Key Takeaways
- Adjusted PBT up 16% YoY, but one-offs dominate the print: Excluding a ₹171 cr UNOSUGEN provision, Q4 PBT rose to ₹718 cr, while reported numbers were dragged by the regulatory disallowance that management expects to reverse on appeal.
- Generation segment swung to a YoY loss on maintenance and base effects: Adjusted thermal EBITDA fell ~₹90 cr YoY on scheduled maintenance and the absence of a prior-year provision reversal, while renewable EBITDA was flat/lower despite capacity adds as a key generation-based incentive expired.
- The capex super-cycle is now explicit, with no ceiling given: Management called FY27 capex "much, much higher" than FY26 but declined to quantify it, while confirming leverage headroom exists for incremental thermal and renewable projects beyond the committed pipeline that runs to FY31-32.
- Gas is a price story, not an availability story: Ample spot LNG exists, three summer cargoes are secured from non-Persian Gulf sources, and long-term BP/JERA supply starts CY27, but the ₹16-20/mmbtu price makes merchant power uneconomical until costs subside.
- What to watch next quarter: Nabha Power acquisition closure and consolidation, the pace of MSEDCL and SECI 12 commissioning, and any quantification of FY27 capex.
The UNOSUGEN Provision: What It Is and Why It May Reverse
- A ₹171 cr one-off dragged reported PBT: The Gujarat regulator capped power purchase costs for UNOSUGEN projects in the FY24-25 true-up order, forcing Torrent to book a provision that turned an otherwise strong quarter optically weak.
- Precedent favours reversal: A similar cost cap in an earlier year was contested and subsequently approved in Torrent's favour, resulting in a ₹273 cr credit booked in Q3 FY26. Management is "reasonably certain" the current matter will also be approved.
- Adjusted PBT tells the real story: Excluding this provision, Q4 FY26 PBT rose 16% YoY to ₹718 cr, driven by favourable regulatory orders, solar rooftop incentives, and higher returns on equity under the new tariff regime.
Mashruwala: "Considering prudence, provision has been recognized in the current quarter. Based on the past precedent, we are reasonably certain that the current matter will be also approved in our favour."
Generation: A Quarter of Maintenance and Expired Incentives
- Thermal generation swung lower YoY: Adjusted contribution fell ~₹90 cr, driven by ~₹40 cr of additional O&M from scheduled maintenance at gas-based plants and the absence of a provision reversal that had benefited Q4 FY25.
- Renewables EBITDA was flat to lower despite capacity additions: The primary culprit was expiry of a Generation-Based Incentive on one project where the statutory 7-10 year benefit period ended, and the GBI amount was significant.
- LNG and merchant gains were not material in both comparable quarters: Q4 is a winter quarter with typically less merchant and LNG sales; neither Q4 FY26 nor Q4 FY25 had material gains to report.
- Gas-based generation faces a structural price hurdle: At current $16-20/mmbtu LNG prices, selling into the merchant market is "very difficult." IOCL gas is under force majeure, and ONGC/Reliance domestic gas is pooled for priority sectors, leaving Torrent reliant on spot cargoes where DISCOM willingness to pay high variable costs determines offtake.
Shah: "I think the question is the price, not availability of gas. So, for demonstrating availability, we can — gas is amply available. Now whether DISCOM is willing to take that gas and use that electricity at high rates or they can — they are able to manage it from buying it from the merchant market, that balancing will have to be done."
The Capex Super-Cycle: "Much, Much Higher" with No Ceiling
- FY27 capex will be materially above FY26, but unquantified: Management declined to give specific guidance when asked if FY27 would be ~2x FY26, saying only that it would be "much, much higher." Committed capex runs through FY31-32 with well-balanced phasing.
- Balance sheet capacity is explicitly not a constraint: Leverage ratios are "quite comfortable," and management stated there is "no restriction" on leveraging for further investment opportunities. Leverage falls significantly once projects commission and EBITDA starts contributing.
- Distribution capex is locked in at ~₹2,000 cr/year for 4-5 years: This recurring spend across licensed distribution areas adds a visible, multi-year base load to the capex profile.
- Incremental thermal and renewable projects are being actively pursued: A couple of states are contemplating announcing thermal capacity, and Torrent is actively looking to bid. On the renewable side, 860 MW of C&I capacity is under construction, with openness to tying up more as consumers become available.
Mashruwala: "The power sector are in an investment phase right now and our leverage ratio is quite comfortable. And with the committed capex also, we don't see that the leverage will exceed beyond our reach... So there is no restriction, I would say, in terms of leveraging to take up any further opportunities for investment."
Project Pipeline: What Commissioned, What's Next, What's Held Up
| Project | Status | Timeline |
|---|---|---|
| Khavda Transmission | Commissioned in Q4 FY26 | Complete |
| MSEDCL 367 MW renewable | Most capacity commissioned and billing started; remaining held up by unsuitable government lease land in Nashik | 6-9 months, subject to replacement land |
| SECI 12 renewable | Extension applied for | COD before March 2027 |
| 1.6 GW thermal (MP) | PPA executed with MP Power Management; BTG and BoP LoA issued; environmental clearance received | Under construction |
| 3 GW pumped storage hydro | Energy storage agreement with MSEDCL executed; civil, hydro-mechanical, electrical & mechanical LoAs issued; environmental clearance received | Under construction |
| Nabha Power acquisition | CP compliance underway with L&T; consolidation expected from Q1 FY27 | June 2026 (Q1 FY27) |
| 4 GW renewable projects + Solapur transmission | Under implementation | Not specified |
| 603 MW merchant renewable | Construction proceeding; may be allocated to future tenders/bids so may not remain merchant for life | Not specified |
- Nabha Power will consolidate from June/Q1 FY27: The transaction is in the conditions-precedent stage with L&T, and management expects to close and begin consolidating numbers in the current quarter. Tariff details were not disclosed on the call.
- MSEDCL's hold-up is a land issue, not a demand or offtake problem: The government-provided lease land in Nashik is not ideally suitable; replacement land has been requested and commissioning of the held-up capacity is expected in 6-9 months.
- The 603 MW merchant renewable project carries an embedded option: Management reiterated that while the capacity is being built as merchant, it may be allocated to tenders or bids won in future, so it may not remain merchant for the project's life. No battery addition is currently planned but may be added later if required.
Regulatory Tailwinds: ROE Uplift and Recurring Carrying Costs
- The new ROE/ROCE regime is a net positive: Pre-April 2025 assets continue on a regulated equity base but now earn performance-linked incentives, effectively lifting ROE from 14% to 15%. New assets earn a base ROE of 13%, scaling up to 15% if performance milestones are met. [2-3]
- Carrying cost income is now a "normal feature," not a one-off: The ₹186 cr of carrying cost on regulatory assets booked in the T&D segment this quarter is treated as recurring because regulatory assets attract carrying costs approved each year. Management expects this to continue as regulatory assets remain on the books.
- The regulatory gap narrowed by ~₹800 cr: Better operational efficiency and lower power purchase costs drove the reduction, with FPPPA remaining unchanged YoY.
- T&D loss savings faced a normative headwind: Regulators significantly reduced normative parameters, partially offsetting the benefit. Distribution franchisee business improved T&D losses by ₹15 cr, providing a partial offset.
Mashruwala: "It's basically normal since we are carrying regulatory asset, it's bound to happen that we are going to get the carrying costs as and when on most of the orders coming in. So, it's a normal feature, I would say. It's not — may not be considered as a one-off."
Gas Strategy: Securing Supply, Waiting on Price
- Three summer cargoes are locked in from safe sources: Two cargoes already received, one expected in June; all three are from non-Strait of Hormuz sources and therefore not impacted by Iran-related disruptions. Pricing is fixed and below spot, though management declined to confirm the ~$10/mmbtu figure suggested by an analyst.
- Long-term LNG supply begins CY27: The BP and JERA contracts will deliver ~10 cargoes per year combined, with 5 earmarked for Torrent Power. Management expects no material supply issue from these arrangements.
- Post-June, SUGEN/UNOSUGEN will rely on spot and short-term cargoes: Gas is amply available globally, but the price point will determine whether DISCOMs offtake gas-based power or buy from the merchant market. A global gas glut is still expected, though the Iran conflict may push back the timing.
- Merchant gas is a call option on lower LNG prices: Management's expectation is that once high LNG costs subside, India's power deficit will allow merchant capacities to earn decent profits, as they have over the last 4-5 years. But buying a cargo purely for peak demand is logistically impractical; some baseload offtake is needed.
Shah: "You can't buy a cargo only for the peak market. So, you need some basic demand for RTC wherein you then book the cargo and then supply. So, on a — it is not just peak market for which you buy a cargo. There are logistical issues also involved."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Nabha Power acquisition close | CP compliance underway; consolidation from Q1 FY27 | June 2026 (Q1 FY27) |
| MSEDCL pending capacity commissioning | Remaining capacity held up by unsuitable lease land; replacement land requested | 6-9 months |
| SECI 12 COD | Extension applied for | Before March 2027 |
| FY27 renewable commissioning | 1.2-1.4 GW expected | FY27 |
| LNG supply from BP/JERA | ~10 cargoes/year combined,5 for Torrent Power | Starting CY27 (FY28) |
| Distribution capex | ~₹2,000 cr/year | Next 4-5 years |
| UNOSUGEN provision recovery | Management "reasonably certain" of approval based on past precedent | Not specified |
| FY27 capex | "Much, much higher" than FY26; no specific guidance | FY27 |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Reported PBT | ₹547 cr, down from ₹619 cr in Q4 FY25 |
| Adjusted PBT | ₹718 cr, up 16% YoY from ₹619 cr, excluding ₹171 cr nonrecurring provision |
| Reported EBITDA | ₹1,220 cr |
| Adjusted EBITDA | ₹1,391 cr, after adding back ₹171 cr one-off provision (per management) |
| Generation segment reported EBITDA | -₹39 cr; adjusted EBITDA of ₹132 cr after adding back ₹171 cr one-off, down from ₹233 cr in Q4 FY25 |
| Renewables segment EBITDA | ₹186 cr, flattish to lower YoY, impacted by expiry of generation-based incentive on one project |
| Transmission and distribution segment EBITDA | ~₹1,110 cr, including ₹186 cr carrying cost order (per management) |
| Full-year FY26 LNG and merchant gains | ~₹675 cr, on ~1,400 MUs sold |
| Regulatory gap reduction | ~₹800 cr, backed by operational efficiency and lower power purchase costs |
| Aggregate installed generation capacity | 5.1 GW as of 31 Mar 2026: 2.7 GW gas, 2 GW renewables, 362 MW coal |
| FY26 full-year capex | ~₹9,350 cr: Renewables ₹6,500 cr, License distribution and franchisee ₹1,600 cr, Thermal (coal) ₹700 cr, Transmission ₹550 cr |
| FY27 capex outlook | Much higher than FY26; management confirmed ~₹80,000 cr total capex over next 5 years is a fair assumption, with coal at ~₹23,000 cr |
| Renewable capacity under implementation | 4 GW, with capex plan of ₹28,000 cr |
| Pumped storage hydro under implementation | 3 GW, with investment plan of ~₹14,000 cr |
| Nabha Power acquisition enterprise value | ~₹6,800 cr, with ~₹3,400 cr debt; transaction expected to close in June FY27 |