Key Takeaways
- Revenue exploded, margins compressed: Q2 FY27 revenue hit ₹811 cr, up ~606% YoY, but EBITDA margin fell to ~14% as maize prices spiked 25–30% in the seasonally toughest quarter.
- The CBG build-out is now live: The first JV plant with Sumitomo is commissioned, three more are imminent, and policy tailwinds under GOBARdhan 2.0 have materially improved the unit economics.
- Ethanol pricing is a raw deal: The government cut maize-based ethanol realization by ₹3/liter despite rising input costs, a move management calls illogical, with El Niño threatening to squeeze raw material supply further.
- A non-core asset sale unlocks cash: The Badami plant slump sale will repay ~₹125–130 cr of debt, free up working capital, and save ~₹22 cr annually, a clean capital-allocation move.
- What to watch next quarter: Whether the expected 45 cr liter ethanol allocation materializes, the pace of CBG revenue contribution from new plants, and any government revision on maize ethanol pricing.
Ethanol: Volume Surge, Margin Squeeze
- Volume engine running hot: H1 FY27 ethanol sales reached 19.07 cr liters, with 8.5 cr liters of orders still left to supply from the last ethanol supply year, providing near-term volume visibility.
- Allocation tailwind from sugar bans: The ban on sugarcane juice and B-heavy molasses removes ~30–38% of last year's supply, creating a ~300 cr liter shortage that benefits dual-feed grain-based plants like TruAlt.
- Tender rules leveled the field: OMCs removed surplus/deficit state barriers, so plants in grain-surplus states like Karnataka and Bihar can now supply anywhere, improving allocation prospects.
- Raw material costs bit hard: Maize prices rose 25–30% in Q2, the seasonally lowest-margin quarter, and El Niño is expected to shrink maize acreage by ~35% next year, signaling sustained input cost pressure.
- Realization cut defies logic: The government reduced maize-based ethanol prices by ~₹3/liter, pushing blended realization down to an expected ~₹64–65/liter this year from ~₹67, a headwind management hopes will be revised but cannot count on.
- Dual-feed flexibility is the hedge: Three plants converted to grain-based can switch between maize, rice, and other feedstock, while one 400 KLPD unit will run on C-molasses for ENA production, which costs ₹1.5–2/liter less to produce.
- DDGS provides a partial offset: Byproduct prices have risen to ₹26–30/kg with no additional cost, contributing directly to the bottom line and partially cushioning the ethanol realization dip.
Vijay Nirani: "Should have definitely done that considering the prices that has increased, they should have increased the price of maize-based ethanol. But in fact, they've reduced the price by almost INR3 a liter. We don't see the logic in it, but it is what it is now."
CBG: The Next Growth Leg
- First plant live, two more this quarter: The 20 TPD JV plant with Sumitomo is commissioned and ramping up; two additional plants are expected to commence within the quarter, taking installed capacity to ~72 metric tons/day.
- Policy transformed the math: GOBARdhan 2.0 doubled the capital subsidy to ~₹2 cr per ton, raised the per-plant cap to ₹30 cr, assured gas offtake at ~₹104/kg (up from ₹84) with a take-or-pay clause, and locked in pricing for 10 years.
- Revenue and margin visibility: A single 20 TPD plant at full utilization is expected to generate ~₹80 cr top line; three plants combined target ~₹240 cr, with EBITDA margins expected to settle at 50–55%.
- Working capital is light: CBG plants run on press mud or spent wash that costs "hardly anything," so even at 100 TPD scale, maximum working capital requirement is only ~₹25–30 cr.
- Capex is manageable and partly subsidized: Four to five new plants with GAIL will cost ~₹65 cr each (~₹300 cr total), with ₹70–80 cr of debt to be raised; the ₹2 cr/TPD capital subsidy will directly reduce term debt, with ~₹25–30 cr expected by December or January.
- Revenue contribution starts in Q4: CBG plants are expected to begin generating revenue from January, with 2–3 plants adding ~₹20 cr of segmental revenue in the remaining two quarters of FY27.
Anand Kishore: "The working capital is not going to impact much because the major working capital with these plants will either run through the press mud or spent wash of the CBG plants. The press mud costs you hardly anything means that is where this CBG business crux margin lies in the EBITDA margin of around 60% to 70%."
ENA & Industrial Alcohol: An Emerging Opportunity
- ENA economics are improving: ENA production costs ₹1.5–2/liter less than ethanol, and long-contract prices at ₹62–63/liter make it more attractive; one 400 KLPD unit is proposed to run on ENA full-year using C-heavy molasses.
- Supply crunch supports pricing: A large chunk of molasses-based capacity will not participate in alcohol supply due to the syrup/B-heavy ban, while demand stands at 1,100 cr liters for OMCs plus ~280 cr liters for potable alcohol, creating a capacity crunch that should lift ENA prices.
- Industrial alcohol import substitution: International rectified spirit prices have jumped from ₹47–48/liter to ₹58–60/liter, opening an opportunity for Indian manufacturers to capture 40–50% of the 250–300 cr liter industrial alcohol demand domestically.
Vijay Nirani: "There's a huge chunk of capacity that won't be participating in the supply of alcohol. So that leaves us opportunity for the grain-based plants. So, considering the demand of 1,100 crore liters in the current tender for OMCs and about 280 crore liters of average potable alcohol consumption, we will have more — there is a crunch in the capacity available. So, prices of ENA should improve."
Balance Sheet & Capital Allocation
- Operating cash flow turned positive: H1 FY27 generated ~₹192 cr of cash from operations, a meaningful swing that signals underlying operating strength despite margin pressure.
- Working capital unlocked: Inventory was drawn down sharply from ~₹528 cr (March 2026) to ₹206 cr (September 2026), and trade receivables reduced from ~₹406 cr to ₹367 cr, releasing cash.
- Badami sale is a clean deleveraging move: The slump sale of Unit 5 will repay ~₹125–130 cr of term loans, free up ~₹40–46 cr for working capital, and save ~₹22 cr annually in interest and employee costs.
- Promoter pledge question deflected: When asked how promoters intend to repay pledge amounts and at what haircut price, management called it a personal matter irrelevant to the company and declined to elaborate.
- Promoter stake near ceiling: Promoter holding is at ~71%, with only ~3.5–4% headroom to the 75% legal limit; pledges are for future purchases to increase holding.
Raw Material & Margin Outlook
- Q2 is always the trough: Margins are seasonally lowest in Q2 when summer ends and agrarian raw material availability is scarce; improvement is expected from Q3 and Q4 onward.
- El Niño threatens the next cycle: Acreage drops of ~35% for maize, ~10–12% for rice, and ~10–12% for sugarcane are expected next year, which will keep raw material prices elevated and squeeze margins.
- Stocking strategy to stabilize costs: Management plans to source raw material across Bihar, Madhya Pradesh, and Punjab, and stock up for the full year at the cheapest available prices using IPO proceeds and working capital limits.
- Gross margin guarded: Current gross margin is ~30%; management expects it to remain "somewhat plus only" depending on allocation, but declined to provide a precise range.
- Raw material cost target: Raw material contribution is expected to stay below 70% going forward.
Vijay Nirani: "Usually, Q2 is the most difficult period because that's when summer is over and there's not much of raw material agrarian products available. So, whatever the Q2, whenever each of the years will have the lowest margins. It should improve from Q3, Q4 onwards."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Ethanol allocation | At least 40–42 cr liters, with expectation of 45 cr liters | New ethanol supply year (Nov–Oct) |
| Capacity utilization | Average at least 75–80% going forward | Ongoing |
| CBG plants operational | 3 additional plants (TruAlt Sumi Gas JV) to commence | Next quarter (Q3 FY27) |
| CBG revenue contribution | ~₹20 cr segmental revenue from 2–3 new plants | Remaining two quarters of FY27 |
| CBG capex with GAIL | 4–5 plants at ~₹65 cr each (~₹300 cr total); ₹70–80 cr debt to be raised | Construction to start |
| CBG subsidy receipt | ~₹25–30 cr (25% of eligible subsidy) | December or January |
| Badami sale proceeds | Repay ~₹125–130 cr term loan; free ~₹40–46 cr working capital | On completion of slump sale |
| Promoter holding | Continue building up to 75% legal limit | Ongoing |
| SAF capex | Start once government road map and incentive policy are announced | Awaiting government clarity |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹811 cr, +606% YoY and up from ₹627 cr in Q1 FY27 |
| H1 FY27 revenue from operations | ₹1,438 cr, +243% YoY |
| EBITDA | ₹114 cr, margin 14.03%; Q2 FY26 had negative operating profitability |
| H1 FY27 EBITDA | ₹261 cr, margin 18.2% |
| Profit after tax | ₹35 cr, compared with loss of ₹38 cr in Q2 FY26 |
| H1 FY27 profit after tax | ₹94 cr, compared with loss of ₹33 cr in H1 FY26 |
| H1 FY27 cash flow from operating activities | ₹192 cr |
| H1 FY27 capex (PPE and CWIP) | ₹180 cr |
| Debt-to-equity ratio | 0.55x as of 30 Sep 2026 |
| Inventory | ₹206 cr as of Sep 2026, reduced from ₹528 cr in Mar 2026 |
| Trade receivables | ₹367 cr, reduced from ₹406 cr in Mar 2026 |
| Ethanol volume sold in Q2 | 10.78 cr liters; H1 total 19.07 cr liters |
| Ethanol orders pending from last supply year | 8.5 cr liters to be supplied in Oct and Nov 2026 |
| Expected ethanol allocation for new supply year | 40–42 cr liters, management expectation |
| Average capacity utilization | 62% in Q2, 64–65% in H1; target 75–80% going forward |
| CBG installed capacity by end of Q3 FY27 | 72 metric tons per day across 4 plants |
| CBG segmental revenue expected in H2 FY27 | ₹20 cr from 2–3 plants |
| Maize raw material price increase in Q2 | 25–30% QoQ |
| Expected drop in maize availability next year | ~35% |
| Promoter holding | ~71%, with margin of 3.5–4% to reach 75% legal limit |
| Badami plant slump sale expected recovery | ₹171 cr; ₹125 cr term loan outstanding, ~₹46 cr surplus for working capital |