Key Takeaways
- GST disruption masked underlying strength: Revenue fell 4.9% QoQ to ₹567.9 crore as a GST rate cut from 12% to 5% triggered a near-month-long customer pause, but YoY growth stayed at 72.6% and H1 PAT margin expanded to 11.2%.
- Backward integration is now delivering margin: Material margin improved 0.7% YoY as expanded in-house solar panel (1,039 MW) and battery (1,863 MWh) capacity flowed into the cost structure, with a 1 GW solar cell line set to deepen that advantage within one month.
- The B2C moat is built on market creation, not share theft: Over 90% of H1 revenue came from B2C, driven by converting non-solar inverter users in Tier 2/3 towns and rural villages into solar buyers, a model management says competitors cannot easily replicate.
- Capacity is doubling, but the revenue ramp will lag: IPO-funded Ratlam facility adds 2,000 MW each of panels, inverters and batteries by March 2026, yet management cautioned that sales will take time to reach the "right level" after capacity comes online, pointing to FY27.
- What to watch next quarter: Whether the Dadri solar cell line commissions on time and begins contributing, how quickly the 108-day inventory overhang normalizes toward the 90–98 day historical range, and whether the GST-related demand pause fully unwinds.
The GST Shock: What Happened and What Sticks
- A policy-driven air pocket: The GST rate on solar equipment was cut from 12% to 5% during the quarter, and customers responded by postponing purchases to capture the lower tax rate, effectively freezing activity for nearly a month.
- Lost sales are permanent: Management was explicit that deferred purchases will not fully return, stating some portion of the demand is gone for good rather than merely shifted into future quarters.
- Inventory swelled as a direct consequence: Inventory days spiked to 108, up from the historical 90–98 day band, because the company had already ordered stock in anticipation of normal demand that did not materialize. Normalization is expected in coming quarters.
- PAT dipped despite margin improvement: PAT fell from ₹67.6 crore to ₹62.9 crore QoQ, partly because employee costs rose ₹2.5 crore as headcount was added in preparation for new capacity coming on stream over the next few quarters.
Garg: "The sale that is lost, is lost. During the COVID period whatever sale happened, it takes time to recover. It's not like the sale will come next month..."
Backward Integration: The Margin Engine
- In-house manufacturing is now a material cost lever: Material margin improved 0.7% YoY, driven by higher captive production of solar panels and batteries after capacity expansions (panels: 439 MW to 1,039 MW; batteries: 1,363 MWh to 1,863 MWh). Scale benefits from higher volumes further supported production efficiency.
- The Dadri solar cell line is the next catalyst: A 1 GW solar cell plant in Dadri is under trial runs with all machines powered up, and management expects it to be fully operational within one month. This is the deepest layer of backward integration yet and will reduce dependence on purchased cells.
- DCR cell access unlocks the subsidy market: Domestic Content Requirement cell availability has improved recently, and the company was able to sell DCR cells this month after being locked out of the subsidy-linked market in prior months.
- Margin quantification is deliberately absent: When asked how much margins could improve from backward integration, management declined to provide a number, saying only that margins "will improve."
- The cell revenue timeline is a bonus, not a promise: Management explicitly asked investors not to expect solar cell revenue in Q4 FY26, framing any contribution as a windfall, with full capacity stabilization targeted for March–April 2026 or the start of FY27.
Garg: "In Q4, definitely it will give benefit, but we will request you not to expect in Q4. But whatever will happen will be a bonus."
The B2C Moat: Market Creation, Not Share Theft
- The company built its own demand: Management stated it "started the whole market from zero" by educating customers on a 50-50 concept: spend half the budget on battery and half on solar panel, keep the same backup, save on electricity bills, and halve future battery replacement cost.
- The target is non-solar inverter users, not competitors' customers: The strategy is to convert users of conventional inverters (Okaya, Microtek, Luminous, Exide, Genus) to solar solutions within the same budget, rather than taking share from other solar players.
- Tier 2, Tier 3 and rural villages are the core: Over 90% of H1 revenue came from B2C, built on word-of-mouth reputation and local trust. Tier 1 presence is an aspiration for "coming time," not a current driver.
- The Shoppe franchise model is the last-mile engine: Franchisees handle system sizing, installation and financing, while dealer-distributors perform installations and hold quick-running inventory. The company does not earn from annual maintenance, leaving that scope to its channel partners.
- R&D feedback is a structural differentiator: Field service engineers feed real-world performance data directly into R&D teams for rapid corrective and preventive improvements, a loop management described as difficult for competitors to duplicate.
Garg: "We are converting the normal inverter market into solar. We are developing the market. We are not taking anyone's share."
Capacity Expansion: Doubling Down for a 40%+ CAGR Market
- IPO proceeds are funding a capacity doubling: The Ratlam facility will add 2,000 MW each of solar panels, inverters and batteries by March 2026, roughly doubling total capacity across all three segments by FY26-end.
- The expansion is defensive as much as offensive: Management framed the capacity build as necessary to maintain market share in a rooftop solar market growing at a 40–43% CAGR, per industry reports, rather than an aggressive share-grab.
- Stabilization timelines vary by technology: Batteries and inverters stabilize quickly given 30 years of experience, while the solar cell line at Dadri carries more uncertainty, with full capacity targeted for March–April 2026 and a risk of slipping to early FY27.
- Sales will lag capacity: Management cautioned that after capacity doubles, "sale will take time to increase," with FY27 expected to bring volumes to the "right level."
- Geographic expansion is widening the funnel: Distributor, dealer and Shoppe counts improved during the quarter, with Kerala and Tamil Nadu performing better than before and improvements noted in Odisha and West Bengal. Special focus is now on the North-East, Andhra Pradesh, Telangana, Karnataka and Jharkhand, with a target of at least one distributor and one service engineer in every district across these states.
Financial Health: Leverage, Returns and the Inventory Blip
- Post-IPO balance sheet is cleaner: The company used ₹275 crore of IPO proceeds to repay debt, bringing pro forma net debt to ₹390.3 crore and net debt-to-equity to 0.35. The rise in borrowing pre-IPO reflected a funding structure that has since been addressed.
- ROCE/ROE declined but the optics are partly mechanical: The drop from approximately 40% to approximately 25% reflects higher asset turnover in the past, the half-year nature of the current figure, and the inventory build.
- Inventory normalization is expected but not pinned to a date: Management pointed to the historical 90–98 day range as the benchmark but did not commit to a specific stabilization level or quarter. A temporary increase in inventory cycle is expected during the backward integration transition phase, after which the overall cycle should come down.
- Employee costs are rising ahead of revenue: Headcount increased in preparation for new capacities, adding ₹2.5 crore to employee benefit expenses QoQ, though labour optimization kept the cost ratio 0.6% lower as a percentage of revenue.
Competitive Positioning and Industry Context
- The company defines itself as a power electronics firm, not a panel maker: Management positioned Fujiyama as "fundamentally a power electronics and energy solutions company," distinguishing it from pure-play solar panel manufacturers or energy developers.
- Oversupply fears are deflected, not addressed: When asked about industry news of solar module oversupply, management pointed to its captive consumption model (over 90% B2C, all capacity for self-use, not B2B sales) rather than engaging with the industry-wide supply-demand question.
- PM Surya Ghar scheme is an awareness catalyst, not a direct revenue driver: The government scheme created awareness that expanded the off-grid market, and the company converted resulting inquiries into growth, but management did not quantify the scheme's direct contribution.
- Competition is welcomed as validation: When asked about Tata or other large entrants, management responded that "there are a lot of opportunities" and that sustainable service to customers is the main differentiator, suggesting confidence in the B2C moat rather than alarm at new entrants.
Garg: "If we can provide a sustainable service to our customers, they will be able to work, that is the main thing. If Tata or any other company comes, they will be able to work there are a lot of opportunities."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Dadri solar cell line commissioning | 1 GW plant fully operational | Within one month from call date |
| Dadri cell capacity stabilization | Reach full rated capacity | March–April 2026; if delayed, start of FY27 |
| Ratlam facility completion | Add 2,000 MW each of panels, inverters, batteries | By March 2026 |
| Total capacity doubling | Approx. 2x across panel, battery, inverter segments | By end of FY26 |
| Sales ramp to match doubled capacity | Volumes brought to "right level" | FY27 |
| Inventory normalization | Return toward historical 90–98 day range | Coming quarters (no specific quarter committed) |
| Geographic expansion | At least one distributor and one service engineer in every district of North-East, AP, Telangana, Karnataka, Odisha, West Bengal, Jharkhand | No date committed |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue from operations | ₹567.9 cr, +72.6% YoY; -4.9% QoQ |
| EBITDA | ₹103 cr, margin 18.1% vs 15.2% in Q2 FY25 |
| PAT | ₹62.9 cr, margin 11.1% vs 9.7% in Q2 FY25 |
| Material margin improvement | 0.7% over Q2 FY25, driven by in-house manufacturing |
| H1 FY26 revenue from operations | ₹1,165.3 cr, +61.5% YoY |
| H1 FY26 EBITDA | ₹208.9 cr, margin 17.9% |
| H1 FY26 PAT | ₹130.5 cr, margin 11.2% vs 10.4% in H1 FY25 |
| B2C revenue share | Over 90% of H1 FY26 revenue |
| Revenue mix: panels | ₹529 cr in H1 FY26, ~45% of total |
| Revenue mix: batteries | ₹237.4 cr in H1 FY26 |
| Revenue mix: electronics | ~₹330 cr in H1 FY26, ~28% of total |
| Total assets | ₹1,590 cr as of Sep 30, 2025 vs ₹1,014 cr in Mar 2025 |
| Total equity | ₹527.6 cr as of Sep 2025 vs ₹396.8 cr in Mar 2025 |
| Total debt | ₹674 cr as of Sep 2025 vs ₹346.2 cr in Mar 2025 |
| Pro forma net debt | ₹390.3 cr, pro forma net debt-to-equity 0.35 |
| Post-IPO debt repayment | ₹275 cr utilized |
| Solar panel manufacturing capacity | 1,039 MW, expanded from 439 MW |
| Battery manufacturing capacity | 1,863 MWh, expanded from 1,363 MWh |
| Solar cell line (Dadri) | 1,000 MW, expected commissioning within one month |
| Ratlam facility capex | ₹272 cr for 2,000 MW each of panels, inverters, batteries by Mar 2026 |
| Dadri cell capex budget | ~₹350–400 cr |
| Channel partners added: distributors | 70 added in Q2 |
| Channel partners added: dealers | 350 added in Q2 |
| Channel partners added: Shoppes | 20 added in Q2 |
| Total channel partners | 7,500+ |
| Service engineers | 600+ in field network |
| Inventory days | 108 days, vs historical 90–98 days |
| ROCE/ROE | ~25% (H1 FY26 annualized), vs ~40% historically |
| GST impact | Rate cut from 12% to 5% caused temporary purchase deferral, nearly one month of muted activity |