Key Takeaways
- Margin collapse, but temporary: EBITDA margin fell from 63.6% to 14.7% YoY as high-cost steel inventory was consumed, product mix shifted to low-margin items, and PSU orders were deferred. Management expects recovery only from Q3 onward.
- PSU deferral is the core demand story: ONGC and Oil India are consuming existing inventory built up during Covid, pausing procurement of casing pipes and connectors for Q1 and Q2. Drilling activity itself has not dropped, and demand is expected to normalize in H2.
- Export push sacrificed near-term margins: To establish in new export markets, the company sold at compromised margins and paid sales commissions, while fulfilling those orders from high-cost inventory procured at peak steel prices.
- Revenue target pushed out: The INR 500–600 Cr long-term target may be delayed by one to two years due to approval delays for new products, with FY23 now guided to INR 200–205 Cr.
- What to watch next quarter: Whether PSU procurement actually resumes in Q3 as guided, whether the high-cost inventory overhang clears by then, and whether softening steel prices flow through to margins on fixed-price PSU orders.
Margin Walk: What Hit Q1
- High-cost inventory consumed: Raw material bought in Jan–Mar at elevated steel prices was consumed this quarter, hitting profit by ~15%. Steel prices had risen ~30%, and the subsequent correction forced an inventory markdown.
- Product mix flipped to low-margin: Q1 FY23 sales were ~75% casing pipe, 10% gas lift equipment, 15% stabilizers, versus Q1 FY22 which included high-margin winches and connectors.
- Fixed overheads rose: An increase of ~₹2 Cr in fixed overheads further reduced EBITDA margin by ~6%.
- Export margin sacrifice: To establish in new export markets, margins were compromised versus domestic sales, and commissions were paid to overseas sales representatives.
- Finance costs spiked temporarily: The company drew on its cash credit limit from banks due to higher inventory levels, increasing finance costs for the quarter.
Pramod Kumar Gupta: "Yes, the impact of a profit was 15%."
Demand: The PSU Deferral Cycle
- PSU procurement paused: ONGC and Oil India could not drill planned wells during Covid, leading to surplus inventory of casing pipes and connectors. They are utilizing that stock in Q1 and Q2, deferring new procurement.
- Drilling activity intact: Management clarified that activity levels have not dropped and indications suggest they will increase. The current lull is purely inventory destocking by PSUs, not a demand destruction event.
- Normalization expected Q3 onward: Once PSUs exhaust existing stock, procurement of casing pipe with connectors and other products is expected to resume at levels seen in earlier years.
- Three to four projects postponed: Orders were expected but got pushed due to global inflation; these are postponements, not cancellations, and are expected in coming quarters.
- Oil price backdrop supportive: At $70–80/barrel, activity should remain good for at least two to three years. Management sees anything above $50/barrel as a healthy market, given most extraction costs are $15–50/barrel globally.
Kanal Gupta: "First this quarter and next quarter, they have stock for that already available and they are utilizing their stock now post that they will not have stock for the casing pipe with connectors and the products that we sell. So now they will be requiring to procure that, which would effect that in the EBITDA margins and the margins we will see improving in after the next quarter."
Export & International Expansion
- New market registrations: The company has registered in more countries and is receiving repeated orders from Vietnam and Egypt. Libya operations are reopening after Covid closures, and discussions are underway to enter with a sales representative.
- Middle East progress: UAE and Kuwait product approvals are in process; a few smaller orders have already been received.
- New customer wins: Orders received from Shelf Drilling and Gulfwell.
- Export delivery model drives inventory buildup: Private and export customers require delivery in 4–6 weeks, while manufacturing takes 4–5 months. This forces the company to hold semi-finished inventory, which tied up working capital and exposed it to steel price risk when procured at peak prices.
- Margin recovery expected with establishment: Export margins were compromised as a new entrant; management expects improvement once the company gets established in those markets.
Kanal Gupta: "To establish ourselves in the export market, we had to somewhere compromise with the profit margins in comparison to the profit margins in domestic market as we are a new company in them. This will get better once we get established."
Inventory & Raw Material Strategy
- Steel price exposure: Inventory was procured at high steel prices last year when supplier delivery periods had lengthened to 7–10 months. New contracts with private and global companies are now executed at lower steel prices.
- Back-to-back pricing only for PSUs: For Indian PSU orders, there is an understanding with steel suppliers for back-to-back firm prices. For private and export orders, no such arrangement exists, forcing the company to supply from inventory procured earlier at peak prices.
- Hedging under exploration: The company is in talks with professionals to evaluate hedging steel products, tentatively targeting 50% of orders to be executed, with annual steel tonnage requirement of ~10,000 tons.
- Softening commodity prices as tailwind: Orders quoted at higher steel prices may be fulfilled with cheaper purchases while selling prices to oil PSUs remain fixed, potentially benefiting margins during the year.
Product Development & Capacity
- New products under development: Side pocket mandrel, swift connectors, and lynx connectors are in the pipeline.
- Two products awaiting clearances: Clearances were expected and factored into earlier top-line guidance, but are now likely to contribute only next year, and the current revised top-line guidance is around INR 200-205 Crores.
- Gujarat facility under construction: Local approvals for a new project near Mundra port are completed; the project is in the construction phase.
- Casing pipe is full manufacturing, not job work: Management clarified that casing pipe production involves complete fabrication and manufacturing, not simple job work.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Margin recovery | High-cost inventory impact clears; PSU procurement resumes | Q3 and Q4 FY23 |
| FY23 revenue | INR 200–205 Cr (20–25% CAGR increase) | FY23 |
| Long-term revenue target | INR 500–600 Cr, delayed by 1–2 years due to product approval delays | FY25–26 (approx. 3–4 years out) |
| Long-term PAT margin | 20–25% at INR 500–600 Cr revenue run rate | At target revenue |
| Revenue mix at target | ~20% export, 80% domestic (PSUs and private) | At target revenue |
| Hedging implementation | Hedge ~50% of orders; annual requirement ~10,000 tons | Tentative, no date |
| New product contribution | Two developed products awaiting clearances to add to top-line | Next year |
| Postponed project recovery | Three to four projects postponed due to global inflation | Coming quarters |
Key Metrics
| Metric | Q1 FY23 |
|---|---|
| Revenue | ₹36.99 Cr, 16% higher than Q1 FY22 |
| EBITDA | ₹5.44 Cr, vs ₹20.20 Cr in Q1 FY22 |
| EBITDA margin | 14.70%, vs 63.60% in Q1 FY22 |
| Profit before tax | ₹4.42 Cr, vs ₹19.33 Cr in Q1 FY22 |
| Profit after tax | ₹3.12 Cr, vs ₹14.12 Cr in Q1 FY22 |
| PAT margin | 8.43%, vs 44.46% in Q1 FY22 |
| EPS | ₹1.54, vs ₹6.95 in Q1 FY22 |
| Revenue growth guidance (FY23) | 20% to 25% CAGR, revised from earlier ₹250 Cr target to around ₹200–205 Cr |
| Long-term revenue target | ₹500–600 Cr, expected around FY25–26 |
| Long-term PAT margin target | 20% to 25% |
| Orders in hand | ₹70 Cr, export ~10–12% |
| Bids submitted | ~₹200 Cr, export ~20% |
| Order book executable period | By December (6 months) |
| Revenue mix: casing pipe | ~75% of Q1 FY23 revenue |
| Revenue mix: gas lift valves and mandrels | ~10% of Q1 FY23 revenue |
| Revenue mix: stabilizers | 15% of Q1 FY23 revenue |
| Export and private revenue share (FY23 target) | ~10% to 15% of total revenue, up from 5–6% in FY22 |
| Raw material price increase impact on profit | 15% reduction, from ~30% rise in raw material prices |
| Fixed overheads increase impact on margin | ~6% reduction, overheads up by ~₹2 Cr vs Q1 FY22 |
| Inventory | ₹121 Cr as on 30th June |
| Cash balance (FDRs) | ~₹4 Cr |
| Annual steel tonnage requirement | ~10,000 tons |
| Market share in oil PSU upstream drilling tools | 50% to 60% |
| Overall market size: oil PSUs | ~₹250 Cr |
| Overall market size: private | ~₹150 Cr |
| Cost advantage vs US/UK competitors | 15% to 20% lower |
| Pipes and connectors share of well drilling cost | ~4% to 5% |