Key Takeaways
- Volume milestone, muted revenue: Volume crossed 50,000 tons for the first time, but revenue grew only 1.32% YoY in a subdued quarter affected by planned shutdowns, with some sales deferred to Q2.
- Profitability jump despite cost headwinds: EBITDA rose 31.71% and PAT was double-digit YoY, even as raw material prices climbed 8–10% during the quarter. The impact was neutralized by higher inventory valuations, but a subsequent 8–10% price drop in July creates a potential inventory loss in Q2.
- Green steel positioning is accelerating: A 55 MW solar plant deal was signed, gas costs were slashed 40–45% by switching to GAIL, and the Aichi Steel partnership is progressing with joint OEM visits to Europe, where carbon-conscious customers are showing strong interest.
- Auto demand story got a tailwind: Maruti reportedly cut its long-term EV penetration forecast from 25–30% to 15%, extending the runway for IC engine steel demand, which is Vardhman's core market.
- What to watch next quarter: Whether the July raw material price drop triggers the flagged inventory valuation loss, the outcome of price negotiations with OEMs, and how much of the deferred Q1 sales actually land in Q2.
Volume & Demand Environment
- Volume crossed a threshold: Production surpassed 50,000 tons in a quarter for the first time, and the billet capacity target of 2,60,000 MT per annum was tested and achieved in Q4 FY24 and Q1 FY25.
- Marketing quarter was subdued: Planned shutdowns pulled some sales out of Q1 and into Q2, muting the revenue print despite the volume milestone.
- Auto demand outlook is firming: Management cited broad-based strength across two-wheelers, three-wheelers, four-wheelers, commercial vehicles and passenger vehicles, giving confidence that steel requirements will rise. Maruti's expansion plans and potential doubling of capacity by 2030, plus Hyundai and Chinese manufacturer entry, underpin the optimism.
- EV risk is receding, not growing: Maruti's internal conference indicated EV penetration may reach only 15%, down from earlier estimates of 25–30%, as hybrid engines gain preference. That keeps IC engine demand intact and removes a major structural overhang for Vardhman's product mix.
- Export markets are mixed: Thailand is currently subdued but demand is expected to pick up. Europe is seen as a big potential opportunity, particularly for green steel, following a senior team visit with Aichi representatives to major European OEMs.
R. K. Rewari: "we had a conference our team attended with Maruti, which they have shared that maybe in the things to come the EV penetration, which was envisaged at 30% or 25%, will be about 15%. So, that looks good for IC engine, that we see demand will remain the same."
Margins & Cost Structure
- EBITDA per ton guidance held firm: Management reiterated the FY25 range of ₹7,000 to ₹10,000 per ton and expects to be well within it for the full year. After the ongoing capex is in place, the range is expected to step up to ₹8,000 to ₹11,000 per ton.
- Raw material price whiplash: Prices rose 8–10% during Q1, but because Vardhman's pricing is quarter-to-quarter stable, the P&L impact was neutralized by higher inventory valuations. Prices then fell 8–10% in July and have stayed there, creating a potential inventory valuation loss that will hit Q2.
- Power and fuel cost is sustainable: The ₹44 crore quarterly run-rate is considered maintainable at current production levels, helped by the highest-ever billet production and a fuel cost decline that offset a 3% power tariff increase effective 15 June.
- Gas cost slashed: Switching supply from THINK Gas to GAIL reduced gas pricing by approximately 40–45%, a structural cost improvement.
- Graphite electrode prices stable: No increase for the last two quarters, removing a source of margin pressure.
- Inventory build is temporary: Inventory rose ₹62 crores as stock was built ahead of planned shutdowns; this will be consumed once shutdowns conclude.
- Cost competitiveness of the EAF route: Blast furnace producers enjoy a ₹6,000–8,000 per ton cost advantage, but the electric arc furnace route is far less capital intensive, making RoCE comparable or even better. Realization is not materially different between the two routes because OEM price changes apply industry-wide.
Sanjeev Singla: "for the full year we will be well within the range of this stated range of Rs.7,000 to Rs.10,000 a ton."
Green Steel & Sustainability
- Solar power plant signed: A purchase agreement for a 55 MW solar power plant was executed, with commissioning expected by March 2025. This will bring CO2 emissions below 0.45, reinforcing Vardhman's already significant carbon advantage: its EAF-based emissions are roughly one-fourth of blast furnace competitors.
- Europe opportunity is real and carbon-driven: A senior team, joined by Aichi representatives, visited Europe and met major OEMs. The focus on carbon footprints and green steel in that market was identified as a big potential demand driver.
- Green steel margin expectations are measured: Management does not expect an immediate margin uplift from green steel. Over time, OEM sensitivity to carbon is expected to yield either better margins or, at minimum, better volumes and preferred supplier status.
- Circular economy initiative underway: Vardhman is spearheading a program with a major OEM to take back that customer's scrap, process it into steel, and supply the finished steel back to the same OEM, closing the loop.
- Miyawaki forest: The CSR team has developed approximately 15 acres of forest under the guidance of Vice Chairman Sachit Jain.
Sanjeev Singla: "We are into the electric arc furnace production facility as against our competitors who are mostly into the blast furnace. So, going forward because of the lower carbon emissions we are having an edge over our competitors that currently we are almost one- fourth in terms of CO2 emissions as against our competitors."
Strategic Partnerships & Competitive Position
- Aichi Steel cooperation is deepening: Three Aichi representatives are now stationed at Vardhman's works, and activities are progressing positively. The partnership extends to joint market development, as seen in the Europe OEM visit.
- Competitive moat rests on three pillars: Management pointed to the Vardhman Group's established reputation, Aichi's technical know-how and stakeholding, and Vice Chairman Sachit Jain's ability to connect with stakeholders across the value chain.
- R&D investment is rising: A new block for metallurgists has been constructed, sophisticated lab equipment including a high-end microscope is being added, and investment in non-destructive testing lines is planned.
- Scrap sourcing strategy is evolving: Around 80% of scrap is recycled, largely sourced domestically, with 5–10% imported shredded scrap depending on availability and price. Management acknowledged the need to strategize for consistent scrap supply arrangements in the near future.
- Anti-dumping duty has no direct impact: Vardhman's operations are not linked to or affected by anti-dumping duty measures.
R. K. Rewari: "I think we belong to a well-established group which is Vardhman group number one. Number two, we have association with Aichi with our stakeholders now in our company plus they are providing us technical knowhow. We have a very forward-looking Vice Chairman, Mr. Sachit Jain, who has intellectual ability to connect with the various stakeholders in time."
Capex & Capacity Expansion
- Kocks block and re-heating furnace on track: The ongoing project will add approximately 18,000 tons per annum of capacity once complete.
- Two major shutdowns planned: A seven-day shutdown in July and a two-to-two-and-a-half-week shutdown in Q3 or Q4 of this fiscal year will support the expansion work.
- Greenfield plant still under discussion: No final decision has been taken on a new greenfield facility.
- Debt-equity expected to remain low: The ratio is expected to stay close to 0.12, supported by savings and reductions in working capital.
- Current focus remains automobile: Unless a larger expansion plan is undertaken, the product mix and customer mix will stay concentrated on the auto sector.
Pricing & Raw Material Dynamics
- OEM price negotiations are in tension: Vardhman is asking for a price increase while OEMs are pushing for a decrease. Management declined to quantify the expected outcome, calling it inappropriate to share a number while negotiations are live.
- Price outlook is range-bound: Steel prices are expected to remain in the vicinity of current levels, moving perhaps a couple of thousand rupees up or down, and will be influenced by raw material price movements.
- Raw material availability may tighten: Management flagged that scrap availability could come under some pressure and expressed hope for government support.
- Import duty relief is minor: Some customs duty relief was granted on ferro nickel and a few minor inputs. The benefit is very small and not game-changing, though management is hopeful nickel prices may ease slightly.
- Budget impact is muted: Beyond the minor import duty benefit, tax relief for the middle class was noted as a potential indirect positive if it spurs consumption of motorcycles and cars.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Annual volume | 2,10,000 tons (vs 1,95,000 tons in FY24) | FY25 |
| EBITDA per ton | ₹7,000 to ₹10,000 per ton | FY25 |
| EBITDA per ton (post-capex) | ₹8,000 to ₹11,000 per ton | FY26 onwards |
| Solar power plant | 55 MW plant commissioned, CO2 emissions below 0.45 | By March 2025 |
| Kocks block capacity addition | ~18,000 tons per annum added | On plan, during FY25 |
| Debt-equity ratio | Remain close to 0.12 | Going forward |
| Planned shutdowns | Seven days (July) and two to two-and-a-half weeks (Q3/Q4) | FY25 |
Key Metrics
| Metric | Q1 FY25 |
|---|---|
| Revenue | ₹415.78 cr, +1.32% YoY |
| EBITDA | ₹48 cr, +31.71% YoY |
| PAT | ₹26.08 cr, double-digit growth YoY |
| EBITDA per ton | ₹7,000–₹10,000 (FY25 guidance range); next year ₹8,000–₹11,000 after capex |
| Sales volume | 50,298 MT |
| Realization | ₹82,000 per ton |
| Annual volume target | 2,10,000 tons (FY25), vs 1,95,000 tons achieved in FY24 |
| Billet capacity | 2,60,000 tons per annum, tested and achieved in Q4 FY24 and Q1 FY25 |
| Rolling production (in-house + outsourced) | 55,000–57,000 tons in Q1, vs sales of 50,000 tons; balance built inventory |
| Outsourced rolling volume | ~4,000 tons per month, up from ~2,000 tons previously |
| Inventory increase | ₹62 cr in Q1, driven by pre-shutdown stock build |
| Debt-equity ratio | 0.12 |
| Power and fuel cost | ₹44 cr in Q1; sustainable at current production level, subject to 3% annual tariff increase from 15-Jun-2024 |
| CO2 emissions | 0.73 tons per ton of steel; expected below 0.45 after 55 MW solar plant commissioned by Mar-2025 |
| Exports (incl. indirect via Aichi) | ~10% of total sales |