Key Takeaways
- Record revenue, margin optics mask strength: Revenue hit a record ₹361.1 crores (+24% YoY), but EBITDA margin fell to 14.3% as higher selling prices, freight and fuel costs compressed the percentage. Excluding those, margin would have been above 16%.
- Exports surged, freight cost was absorbed deliberately: Export revenue jumped over 50% QoQ to an all-time high of ₹147.2 crores (41% of revenue), led by the US. Management chose to take a margin hit on freight rather than delay orders for long-term clients.
- Spooling is now live and the margin story is material: The first data center spooling order converted from LOI to a firm ~₹29 crores, with the full ₹185 crores LOI expected to be completed by Q2 FY28. Spooling EBITDA margins are guided above 30% for data centers, reshaping the profit mix.
- Balance sheet reset unlocks PAT growth: The ₹372 crores preferential allotment will retire ~₹344 crores of debt, saving ₹12–13 crores in H2 FY27 interest and ₹28–30 crores annually, directly lifting PAT.
- What to watch next quarter: The pace of LOI conversion into firm spooling orders, whether freight costs sustain their recent decline, and the ramp-up of fittings revenue toward the ₹40–50 crores H2 target.
Spooling: The New Margin Engine
- First order live, large pipeline: The ₹185 crores data center LOI is being executed in phases as the customer finalizes designs, with the full order expected by Q2 FY28. A further ~₹70 crores of spooling revenue is targeted in H2 FY27, at EBITDA margins exceeding 30%.
- Sector-by-sector margin stack: Data center spooling carries above 30% EBITDA margin, power ~30%, oil & gas 20–25%, and nuclear more than 35–40%. The company is currently in Phase 1 (data centers) and plans to enter power spooling in Q4 FY27.
- Capacity build-out is underway: New spooling capacity is expected operational by January or February 2027, taking total annual capacity to ~₹250–300 crores. A decision on further expansion will come in Q4 FY27, depending on demand from the existing client and other data center inquiries.
- Client dependency is acknowledged but hedged: After the current LOI is executed, management will discuss further requirements with the existing client, but notes "a lot of inquiry pending from other data center also" and is open to further capacity expansion if needed.
Arun Kothari: "Margin for this depends on the sector. For the data centre sector, we expect an EBITDA margin above 30%. For power sector also almost at the same level, 30%. Oil and gas sector will be between 20%-25%. Nuclear sector will be more than 35%-40%."
Export Surge & Freight Margin Hit
- US drove the quarter, mix shifted sharply: Export revenue hit an all-time high of ₹147.2 crores, with the US contribution moving from ~20% to almost 50% of exports. Sales are actively shifted between the US, Europe and newer geographies like the Middle East to hedge risks.
- Freight cost was a deliberate margin sacrifice: Freight costs rose substantially in Q2, but orders were received in early Q1 at lower freight rates. Management chose to take the margin hit rather than delay export orders, stating they "could have easily defended" margins but prioritized long-term client relationships.
- Pass-through is now the norm for new orders: Only some existing orders had freight pass-through conditions; for all new orders being bid, costs are generally being shifted to the customer. Freight rates started depleting in the last two days before the call, and if the trend reaches early Q1 levels, pipe margins should return to ~16%.
- Europe quota reduction was absorbed: European quotas decreased by around 15–20% year-about, but export levels to Europe remain almost the same, with "not much hit" to the business.
Arun Kothari: "We decided not to delay our export order since we have been dealing with all the clients for a very long time. That is why we took the margin hit, which we could have easily defended."
Core Pipe Business: Volume & Margin Dynamics
- Volume growth was broad-based: Of the 24% YoY revenue growth, ~12% came from price increases, ~8% from quantity, and the balance from fittings. Both seamless and welded pipes grew ~20% each. Full-year volume growth is targeted at ~15%, up from ~8% in H1.
- Margin percentage is optically compressed: Selling prices increased over 10% YoY, which mechanically compresses the EBITDA margin percentage even when absolute EBITDA is healthy. Excluding the price impact, margin would have been ~15.5%; excluding higher export freight and fuel costs as well, it would have been above 16%.
- EBITDA per kg dipped on freight: EBITDA per kg (excluding fittings) declined from ₹64 in Q2 FY26 to ₹62 in Q2 FY27, primarily due to higher freight costs. Management expects a ₹2–3 improvement if freight costs continue depleting.
- Capacity utilization is climbing: Welded capacity utilization is expected to increase from 60%+ to 65–70%, while seamless is set to go above 90%, supported by the second seamless pipe facility that became operational in May 2026.
- Employee costs rose on capacity build: Employee expense rose ~34% YoY because of capacity additions over the last year, including fitting capacity, stainless capacity and other plants added over the last year. Some further additions are possible as plants ramp up, but not substantially high.
Kunal Bubna: "See, again, on a percentage basis, it is very tough to say because if the price remain at the same level, optically it is again at that current percent only. It is only the higher selling price which will technically decrease the marging %."
Fittings: Early-Stage Ramp with 20% Margin Potential
- Revenue is still minimal, approvals are the gate: Fittings contributed only ~₹9 crores in H1 FY27 because the business is still ramping up and requires individual customer approvals. H2 FY27 is expected to deliver ₹40–50 crores in fittings revenue at EBITDA margins exceeding 17–18%.
- Margin upside is structural: Fittings EBITDA margin can go up to 20% as customer approvals are obtained and supplies ramp up. The current lower margin is a function of the early stage, not the product's inherent economics.
- Product mix shift is deliberate: In coming quarters, the focus will be on increasing the revenue share of more value-added products such as spooling and fittings, plus developing additional stainless steel component products manufactured from existing pipe and tube products for better realization.
Balance Sheet Reset & PAT Pathway
- Debt retirement is nearly complete: Of the ₹372 crores raised via preferential allotment, ~₹344 crores is being used to repay borrowings. Repayment has started and will be completed soon.
- Interest savings flow directly to PAT: H2 FY27 will see an interest saving of ₹12–13 crores, with an annual saving of ₹28–30 crores. Combined with high-margin spooling (30% EBITDA) and fittings (20% EBITDA), management expects PAT-level growth in coming quarters.
- Capex remains measured: H2 FY27 capex is expected at ₹30–35 crores, taking full-year FY27 capex to ₹130–140 crores. A solar power plant capex has also commenced.
Demand Environment & Order Book
- Domestic demand is broad and deepening: Demand is coming from established sectors (power, engineering, oil & gas) plus encouraging inquiries from newer areas including CNG station infrastructure, semiconductor and solar power.
- Order book is healthy but pipeline details are withheld: The order book stands at over ₹670 crores, including the ~₹30 crores data center order and excluding the remaining ₹156 crores LOI. Management declined to quantify the pipeline beyond this, citing the difficulty of disclosing project orders still under discussion.
- Export order book trend is stable: Around 40% of the total pipe order book comes from export sales, and management believes this 40% trend should continue, with sales shifted between geographies to manage concentration risk.
- Nuclear and specialized approvals are in progress: The company is working on approvals for nuclear and other specialized sectors, currently supplying small quantities to nuclear. A firm update will come when formalities are completed.
Arun Kothari: "After that only, we are expecting we will start discussing with our existing client. He has the more requirement. After that also, if he is not having requirement, then we have a lot of inquiry pending from other data center also. So our discussion is ongoing with them. If need arise, so we can do further capacity expand also."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year pipe volume growth | ~15% volume growth from pipe segment | FY27 |
| Spooling LOI execution | Entire ₹185 crores LOI completed | By Q2 FY28 |
| H2 FY27 spooling revenue | ~₹70 crores from data center spooling, EBITDA margin above 30% | H2 FY27 |
| H2 FY27 fittings revenue | ~₹40–50 crores, EBITDA margin exceeding 17–18% | H2 FY27 |
| Interest cost saving | ₹12–13 crores saved in H2; ₹28–30 crores annualized | H2 FY27 / ongoing |
| New spooling capacity operational | Additional capacity taking total to ~₹250–300 cr p.a. | January or February 2027 |
| Power sector spooling entry | First power sector spooling work | Q4 FY27 |
| Further spooling capacity expansion decision | Decision on whether to expand beyond current build-out | Q4 FY27 (early to mid-January) |
| Full-year FY27 capex | ₹130–140 crores | FY27 |
| Pipe EBITDA per kg improvement | ₹2–3 improvement if freight costs continue depleting | Conditional on freight trend |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue | ₹361.1 cr, +23.9% YoY, highest ever quarterly revenue |
| Revenue mix | Seamless 54.7%, Welded 37.6%, Fittings 2.5%, Other 5.2% |
| EBITDA | ₹51.7 cr, +9.1% YoY from ₹47.4 cr in Q2 FY26 |
| EBITDA margin | 14.3%, vs 16.3% in Q2 FY26; ~15.5% excluding price increase impact, above 16% excluding higher export freight and fuel costs as well |
| EBITDA per kg (excl. fittings) | ₹62, down from ₹64 in Q2 FY26, majorly due to freight |
| PAT | ₹26 cr, vs ₹26.1 cr in Q2 FY26; PAT margin 7.2% |
| Export sales | ₹147.2 cr, all-time high, 41% of revenue, +50% sequentially |
| Volume growth (pipes) | ~8% YoY in H1 FY27; full-year target ~15% |
| Order book | Over ₹670 cr, including ~₹30 cr data center order; excludes ₹156 cr pending LOI; YoY growth more than 30% |
| Order book execution timeline | 4–5 months for the ₹640 cr pipes order; data center execution targeted before December 2027 |
| Capacity utilization | Seamless >80%, Welded >60% in Q2; H2 outlook: Seamless above 90%, Welded moving to 70% |
| Net working capital on sales | ~120 days; debtor days around 75–80 |
| Interest cost | ~₹14 cr in Q2 FY27; H2 FY27 saving of ₹12–13 cr expected from preferential allotment debt repayment of ₹344 cr |
| Capex | ~₹105 cr spent in H1 FY27; full-year FY27 expected at ₹130–140 cr |
| Spooling H2 revenue target | ~₹70 cr, with EBITDA margin exceeding 30% |
| Fittings H2 revenue target | ₹40–50 cr, with EBITDA margin of 18–20% |