Key Takeaways
- Guidance upgraded to 70%: Full-year revenue guidance was revised up from 50% to 70%, driven by robust demand and Ratlam capacities now ready; management says it can "trail this guidance in the coming quarters."
- Margin story intact: EBITDA margin improved to 18.9% from 17.7% YoY on better absorption and process efficiency, with guidance held at "sustainable to improve."
- Fire hit taken upfront: The Bawal lead-acid plant fire drove a ₹143.6 crore exceptional loss, but assets are insured and management expects full recovery once the claim settles by end of year.
- Ratlam is now the engine: The 2 GW solar panel and 2 GW power electronics facilities are commissioned, lifting total panel capacity to 3.5 GW and power electronics to 4 GW, with lithium-ion battery capacity due Q2.
- What to watch next quarter: Whether the 70% guidance holds as Ratlam utilization ramps from 40–50%, the lead-acid rental plant deal matures, and the insurance claim progresses toward settlement.
Guidance Revision & Demand Environment
- The upgrade: Management revised full-year guidance to 70% from 50% given last quarter, citing robust demand and capacities ready at Ratlam; the company explicitly said it can trail this guidance in coming quarters as the year progresses.
- What is driving demand: Q1 growth was a mix of seasonality and company initiatives; channel partners grew from 8,900 to 10,100+, two new states moved to "covered" category, and industry demand is growing at ~40%.
- PM Surya Ghar run rate: Adoption has scaled to ~1 GW per month, and management believes this will further increase; the company's own DCR panel capacity now lets it participate properly in on-grid, which was previously constrained.
- PM Surya Ghar 2.0: Framework is still under discussion and not formally notified; proposed reports include support for battery storage, incentives linked to actual power generation, and wider access through community solar. If implemented, it could further expand the addressable market.
- Application pendency: Delays in PM Surya Ghar applications are attributed primarily to DCR panel component shortage; supply is not sufficient, causing delays. Government and DISCOMs are pushing approvals, not delaying.
Prashant Gupta: "So, we would like to revise our guidance for the full year to 70% considering the robust demand which is there and the capacities that we are ready with in Ratlam. And we would like to also highlight one thing that we can trail this guidance in the coming quarters as the year progress."
Ratlam Capacity Ramp & Manufacturing Integration
- Panel capacity: The 2 GW solar panel facility at Ratlam was commissioned during the quarter, increasing total solar panel manufacturing capacity to 3.5 GW; the facility is being ramped up in phases as volumes increase.
- Power electronics capacity: A 2 GW power electronics facility at Ratlam was commissioned in August 2026, manufacturing solar inverters, UPS systems, and related products; total power electronics capacity increased to 4 GW.
- Lithium-ion battery: 2 GW lithium-ion battery capacity is being installed at Ratlam and is on track for commissioning by Q2 FY27; the company is already in residential BESS.
- Ratlam contribution so far: Q1 revenue contribution from Ratlam was relatively low because the plant was capitalized only on 14th May, available for one and a half months; initial utilization is close to 40–50%, starting with one shift.
- Integration thesis: Once completed, the Ratlam complex will bring solar panel, power electronics, and batteries under one manufacturing location, strengthening integration across the product portfolio.
- Solar cell plant: A 1.2 GW solar cell plant is coming up as part of capex additions; management added it more from a margin point of view rather than revenue side.
- TOPCon timeline: Building is completed and orders for machines have been given; target is Q1 of the coming year, with management noting "after 9 months we can say. Now 7.5 months remaining basically."
Backward Integration: Zayo Energy & Zayo Cables
- Stake increase: Fujiyama increased its stake in Zayo Energy Private Limited and Zayo Cable Private Limited from 19% to 50% in each company; Zayo Energy manufactures solar module components like aluminum frame, PV ribbon wire, bus bar, and solder wire; Zayo Cables manufactures PV junction box, solar cable, and EVA sheet.
- Rationale: The primary objective is backward integration to ensure continuous raw material supply and remove bottlenecks; margin is not the primary objective.
- Zayo Energy timeline: Land has been acquired; building construction to start in next 2–3 months; machines to be ordered meanwhile; production to start within one year.
- Zayo Energy top-line expectation: Next financial year top-line is expected at Rs. 400 crores, Rs. 500 crores; margin guidance is only possible next year once operational.
- Zayo sales model: Zayo will supply as OEM to Fujiyama and also to other solar panel companies.
- Capex: Total Zayo Energy capex is ~₹200 crores; Fujiyama's share is 50%, with Fujiyama's equity portion assumed at ~₹50 crores; this is not included in the FY27 capex figure.
Prashant Gupta: "Apart from the margin, the primary objective to invest in these companies is to ensure our backward integration objective. So, that the supply of the raw material is continuous and the bottleneck can be removed."
Fire Incident & Insurance Recovery
- The loss: The Bawal facility fire resulted in damage with a net carrying value of ₹143.6 crore; the company recognized a provisional exceptional loss of ₹143.6 crore in Q1.
- Insurance position: Affected assets are adequately insured and claims have been lodged; the assessment process is at an advanced stage but not fully completed; management expects to recover the entire net carrying value through the claims process.
- Settlement timing: Survey has already been done; the company believes the claim should be settled by the end of this year.
- Gross margin impact: The tubular battery factory was not operating due to the fire, forcing procurement from outside vendors; this reduced gross margin because in-house material margin savings were lost; impact at company level is below 0.5% since tubular battery is ~10% of revenue.
- Lead-acid business trend: The lead-acid battery business is described as "a bit downward," which is why the company will rent rather than acquire a replacement plant.
- Rental arrangement: Talks are ongoing for renting another running lead-acid battery plant; expected to mature within one month; the company will operate the whole factory on rent itself.
Prashant Gupta: "And on the loss side, whatever the maximum impact could have been taken, we have taken in this quarter only. So, once the claim settle, you will see recovery of the complete loss that we have we have suffered during this incident."
Margins & Pricing Strategy
- Margin walk: EBITDA margin improved to 18.9% from 17.7% YoY because higher volumes enabled better utilization of manufacturing and operating infrastructure and supported better absorption of cost; process improvements across operations also contributed to efficiency.
- Pricing strategy: The company passed on a portion of efficiency gains to customers through competitive pricing during the quarter, but retained sufficient efficiencies within the business despite sharing benefits.
- DCR margin support: The 18–19% EBITDA margin is being sustained because the company now has in-house DCR solar cell capacity, offsetting margin depletion in non-DCR due to falling module prices.
- Cell plant utilization: The DCR cell plant is operating at 80% plus utilization currently; management is hopeful that as utilization goes up further, margin can move further, but will share margin benefit with existing and new customers to achieve scale.
- Guidance: Management reiterated previous guidance of margins "from sustainable to improve" for the year; reported 18.9% margin; hopeful to sustain and rather improve in coming quarters.
Prashant Gupta: "So, the margin profile that we are carrying of 18% to 19%, we are hopeful that we will continue to sustain this and rather improve it in the coming quarters. So, the guidance remains the same as per the previous quarter of from sustainable to improve."
Distribution Network & Channel Expansion
- Channel partner growth: Channel partner network crossed 10,000 from close to 8,900 last quarter; distributor additions are happening both in existing states and new areas.
- New states covered: Odisha and Uttarakhand moved from "growing" to "covered" category this quarter, where coverage means one distributor in each district and approximately one service engineer.
- Network target: More than 15,000 network partners (including Shoppe, dealer, and distributor) by end of FY28; the company hopes to keep the same growth rate in distribution channel as achieved earlier.
- On-grid vs off-grid focus: Current main focus is on-grid / PM Surya Ghar because "more outcome comes from less effort"; off-grid continues to grow but at a slower pace, sustained by rural customers whose needs are met at Rs. 50,000 price point including battery.
- Market share: Management believes the company has around 10% of on-grid market share, though it notes officially it is very difficult to confirm market share.
Pawan Kumar Garg: "So, the main thing is that whatever we focus on, that thing will grow. So now look, focus is on PM Surya Ghar at this time, so if more outcome comes from less effort, then focus should be put there."
Product & Regulatory Updates
- Micro-inverter launch: The company launched a 1 KVA on-grid system called a micro-inverter; claims to be first to develop indigenous design in micro-inverters in India; currently getting approvals.
- BIS non-compliance: 15 SKUs were flagged by the BIS team out of ~500 total SKUs; the company believed these did not fall under BIS category per their definition, but subsequently obtained BIS certification for those SKUs anyway; flagged stock was worth Rs. 2 crores out of Rs. 500 crores total stock, less than 1% of product mix.
- Government tender participation: The company is participating in government tenders and trying to supply as OEM to tender participants for lower-income segment systems.
- Subsidy sustainability: Management does not expect subsidy to go away very soon; cites 35 crore houses vs 1 crore target with only 50% covered, and PM Surya Ghar 2.0 coming.
- Post-subsidy positioning: If subsidy goes away, management expects competitors who entered for subsidy to "fade away" and the company to sustain and gain market share; distributed solar economics remain compelling with money recovered in 3–4 years.
Yogesh Dua: "So when the subsidy came, it gave us a very good push that what we were doing came up with a good result. And if the subsidy goes away, which we do not expect it will happen very soon because there are 35 crores houses in India and the government target of PM Surya Ghar Yojana Awas for 1 crore only which is 50% covered yet."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year revenue growth | Revised to 70% from 50% | FY27 |
| EBITDA margin | "Sustainable to improve" from 18.9% base | FY27 |
| Lithium-ion battery capacity | 2 GW at Ratlam | Commissioning by Q2 FY27 |
| Insurance claim recovery | Full net carrying value of ₹143.6 crore | Settlement by end of CY2026 |
| Lead-acid rental plant | Operate a rented running plant | Deal expected to mature within one month |
| Zayo Energy production | Start production; next FY top-line Rs. 400–500 crores | Within one year |
| TOPCon solar cell line | Commissioning | Q1 of coming year (target) |
| Distribution network | 15,000+ network partners | By end of FY28 |
| Cumulative gross block incl. CWIP | ~₹1,300 crores | By end of FY27 |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue from operations | ₹1,345.7 crore, +125.3% YoY from ₹597.3 crore in Q1 FY26 |
| EBITDA | ₹254.8 crore, +140.6% YoY |
| EBITDA margin | 18.9%, up from 17.7% in Q1 FY26 |
| Profit before tax | ₹77.7 crore, after exceptional loss of ₹143.6 crore from Bawal fire |
| Reported PAT | ₹57.8 crore, margin of 4.3% |
| Normalized PAT excluding fire provision | ₹165.2 crore, +144.5% YoY; margin of 12.3% vs 11.3% in Q1 FY26 |
| Bawal fire exceptional loss | ₹143.6 crore net carrying value of damaged assets; fully insured, recovery expected |
| Full-year revenue growth guidance | 70%, revised upward from 50% given last quarter |
| Solar panel manufacturing capacity | 3.5 GW total, after commissioning 2 GW at Ratlam during the quarter |
| Power electronics manufacturing capacity | 4 GW total, after commissioning 2 GW at Ratlam in August 2026 |
| Lithium-ion battery capacity at Ratlam | 2 GW, on track for commissioning by Q2 FY27 |
| Solar cell plant utilization | 80%+ currently |
| Channel partner network | 10,100+, up from 8,900 last quarter; two new states covered, Odisha and Uttarakhand |
| Distributors | 1,150+, up from 950+ last quarter |
| On-grid inverter market share | ~10%, per management estimate |
| Industry growth rate | ~40% |
| Rooftop solar installed in India to date | 30+ GW, of which ~15 GW from PM Surya Ghar Muft Bijli Yojana |
| PM Surya Ghar installation run rate | ~1 GW per month under the scheme |
| Rooftop system cost with battery | ₹26–₹30 per watt, including panel, inverter, and battery |
| B2C revenue share | ~90% of revenue from B2C channel network |
| Tubular battery share of revenue | ~10%; fire-related gross margin impact below 0.5% at company level |
| Capex, cumulative gross block including CWIP | ₹1,300 crore expected by end of FY27, up from ~₹800 crore at start of year |
| Zayo Energy and Zayo Cables stake | 50%, increased from 19% in each company |
| Zayo Energy expected top-line next financial year | ₹400–500 crore, production to start within one year |
| Distribution network target by end of FY28 | 15,000+ network partners including Shoppe, dealers, and distributors |
| BIS-flagged stock | ₹2 crore out of total stock of ₹500 crore, less than 1% of product mix |