure from more suppliers. Expansion to 100,000 may happen by June as volumes increase in South America, with minimal additional capex required.
- Full-year revenue on track: Formwork is expected to deliver close to INR900 crores for the full year.
- South America is working; Saudi is not: Sales in Brazil, Mexico, Colombia and Uruguay are doing well and described as quite positive. Saudi Arabia has been a disappointment with very few orders; the market is still not ready for advanced systems like aluminium formwork.
Saraf: "Saudi has been a disappointment. We have got very few orders. And I think a lot of what we are seeing is that Saudi is still not ready for advanced systems like aluminium formwork."
Textiles: Gradual Improvement, Garments Still a Drag
- Yarn improving: Q4 is expected to be better than Q3 as markets and margins have improved in orders booked for the next two months.
- Fabric nearing breakeven: The fabric business is almost breaking even and expected to turn a little bit positive in the next couple of quarters.
- Garments still losing money: Operating at roughly 60% capacity utilization, the garments unit is moving toward higher-value products. Management expects capacity utilization to rise to 80-90% in the next 2-3 months as US orders start coming in, supported by restructuring and a strengthened execution team.
Engineering Services and Other Segments
- Engineering margins are seasonal, not structural: The December quarter margin decline follows the same pattern as last year: holidays in November and December mean employees take paid leave while employee costs rise. Margins are expected to return to the normal 15% in the March quarter.
- Engineering growth outlook: The division is expected to grow 25% year-on-year at about 15% margin, with the offshore mix (currently 60%) likely to increase further. Growth may exceed own estimates, led by high-tech enablement.
- IT/designing division: Margins are not impacted by AI replacing work; AI is used only in a limited way. The quarter-on-quarter margin reduction is seasonal, not AI-driven.
- Drum Closures China volume: Going into FY27, the company should be able to average a 10-15% increase in volume; capacity is available.
- Other income jump: Other income rose from INR6 crores to INR28 crores YoY due to mark-to-market of investments; last year Q3 was minus INR8 crores, this time plus INR14 crores.
Capital Allocation and Corporate Actions
- No stock split or bonus on the table: The Board has no current proposal for a stock split. Management said the Board may consider it at an appropriate future time. On bonus shares, management deflected by referencing the buyback and dividend history and said it would be part of the same future Board consideration.
- No new business entry planned: The company is not looking at entering any new business at this point.
- Rental market pushback: An analyst suggested rental equipment payback periods are under 15 months and asked why the company has not explored rentals. Management pushed back, arguing that 15-month payback is only at the gross level and does not account for holding cost, utilization cost (100% utilization is unrealistic), and the cost of lost and damaged material.
Gadodia: "Splitting of the shares so far is not with the Board. Maybe in future appropriate time, the Board may consider that. But as of now, there is no such proposal."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Scaffolding margin recovery | Return to 15% net margin, barring major geopolitical disturbances, if trade deal implementation remains intact and US demand continues at current levels | Next year (FY27) |
| Scaffolding revenue growth | Revenue growth alongside the 15% margin delivery | Next year (FY27) |
| Scaffolding & Formwork segment revenue | Cross INR2,000 crores | Next 3 years |
| Engineering Services growth | 25% year-on-year growth at ~15% margin | Ongoing |
| Formwork full-year revenue | Close to INR900 crores | FY26 |
| Mach One capacity expansion | Expand from 75,000 to 100,000 square meters as South America volumes increase | By June |
| Drum Closures China volume | Average 10-15% volume increase | FY27 |
| Garments capacity utilization | Rise to 80-90% as US orders resume | Next 2-3 months |
| Reciprocal tariff reduction | Further reduction to 18% once US administration issues official notification | Expected in a few days |
| Scaffolding capacity doubling | Double capacity for sure; exact year (FY28/FY29/FY30) not fixed | FY28-FY30 |
| Q4 scaffolding profitability | January-March quarter to be better than October-December quarter | Q4 FY26 |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Consolidated revenue | ₹1,400 cr (Scaffolding + Formwork full-year guidance), Scaffolding segment revenue dropped from ₹400 cr to ₹300 cr |
| Scaffolding segment margin | Close to 8%, all-time low due to volume decline from ₹400 cr to ₹300 cr |
| Engineering segment margin | 9.5%, seasonal decline due to holidays; normal margin is 15% |
| Other income | ₹28 cr, up from ₹6 cr YoY; mark-to-market gain of ₹14 cr vs loss of ₹8 cr last year |
| Scaffolding sales volume trend | 50% of 2024 average levels from July to November, recovered to 2024 levels in December and January |
| Drum Closures US tariff | 25%, reduced from 50%; 25% absorption eliminated |
| Drum Closures China volume | 0.2 crore sets per month, expected 10% to 15% increase in FY27 |
| Aluminium Formwork revenue growth | ₹400 cr higher than last year, full-year guidance of ₹900 cr |
| Mach One order book | 350,000 to 400,000 square meters, about 6 months of orders |
| Mach One sales value (Q3) | ₹200 cr, 117,000 square meters dispatched |
| Mach One sales value (9M FY26) | ₹550 cr |
| Formwork capacity utilization | 75,000 square meters per month, expansion to 100,000 expected by June |
| Garments capacity utilization | 60%, expected to reach 80% to 90% in next 2 to 3 months |
| Cash and cash equivalents (standalone) | ₹405 cr, working capital of ₹390 cr |
| Consolidated gross debt | ₹600 cr, including ₹200 cr term loans across 3 subsidiaries |
| Engineering Services offshore/onsite split | 60% offshore, 40% onsite, stable margin of 15%, expected 25% YoY growth |
| Scaffolding fixed cost | About 20% of total cost |
| Drum Closures US export share | 25% to 30% of segment revenue |
| Scaffolding + Formwork segment 3-year revenue target | ₹2,000 cr |