Key Takeaways
- Nabha acquisition drives thermal EBITDA, offsetting merchant softness: Adjusted thermal EBITDA rose ₹83 cr YoY, with Nabha Power contributing a full quarter (₹142 cr under lease accounting), while merchant profit rates fell ₹55 cr on elevated gas prices.
- Renewables build-out is on track and accelerating: 240 MW peak commissioned in Q2, taking installed capacity to 6.8 GW; 4.4 GW under implementation with ~₹10,000 cr capex planned for FY27, up from ~₹6,500 cr in FY26.
- One-offs obscure the underlying picture: A ₹115 cr Nabha indemnity receipt, a ₹52 cr IOCL force majeure hedge gain, and a ₹44 cr SECI termination charge all landed this quarter, making adjusted comparisons essential.
- Distribution and transmission delivered steady growth: EBITDA rose to ₹99 cr, helped by higher regulated ROE, 3% volume growth in distribution franchises, and a newly commissioned transmission project adding ₹22 cr.
- What to watch next quarter: Whether the 1 GW–1.2 GW FY27 renewable commissioning target stays on track after a seasonally weak Q2, and how the pumped storage project’s stakeholder concerns evolve.
Thermal Generation: Nabha In, Merchant Softens
- Nabha Power contributed its first full quarter, adding ₹142 cr to thermal EBITDA under lease accounting (₹196 cr under PPE accounting), with management reiterating a full-year recurring EBITDA expectation of ~₹1,000 cr.
- Merchant profit rates fell ₹55 cr YoY because elevated LNG prices, driven by Middle East geopolitical developments, compressed the already narrow window of profitable peak-hour selling slots; solar power during day hours further squeezes merchant prices.
- Gas-based PLF outlook is bifurcated: PPA capacities carry two-part tariffs where PLF does not move profitability, while merchant volumes depend entirely on the spread between LNG and market power prices, a dynamic management calls difficult to forecast.
- IOCL invoked force majeure on an LNG contract; the company unwound related Brent hedges, booking a ₹52 cr gain.
- Nabha’s per-unit EBITDA came in slightly lower at ₹0.5–₹0.6 vs a historical ~₹0.8 due to timing differences, expected to normalize.
Management: "I think what one should look at it is INR 1,000 crore of EBITDA run rate every year, on a year-on-year basis."
Renewables: Commissioning Pipeline and a PPA Termination
- 240 MW peak of renewable capacity was commissioned in Q2, taking total installed generation capacity to 6.8 GW as of 30 September 2026.
- The commissioning roadmap is back-end loaded within each year: Q2 is typically lower due to rains, with H2 expected to pick up; FY27 target remains 1 GW–1.2 GW, followed by 1.4 GW–1.6 GW in FY28 and the balance by FY29.
- Three new wind PPAs were won during the quarter: 100 MW with SJVN at ₹3.89/unit, 150 MW with SECI at ₹3.85/unit, and 250 MW with MPPMCL at ₹4.16/unit, all 25-year agreements.
- The SECI 12 300 MW wind PPA was terminated due to evacuation delays, with ~₹40 cr in liquidated damages paid; the project assets are retained and can be redeployed under an alternative PPA or into the merchant market.
- Renewables EBITDA margin, adjusted for the ₹44 cr SECI termination charge, was healthy; one operationalized wind project (Airpower) selling into the merchant market with strong realizations is expected to lift margins going forward.
- C&I renewable projects are tied up and will be progressively commissioned over the next two years, all by 2029.
Vikas Poddar: "The project is still on, and the PPA termination has happened because there was a delay. We do have the opportunity to enter into another PPA or use this capacity for merchant. From that perspective, I think it is not a really huge negative for us."
Distribution & Transmission: Steady, With a Margin Caveat
- Distribution and transmission EBITDA rose to ₹99 cr, driven by ₹76 cr of improved distribution contribution from higher regulated ROE (new tariff regulations), 3% franchise volume growth, and T&D efficiency gains, plus ₹22 cr from a newly commissioned transmission project.
- Distribution revenue rose despite flat unit sales because power purchase cost, a pass-through, increased; management cautioned that EBITDA margins mathematically decline when pass-through costs rise, since revenue also rises, and advised against viewing margins in isolation given ~60% of the business is distribution.
- Steady-state volume growth of 4–5% is the expectation, comparable to GDP growth plus a factor reflecting improving electricity intensity.
- Receivables jumped ~80%, predominantly from the Nabha acquisition and seasonally high Q1/Q2 power demand in license distribution areas; the seasonal portion is expected to liquidate subsequently, while the Nabha portion will remain.
Management: "Typically, on a mathematical side, EBITDA margins will come down. So effectively, I mean, we should not look at purely from an EBITDA margin perspective, considering 60% of our business comes from distribution business."
Gas Strategy: Cargoes Booked, Merchant Optionality Retained
- 10 LNG cargoes per annum have been booked starting calendar year 2027, with volumes earmarked primarily for Torrent Power’s license distribution businesses and some for Torrent Gas.
- Cargoes are linked to Brent on variable contracts; management declined to share the slope or a landed price estimate, citing commercial sensitivity.
- Using cargoes for DGEN merchant generation is a secondary option, considered only if distribution businesses are unwilling to lift; as of now, the allocation is firmly for distribution.
- Merchant gas profits were still decent despite elevated LNG prices, a point management emphasized as evidence of the business’s resilience even in a high-input-cost environment.
Management: "In fact, I look at it in this way that even at these elevated gas prices, we were able to make decent profits in merchant market is concerned."
Project Updates: Thermal, Pumped Storage, and the 800 MW Question
- Anuppur thermal project achieved milestones with BTG and BOP contracts executed during the quarter.
- Both the pumped storage project and the coal-based power plant have achieved financial closure on an SPV basis with long-term loans of 20–25 years.
- The pumped storage project faces stakeholder concerns (reportedly around forest cutting in Maharashtra); management described the matter as “very fluid and dynamic,” said preliminary site work has started, and is engaging with stakeholders while watching developments.
- An 800 MW allocation has been received as replacement for the Ahmedabad coal-based power plant, but management called it “too premature to comment anything on that as of now.”
- On alternate pumped storage sites, management declined to discuss, calling the idea “slightly premature” while the current site’s issues remain unresolved.
Vikas Poddar: "So far, I think the matter is still very dynamic, and we are discussing and trying to address those concerns."
Financial Moving Parts: One-Offs, Tax, and Leverage
- Depreciation and finance costs rose, lowering PBT by ₹270 cr, due to higher capitalizations in the renewable segment and increased finance costs from the Nabha acquisition (including Nabha’s own ~₹3,000 cr borrowing on consolidation) and ongoing capex.
- The effective tax rate rose to 26% from 24% YoY, attributed to a switch to the new tax regime and some subsidiaries turning profitable on a consolidated basis.
- Nabha Power contributed a ₹115 cr indemnity receipt from the seller under the share purchase agreement, related to a mega power status claim liability.
- Management is comfortable with leverage given the long-gestation nature of projects; the company continues to evaluate thermal bids and will participate if commercially attractive.
- Renewables’ impact on consolidated ROCE/ROE is expected to be modest initially, with returns starting lower and catching up a year or two post-commissioning.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Renewable commissioning | 1 GW–1.2 GW commissioned | FY27 |
| Renewable commissioning | 1.4 GW–1.6 GW commissioned | FY28 |
| Renewable commissioning | Balance of 4.4 GW under implementation commissioned | By FY29 |
| Renewable capex | ~₹10,000 cr (vs ~₹6,500 cr in FY26) | FY27 |
| Nabha Power recurring EBITDA | ~₹1,000 cr per year, steady state | Full-year run rate |
| Solapur transmission project | Commissioned | FY27 |
| C&I renewable projects | All tied-up capacity commissioned | By 2029 |
| LNG cargoes | 10 cargoes per annum available for Torrent Power and Torrent Gas | Starting calendar year 2027 |
| Distribution volume growth | 4–5% steady state | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Reported profit before tax | ₹1,131 cr, +15% YoY vs ₹979 cr in Q2 FY26 |
| Adjusted profit before tax | ₹1,008 cr, +6% YoY vs ₹948 cr in Q2 FY26, excluding non-recurring items |
| Tax rate | 26%, vs 24% in Q2 FY26 |
| Thermal generation EBITDA (adjusted) | ~₹543 cr, +₹83 cr YoY; includes first full quarter of Nabha Power contribution |
| Nabha Power EBITDA (lease accounting) | ₹142 cr; ₹196 cr under PPE accounting |
| Distribution and transmission segment EBITDA | ₹99 cr, driven by improved distribution contribution of ₹76 cr and new transmission project contribution of ₹22 cr |
| Renewable operations EBITDA | ₹148 cr, driven by improved PLF across wind and solar and newly commissioned capacity |
| Increase in depreciation and finance cost | ₹270 cr impact on PBT, from higher capitalizations in renewables and Nabha acquisition financing |
| Aggregate installed generation capacity | 6.8 GW as of 30 Sep 2026 (2.7 GW gas, ~1.8 GW coal, ~2.3 GW peak renewable) |
| Renewable capacity commissioned during quarter | 240 MW peak |
| Renewable projects under implementation | 4.4 GW as of 30 Sep 2026; ~1 GW–1.2 GW expected in FY27, 1.4 GW–1.6 GW in FY28, balance by FY29 |
| Capex incurred during quarter | ₹1,850 cr, vs ₹1,550 cr in Q1 FY27 and ₹1,630 cr in Q2 FY26 |
| Total renewable capex under implementation | ₹30,600 cr; cumulative ₹10,000 cr incurred up to 30 Sep 2026; ~₹10,000 cr expected in FY27 |
| Merchant power sold | ~530 MUs, at ~₹24 per unit realization, spread of ₹4.7–₹5 per unit |
| Nabha Power Q2 revenue | ~₹1,100 cr |
| Nabha Power full-year recurring EBITDA expectation | ~₹1,000 cr |
| SECI 12 project termination outflow | ₹44 cr (300 MW wind project terminated due to evacuation challenges) |
| Non-recurring items in Q2 FY27 | ₹123 cr indemnity income (Nabha mega power claim), ₹52 cr gain on LNG hedge unwinding, ₹44 cr SECI 12 termination cost |
| Gas cargoes contracted | 10 cargoes per annum from CY2027; Torrent Power share 4–5 cargoes, each 3.2 TBTU |