Key Takeaways
- Flat reported PBT, adjusted up 6%: Reported PBT nearly flat at ₹619 cr vs ₹617 cr YoY, but adjusted PBT (excluding a ₹35 cr solar stabilization drag) rose to ₹654 cr, lifted by a ₹112 cr distribution improvement that offset an ₹88 cr merchant and LNG decline.
- Distribution is the quarter's engine: The licensed distribution business delivered a ₹112 cr contribution jump from higher volumes, ROE, capex capitalization and regulatory incentives, while AT&C losses in Agra hit a historic low of 6.94%.
- Merchant power hit by gas prices, but a turn is flagged: Elevated LNG at $12–$17 kept merchant sales subdued; management now sees gas prices trending down and points to NVVN tenders and better demand as the path to improvement.
- Maiden equity raise signals a capex-heavy cycle ahead: The ₹3,500 cr QIP, Torrent Group's first in three decades, arrives alongside a pumped storage project, transmission build-out and a renewable capex peak in FY26.
- What to watch next quarter: Whether the NVVN contract extension to October 15 lifts Q2 materially, the pace of land acquisition for the 2 GW pumped storage project, and any concrete update on UP distribution privatization circles.
Distribution: The Quarter's Profit Driver
- ₹112 cr contribution jump: Driven by higher volumes, increased ROE, capitalization of capex, a solar incentive, an O&M incentive and a true-up order adjustment, this segment carried the quarter.
- Agra franchisee at a historic low: AT&C losses fell to 6.94%, down from 58.77% at takeover in 2010, a number management calls among the lowest in India and comparable to global benchmarks.
- UP privatization taking shape: The state is likely to be divided into 5 or 6 circles, with the Ministry of Power involved in tendering; management expects allocation across multiple private players because no single player has the bandwidth to handle all circles. The model will be regulated cost-plus ROE, like Ahmedabad and Surat.
Mashruwala: "They will try to allocate to each of the players because ultimately you need the management bandwidth to handle all 6 circles together. So better for them also we will try to distribute among the private players."
Merchant & Gas: The Drag, and the Turn
- ₹88 cr YoY EBITDA decline in Q4: LNG prices stayed elevated at $12–$17, making merchant sales subdued on high fuel cost and lower demand growth; full-year FY25 merchant EBITDA landed at roughly ₹740–₹750 cr.
- Gas price outlook turning: Management flagged recent downward trends in gas prices and, coupled with NVVN tenders and better demand prospects, expects improvement going forward.
- No medium-term gas contracts in sight: Management sees no medium- or long-term gas contracts being offered because gas prices are uncontrollable, which means offtakers remain exposed to variability; demand itself is too variable to lock in.
- Merchant capacity build-out underway: Wind capacity is doubling from roughly 200 MW to 400 MW, and management may tie up merchant capacities going forward if opportunities arise, citing "lots of potential" in the merchant market.
Shah: "I think right now we don't see any medium term or a long term contract being offered for gas simply because you cannot have control on the gas prices, so there is no pricing confirmation on the gas prices which means the offtaker would also be open for the variability."
NVVN Tender: Extended, Slightly Lower Margin
- Contract extended to October 15: Last year's NVVN tender ran only to June; this year's extension means Q2 will see a direct benefit from the additional operating period.
- Higher committed capacity: DGEN and SUGEN together committed 1,300 MW this year versus 770 MW last year.
- Profitability similar, with a slight downward bias: Management expects current-year NVVN tender profitability to be more or less similar to last year's, with a slight downward bias; slight pricing impact is offset by lower gas purchase costs and operating expenses.
- Key terms undisclosed: Management declined to share the minimum guaranteed offtake volume, the fixed charge per unit, or the spread versus last year, calling the information not disclosable.
Shah: "If I put all together, I think profitability from current year, NVVN tender should be more or less similar to what we have seen last year with a slightly downward bias."
Renewables: Mixed Quarter, Heavy Capex Ahead
- Solar net positive, wind a drag: Solar generation profitability improved by ₹43 cr (an adjustable one-off), partly offset by a ~₹30 cr negative impact from lower wind PLF due to inclement weather, for a net positive of ₹13 cr. The 420 MW solar stabilization created a separate ₹35 cr negative impact excluded from adjusted PBT.
- FY26 is the peak renewable capex year: Management flagged FY26 as a heavy capex year for renewables, with FY27 lower depending on commissioning progress.
- MSEDCL project partly commissioned: 84 MWp out of 367 MWp was commissioned in the quarter.
Pumped Storage & Transmission: The Next Growth Leg
- 2 GW pumped storage project with MSEDCL: A first-of-its-kind energy storage facility agreement in India, supplying 2,000 MW from a storage hydro project for 40 years. The project is under statutory approvals and land acquisition; construction and ordering will start after approvals and land possession.
- Land not yet acquired: Management stated plainly, "we have not got the land as of now," though it described progress as "fairly ahead" and expects to get land "in very short time." The 48-month commissioning clock has started from PPA signing, but management called it "too early to comment on the timeline" when pressed on delays and remedies.
- Capex phasing: Some capex will start in the current year for land acquisition and initial equipment payments; major capex will occur in FY26–FY27 and FY27–FY28.
- Two transmission projects nearing completion: Projects amounting to ~₹1,200+ cr are likely to be commissioned in FY26, with no material delay or evacuation concerns; balance capex of ~₹900–₹1,000 cr is assumed for FY26.
Shah: "I think we have not got the land as of now."
Capital & Optionality
- Maiden ₹3,500 cr QIP: The first equity raise by Torrent Group in three decades, positioning the balance sheet for the coming capex cycle across pumped storage, renewables and transmission.
- Thermal expansion under evaluation: Management is evaluating both brownfield and greenfield thermal opportunities from the state side but has not committed to anything.
- Deferred tax one-off: A ₹637 cr one-off reversal of deferred tax liability was completed entirely in Q4 FY25, a non-cash item that reduced the tax expense for the quarter.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| NVVN contract benefit | Extended operation period to October 15 benefits Q2 directly | Q2 FY26 |
| Renewable capex peak | FY26 will be a heavy capex year for renewables; FY27 lower depending on commissioning | FY26 |
| Pumped storage capex start | Some capex begins in current year (land, initial equipment); major capex in FY26–FY28 | Current year onward |
| Transmission commissioning | Two projects (~₹1,200+ cr) likely commissioned; no material delay or evacuation concerns | FY26 |
| Transmission balance capex | ~₹900–₹1,000 cr assumed for FY26 | FY26 |
| Merchant capacity build-out | Wind capacity doubling from ~200 MW to ~400 MW; may tie up more merchant capacity if opportunities arise | Ongoing |
| Gas-based power improvement | Expect improvement as gas prices trend downward, with NVVN tenders and better demand | Going forward (undated) |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Reported PBT | ₹619 cr, up ₹2 cr YoY from ₹617 cr |
| Adjusted PBT | ₹654 cr, up 6% YoY from ₹617 cr, excluding ~₹35 cr solar stabilization impact |
| Revenue | Not stated |
| Operating margin | Not stated |
| Distribution business contribution | Improved by ₹112 cr YoY, driven by higher volumes, ROE increase, CAPEX capitalization, solar incentive, O&M incentive, and true-up order adjustment |
| Demand growth | ~4% across all distribution areas |
| Merchant power and LNG sale contribution | Lower by ~₹88 cr YoY, due to elevated LNG prices trading between $12 to $17 |
| Solar generation profitability | Improved by ₹43 cr (adjustable one-off) |
| Wind PLF impact | Negative impact of ~₹30 cr due to inclement weather |
| Renewables net impact | Positive ₹13 cr |
| Aggregate installed generation capacity | 4.8 GW as of March 31, 2025: 2.7 GW gas, 1.7 GW renewable, 362 MW coal |
| Renewable pipeline | 3.1 GWp under development |
| Pumped storage pipeline | 3 GW under development |
| Distribution loss (licensed business) | 2.34%, among the lowest in the country |
| Agra franchisee AT&C losses | 6.94%, historical low, down from 58.77% at takeover in 2010 |
| Net debt to equity | 0.40x |
| Net debt to EBITDA | 1.41x |
| CAPEX FY25 (ex-renewables) | ~₹1,900 cr: license distribution ~₹1,300 cr, franchisees ~₹275 cr, transmission ~₹250 cr |
| CAPEX FY25 (renewables) | ₹2,500 cr |
| CAPEX guidance FY26 (distribution) | ₹2,000 cr: license distribution ₹1,750 cr, franchisee distribution ₹250 cr |
| Renewable total expected project cost | ~₹20,600 cr, with ~₹2,500 cr incurred to March 2025 |
| NVVN tender capacity tied up | 1,300 MW (DGEN 1,150 MW, SUGEN 150 MW), up from 770 MW last year |
| NVVN tender operation period | March 16 to October 15, extended from June last year |
| NVVN minimum guaranteed offtake | 2,300 MU over 6 months till October |
| Merchant EBITDA full year FY25 | Roughly ₹740–₹750 cr (per an analyst's math) |
| Deferred tax one-off reversal | ₹637 cr, recognized in Q4 FY25 |
| Transmission CAPEX FY26 (two projects) | ~₹900–₹1,000 cr (per an analyst's math) |