Key Takeaways
- A capex story entering its harvest phase: The ALCU plant is nearly built (10,000–11,000 MT of 18,000 MT installed), and management's full attention is now pivoting from construction to sales.
- Margins compressed by start-up costs, not structural weakness: EBITDA per ton fell from ~₹52,000–53,000 in Q1 to ~₹48,000–49,000 in Q2 because ALCU's fixed costs are fully loaded while volumes are still ramping.
- The product pipeline is deep and now shipping: Aluminium wires, PV ribbon, EV-grade conductors, and paper-covered strips are all in regular production, with first exports to Israel and Nepal already completed.
- CTC is the next catalyst, just weeks away: Trial production of Continuously Transposed Conductors is set to begin by mid-December, opening a path into power transformers and, eventually, HVDC applications.
- What to watch next quarter: Whether aluminium volumes actually build from end-Q3 as customer approvals convert to orders, and whether the EBITDA per ton recovery materializes once teething issues are sorted.
The ALCU Ramp: From Build-Out to Sell-Out
- Capacity nearly fully installed: Approximately 10,000–11,000 metric tons of the planned 18,000 MT is operational; the balance is expected by mid-December, a slight delay from the original Diwali timeline.
- Copper lines are running, aluminium is next: Copper production started in February and within eight months is running at a healthy share of capacity with output rising each month; aluminium lines are in customer testing and approvals, with volumes expected to build from the end of Q3 as those approvals turn into regular orders.
- New products are already shipping: EV wires, round ripple conductors, and aluminium paper-covered strips are now being supplied to customers on regular orders from the ALCU facility.
- Exports have begun: First shipments from ALCU have gone to Israel and Nepal, and the company aims for exports to make up a quarter of revenue once the expansion is complete.
- Cross-selling is the near-term lever: New ALCU products are being offered to existing Vidya Wires customers so they can buy a wider range from a single supplier, and customers are already visiting the plant for audits.
- The cost drag is temporary: H1 results carry the full cost of ALCU while volumes are still building, which compressed EBITDA per ton; management expects this to reverse as volumes rise and teething issues are resolved.
Shailesh Rathi: "With most of our installation and construction work in ALCU is finishing by December, our now full attention is in the second half moves towards the sales."
Margins: The Start-Up Cost Overhang
- EBITDA per ton dipped on fixed-cost absorption: EBITDA per ton fell from ~₹52,000–53,000 in Q1 to ~₹48,000–49,000 in Q2 because fixed cost expenses from the new ALCU plant kicked in while volumes have not yet grown proportionately.
- H1 EBITDA per kg held at ₹59: Management highlighted this as a strong productivity metric despite volume growth not yet materializing, and expects maybe around ₹60 to ₹65 going forward.
- Volume growth was subdued for two reasons: Q1 was affected by a heightened war scenario, and Q2 improved but operational and teething issues at ALCU limited the volume ramp-up; management says they are mitigating these issues on a regular basis.
- The recovery path is operational, not structural: As copper volumes rise, aluminium approvals turn into orders, and CTC starts, management expects ALCU to show enough profits over coming quarters, with most of the extra contribution flowing to profit.
Shailesh Rathi: "Even like in spite of all the price rise of the raw material, the copper prices, the Middle East issues, everything, we are still able to maintain the better quantum in comparison to our last year and now the journey from basically operational management, now we are towards the sales management. So, I am sure that from here we will see a better growth coming down."
CTC: The Next Growth Leg
- Trial production imminent: The CTC plant is near complete, with trial production expected to begin by mid-December, and revenue contribution starting from Q4.
- Market entry path is staged: Initial supply will go to mid-size power transformers; HVDC transformer supply will take more time, with management estimating approximately 6 to 9 months to reach that level after starting with normal and mid-size transformers, subject to customer confidence, experience, performance, and approvals.
- CTC completes the product suite: Once operational, CTC adds a high-value conductor product for power transformers, broadening the addressable market beyond the existing wire and strip portfolio.
Demand Environment
- Renewable energy hit a soft patch: Installations saw stagnancy over the last 2–4 months due to slower execution of power projects and transformer deliveries caused by transmission issues, but management says the order scenario on the renewable side remains "very, very bullish."
- Data centers are an emerging demand driver: The company has started getting a few orders for copper busbars and related requirements from data center applicators.
- Broader demand tailwinds are intact: Management cited PM-level attention on renewable energy, Middle East problems shifting focus toward renewable power, EV growth adding electricity and charging station demand, and data center demand emerging for copper busbars as reasons the overall scenario is "very good" for the segment.
- Q3 and Q4 are seasonally stronger: Management noted that Q3 and Q4 normally happen to be better quarters, and good growth is expected in the next two quarters.
Shailesh Rathi: "There was some stagnancy in the renewable energy installations. Maybe the power projects, the execution was because of the transmission and all this was not doing well, so, even the transformer deliveries and everything was in and between getting slower, but overall, the order scenario what we see on the renewable side is very, very bullish..."
PV Ribbon & Exports
- PV ribbon exports have started: Exports to one client in the USA have begun, and the company is trying to get more share of the domestic PV ribbon business.
- Export ambition is material: The stated aim is for exports to make up a quarter of revenue once the expansion is complete, and outside India the company will look to add more customers in more countries for ALCU products.
FY2028: Capacity-Led Growth, No Numbers Yet
- All capacity will be operational: Management stated that whatever capacity is planned will be 100% operational in FY2028, with better volumes expected as focus shifts fully to sales.
- Management is optimistic but not quantifying: When asked for specific FY2028 volume guidance, management declined, stating "we cannot share any kind of number or anything like that," and offered only "better performance in the coming year."
- Volume data disclosure is coming: Following multiple analyst requests, management agreed to include volume data in future investor presentations, though they did not provide the data on this call.
- Tax overhang is largely resolved: An appraisal and assessment have been completed; the original high department amount has been reduced to a very small amount, and management is confident of resolution to near zero.
Shailesh Rathi: " The appraisal was over and assessment is also over, and we have filed for the next stage and this is under process and we are very much sure that there is no problem. So, already the amount, which was like the department was too high originally, but it has come down to a very small amount and this will be, we are very much confident that nothing will be there and it will come down to almost zero."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Aluminium volume build | Aluminium volumes to build as customer approvals convert to regular orders | From end of Q3 |
| CTC trial production | Trial production to begin | By mid-December |
| CTC revenue contribution | CTC to start contributing to revenue | From Q4 FY27 |
| ALCU capacity completion | Balance of 18,000 MT capacity to be installed | By mid-December |
| HVDC transformer supply | Reach HVDC transformer level after starting with mid-size transformers | 6–9 months from CTC start, subject to approvals |
| EBITDA per kg | Expect around ₹60 to ₹65 going forward | Forward-looking, no end date, H1 FY27 was ₹59 |
| Volume data disclosure | Include volume data in investor presentations | Future presentations, no specific date |
| Tax assessment resolution | Confident of resolution to near zero | Under process, no specific date |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹580.94 cr, up 52.5% YoY and 5.68% QoQ |
| H1 FY27 revenue | ₹1,130.65 cr, up 42.63% vs H1 FY26 |
| EBITDA | ₹239.55 million |
| H1 FY27 EBITDA | ₹49.18 cr, up from ₹38.26 cr in H1 FY26 |
| Profit after tax | ₹148.4 million |
| H1 FY27 PAT | ₹31.97 cr, up from ₹22.53 cr in H1 FY26 |
| Consolidated EBITDA per kg | ₹59 in H1 FY27, up ~34% vs ₹44 in H1 FY26 |
| Expected EBITDA per kg | ₹60 to ₹65 going forward, per management |
| ALCU revenue contribution | ~20% of Q2 revenue, ₹110 cr vs ₹60 cr in Q1 |
| ALCU installed capacity | 10,000–11,000 MT, balance of 18,000 MT total planned by mid-December |
| CTC production start | By mid-December, revenue contribution expected from Q4 |
| Volume growth | 4% to 5% on a consolidated percentage basis |
| Exports commenced from ALCU | First shipments to Israel and Nepal |
| Tax notice status | Reduced to a very small amount, management confident of near-zero outcome |