Key Takeaways
- Volume down 9%, but the base effect explains it: Last year's Q1 pulled forward sales held over from Q4 FY23, so the decline is less a demand signal and more a timing artifact.
- Price settlements are the quarter's open question: Q1 price increases demanded from OEs remain largely unresolved; one OE has agreed but not formalized, so the benefit sits outside reported results.
- All costs are now trending down together: The GAIL pipeline switch saves over ₹3 crores per quarter from Q2, electrode prices have fallen sharply, and declining commodity prices are flowing through, though Q2 will carry inventory losses from the falling-cost environment.
- This is a self-declared consolidation year: Management is holding production flat, investing in systems, quality, internal audit and SAP, while building the Aichi partnership and succession groundwork.
- What to watch next quarter: Whether the pending OE price increases materialize, the size of the Q2 inventory loss, and whether the full-year EBITDA/ton guidance holds at the lower end of ₹7,000–₹10,000.
Price Negotiations & OE Dynamics
- Q1 settlements still open: Price increases have been demanded from OEs because raw material costs rose; one OE has given the increase and one small OE has been factored in, but letters have not yet arrived for the rest, so nothing is booked.
- The justification burden is on the supplier: OEs require cost increases to be justified item by item, line by line, which management frames as a trust advantage: OEs trust Vardhman's transparency and data-sharing, which has built brand equity over the years.
- Two OEs have now agreed: Letters are pending, so the benefit is not yet in Q1 numbers; management is hopeful of resolution in the next few weeks because they have a genuine case.
- The squeeze is structural and accepted: Management acknowledges OEs want more profits and will squeeze smaller suppliers, calling it "part of the game."
Sachit Jain: "OEs are very smart purchasers. They don't give a price increase just because you're asking for it. So, you have to justify cost item by item, line by line. Why are you asking for a particular increase?"
Cost Structure & Margin Trajectory
- GAIL pipeline is the big Q2 tailwind: The switch from Think Gas to a GAIL formula-based contract (Henry Hub index, prices reset every 15 days) saves over ₹3 crores per quarter starting Q2; the pipeline became operational around 12 July.
- Electrode costs are falling fast: Graphite electrode prices have dropped from ~₹350–360/kg to ₹260–270/kg, and scrap is down ₹4,000–₹5,000/ton; Q2 electrode consumption costs will be lower.
- Power costs rose in Q1: Power tariffs increased by ₹0.50–₹0.60 per unit in April, adding cost pressure in the quarter just reported.
- Inventory losses will hit Q2: After two years of inventory gains that boosted EBITDA/ton, the falling-cost environment means Q2 will carry inventory losses; Q3 onwards is expected to return to normal levels.
- Full-year EBITDA/ton guided at ₹7,000–₹10,000: Management currently expects the lower end of that range; if a price increase of ₹2,000–₹4,000 per ton is achieved, the current quarter itself could reach ₹9,000–₹10,000.
- Quarterly pattern flagged: Q1 was higher than the full-year number; Q2 will be depressed by inventory losses; Q3 should be reasonably better.
Volume & Demand Environment
- Volume guidance held at ~2 lakh tons for FY24: Management stands by the 2.00–2.05 lakh ton number despite the 9% Q1 decline, which it attributes to a base effect from pulled-forward sales in Q1 FY23.
- Some sales pushed to later quarters: The global economy is suffering, and some customers who export components have dropped their usage, pushing sales into later quarters.
- Aichi volumes ramping: Current year target is 8,000–10,000 tons, building toward 25,000 tons by FY25–26.
- One shutdown already taken in June: Inventory built up from the shutdown, and quite a lot of depletion has happened since; a second shutdown is planned near November.
- Rolling mill is the bottleneck: Capacity is gradually increasing over the next 1–1.5 years, with utilization to follow over the subsequent 6 months to 1 year; peak saleable capacity by FY26 is ~230,000–240,000 tons.
Strategic Investments & Capacity Build-out
- ₹160 crores of equipment finalized: Approved by the Board, with some equipment arriving in December; the full impact on quality will be visible in FY25–26, with equipment completion by December 2024 to March 2025.
- Solar plant targets FY25–26 completion: The company will invest 26% equity in a group captive company, investing ₹20–25 crores; ~50% of power will convert to solar, cutting the carbon footprint from 0.8 to 0.5 tons per ton of steel.
- SAP implementation begins later this year: Part of the consolidation-year focus on systems and internal processes.
- Aichi process smoothing by 2024: Management expects a far smoother process with Aichi by next year, supported by the deepening partnership and Soumya Jain's Board appointment as part of the succession plan.
- PLI scheme benefit expected: ₹25–30 crores total over 4–5 years, conditional on both investment exceeding ₹100 crores and specified grade production increases being met.
- Debt equity will stay below 0.5: Currently around 0.2 and not expected to cross 0.3 in the near future.
Carbon Footprint as Competitive Moat
- Current footprint is 0.8 tons per ton of steel: Management claims competitors are at 2.5–3.0 tons, making this a structural cost and positioning advantage.
- Pathway to 0.2 tons: The plan steps down to 0.5 tons in the next two years, then to 0.2 tons thereafter, with the solar plant as a key enabler.
- European premiums expected in 2–3 years: In India, the lower footprint is expected to make Vardhman more attractive to OEs for share of business even sooner.
- Japanese OE approvals are a second differentiator: Management states that to the best of its knowledge, no other Indian company has secured a major approval from a Japanese OE for overseas business.
Sachit Jain: "Carbon footprint for most of our competitors will be between 2.5 tons to 3 tons of carbon per ton of steel, whereas in our case, it is now around 0.8 tons, 0.82 tons, and we have plans to bring it down to 0.5 tons in the next 2 years and then down to 0.2 tons."
Financial Returns & Capital Efficiency
- EBITDA on capital employed is close to 20%: Management's aspiration is to reach 25% by FY25–26, driven by volume growth, cost structure improvements, and the equipment investments flowing through.
- Fixed cost per ton is expected to remain stable or decline: As volume increases, fixed cost per ton will either remain stable or come down a bit, even with inflation.
- Other income includes pending GST refund: ₹20 crores was outstanding as of 30th June; ₹7.5 crores is under approval and not yet accounted for. Electricity duty refunds come through automatically in monthly bills.
Sachit Jain: "We will be close to that figure even this year also. And by '25-'26, we hope to improve these figures to 25%. That will be our aspiration to hit 25% number, EBITDA on capital employed."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume | ~2.00–2.05 lakh tons saleable | FY24 full year |
| EBITDA per ton | ₹7,000 to ₹10,000; currently expecting lower end | FY24 full year |
| Aichi volumes | 8,000–10,000 tons current year, scaling to 25,000 tons | FY25–26 |
| Carbon footprint | Reduce from 0.8 to 0.5 tons per ton of steel | Within 2 years |
| Solar plant | 50% of power from solar; ₹20–25 crores equity investment | End FY25–26 |
| Equipment capex | ₹160 crores; full quality impact visible | Completion Dec '24–Mar '25; impact FY25–26 |
| EBITDA on capital employed | Aspiration to reach 25% (from ~20% currently) | FY25–26 |
| Debt equity | Remain below 0.5; not cross 0.3 in near future | Ongoing |
| PLI scheme benefit | ₹25–30 crores total, conditional on investment and production | Over 4–5 years |
| Peak saleable capacity | ~230,000–240,000 tons | FY26 |
Key Metrics
| Metric | Q1 FY24 |
|---|---|
| Total volume | 47,400 tons, down 9% YoY from 52,000 tons |
| Total revenue | ₹409 cr, down from ₹469 cr YoY |
| Reported EBITDA | ₹36 cr (including other income), down from ₹51 cr YoY |
| EBITDA per ton | ~₹7,500 (per an analyst's math, adjusting for electricity incentive); full-year guidance ₹7,000–₹10,000, currently expected at lower end |
| EBITDA on capital employed | Close to 20%; aspiration to reach 25% by FY25–26 |
| Cost of materials consumed | ₹272 cr |
| Volume guidance FY24 | ~2.0–2.05 lakh tons, management stands by the number |
| Aichi export volume | 8,000–10,000 tons in FY24; target 25,000 tons by FY25–26 |
| Peak capacity post-expansion | 230,000–240,000 tons saleable quantity by FY26; melting ~250,000–260,000 tons |
| Capex for FY24 | ~₹40 cr (excluding land); ~₹90 cr if land parcels finalized |
| Equipment orders placed | ₹160 cr finalized, approved by Board; full impact expected in FY25–26 |
| Debt-to-equity ratio | ~0.2, not expected to cross 0.3 in near future |
| Carbon footprint | ~0.8–0.82 tons CO₂ per ton of steel; plan to reduce to 0.5 tons in 2 years, then 0.2 tons |
| Solar power coverage | ~50% of power requirements targeted; investment ₹20–25 cr (26% equity in group captive) |
| GAIL pipeline savings | Over ₹3 cr per quarter starting Q2 FY24 |
| PLI scheme benefit | ₹25–30 cr total over 4–5 years, contingent on >₹100 cr investment and specified grade production increases |
| Other income outstanding | ~₹20 cr as of June 30; additional ₹7.5 cr under approval, not yet accounted |