Key Takeaways
- Record volume, opportunistic mix: Quarterly sales hit a record 59,000 tonnes, but the mix included zero-margin billet sales and lower-margin non-regular orders taken to test higher melting capacity during an auto slowdown.
- OE breakthrough, margin promise: The company won direct Tier-1 supply approval at a large auto OEM, replacing Japanese imports. While the volume is small, management says margins will improve and prestige is high.
- Greenfield plant talks turn serious: Discussions with Japanese partners Aichi on costs, layout and product mix have begun, with a final announcement expected mid-next year. A capital infusion is planned in the next year or two.
- Near-term margin pressure, medium-term lift: OEs pressed for a larger price reduction than warranted, and raw material costs rose on mix and inventory losses. Management still expects the post-CAPEX EBITDA per tonne range to lift to ₹8,000–₹11,000.
- What to watch next quarter: The pace of receivables normalization after a temporary spike to 64 days, the volume impact of the one-month shutdown for Kocks Block installation, and any further progress on the European OE approval.
Volume & Mix: The Record Quarter Under the Hood
- Record sales, tested capacity: 59,000 tonnes was the highest-ever quarterly sale, achieved by testing melting capacity at 285,000 tonnes. The company now believes it can reach 300,000 tonnes of melting capacity with further trials.
- Billet sales were a zero-margin capacity test: 2,600 tonnes of billets were sold purely to test the higher melting limit. This is not a regular part of the plan and carries almost no margin.
- Non-regular orders filled the demand gap: Volume growth exceeded the auto industry because the company took non-regular orders at lower margins to utilize the tested higher capacity. This is temporary and not the regular product mix.
- Receivables stretched to keep volumes moving: Receivable days rose from ~58 to 64 days because, to maintain volumes during the auto slowdown, the company sold to non-strategic customer segments with higher outstandings. Management expects a return to normal levels when regular markets pick up.
- H2 volumes will dip on planned shutdown: H2 FY25 sales will definitely be lower than H1 because of a roughly one-month shutdown for the Kocks Block installation. The block is expected to be ready by August next year.
Sachit Jain: "You cannot go faster than that. In the existing plant, we are continuously increasing our capacity by debottlenecking, by taking trials and testing."
Customer & Product: The OE Inflection
- Direct Tier-1 supply win: The company received approval to replace Japanese imported steel from Sanyo and Daido and become a direct Tier-1 supplier to a large auto OEM. Previously, it was only a Tier-1 or Tier-2 supplier. This is a unique case where the OE has its own gear shop.
- Second Japanese OEM in play: The company is working with another Japanese OEM in India to replace steel coming from Japan.
- European OE at advanced stages: Approval discussions are at an advanced stage with a European OE for supply of steel for very specialized projects.
- Four-wheeler mix ambition: The company wants to move its four-wheeler business from 38% to 50% of the total.
- OE direct supply is small but high-prestige: Management acknowledged that very few OEs have their own gear making, so the percentage of direct OE sales will remain very small. However, from a prestige point it is very high and margins will improve.
Sachit Jain: "We will be replacing direct Japanese steel, which is coming from Sanyo and Daido, so we will be replacing that. We are working with another Japanese OE in India to replace steel coming from Japan."
Margins: Current Pressure, Future Levers
- Price reduction hit Q2 margins: OEs pressed for a higher reduction than what was due, driven by lower prevailing steel prices and sentiment from China and global commodity prices. The reduction was ~₹1,500 per tonne, still within the normal range.
- Raw material cost moved against steel prices: Raw material cost per tonne rose despite decreasing steel prices because of a changing mix, inventory valuation losses from falling prices, and divergent price movements across components.
- Multiple levers for EBITDA per tonne improvement: The solar plant commissioning, bringing outsourced job work in-house (currently ₹9 crores per quarter), yield improvements from bigger billet size, and the Kocks Block are all expected to contribute. The Kocks Block may bring cost savings, inventory reduction and yield improvements, but these must be trialed and cannot be committed.
- Post-CAPEX range lifted: Management expects the EBITDA per tonne range to move up from ₹7,000–₹10,000 to ₹8,000–₹11,000 after the current CAPEX cycle, with further guidance after consolidation. The aspirational target is ₹10,000–₹12,000 in the next three or four years.
- Solar plant to contribute from April: The solar JV with Amarenco (company owns 26%) is expected to be commissioned by March, with benefits flowing from April onwards with no stabilizing period.
Capacity Expansion: The Next Growth Platform
- Greenfield plant talks are now serious: Discussions on costs, layouts, machinery selection and product mix have begun with Japanese partners Aichi. A final announcement is expected sometime in the middle of next year.
- New plant will be a step-change: The new plant will come up with a capacity of 350,000 tonnes, a sudden jump from the existing plant's trajectory. The company expects to be ready to announce next year.
- Existing plant still has headroom: The team is working to test and consolidate at 300,000 tonnes of melting capacity. If successful, environmental approval will be sought for more than 300,000 tonnes. The rolling mill expansion, once complete, should support 250,000 tonnes of saleable material, with a path to 270,000 tonnes of rolled product by September next year.
- Capital infusion planned: In the next year or two, there will be some capital infusion in the company. Fundraising plans will be announced as the project is announced. The debt-to-equity target is to remain below 0.5:1.
- Forging plant not imminent: There is nothing on the anvil immediately for a forging plant with Japanese partners; decision-making takes its own time.
Sachit Jain: "I think we will be ready to make a final announcement sometime in the middle of next year, but that's the thinking as of now."
Market Context & Sustainability
- Domestic auto market is patchy: Commercial vehicles are not doing well, cars are flattish, tractors are slow. Two-wheelers and motorcycles are doing well. Exports are also affected.
- Export headwinds from China and Japan: Chinese dumping is keeping prices low, and a weaker Japanese currency is reducing the cost advantage for buying from India. The company still aims to eventually move exports to 20% of revenue, gradually progressing into Southeast Asia.
- Green steel demand signal is real: Indications from auto OEM sustainability teams are high. The company expects to start seeing big signs translating into business results in the next year or two. Its carbon footprint will be at 0.45 versus a 2.2 norm, making it a beneficiary of any government carbon trading scheme.
- Market outlook tied to geopolitics: Management expressed hope that with the change in US administration, if the war stops and mood changes next year, the situation will be much brighter. The company says it is ready with capacity expansion.
Sachit Jain: "with Trump coming in, hopefully if the war stops and the mood starts changing next year sometime, we will see a much brighter situation."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY25 volume | ~210,000 tonnes; may go a little lower | FY25 |
| H2 FY25 sales | Definitely lower than H1 due to ~one-month shutdown for Kocks Block installation | H2 FY25 |
| Kocks Block ready | Installation complete and operational | By August next year |
| Post-CAPEX EBITDA per tonne range | Move from ₹7,000–₹10,000 to ₹8,000–₹11,000 | After current CAPEX cycle consolidation |
| Aspirational EBITDA per tonne | ₹10,000–₹12,000 | In the next three or four years |
| Solar plant commissioning | Commissioned and benefits flowing | By March; benefits from April |
| Rolling mill capacity | 270,000 tonnes of rolled product | By September next year |
| Greenfield plant final announcement | Concrete announcement on new plant | Middle of next year |
| Capital infusion | Some capital infusion in the company | In the next year or two |
| Debt-to-equity | Remain below 0.5:1 | Ongoing target |
| Receivable days | Return to normal levels | When regular markets pick up |
| Export revenue share | Move to 20% of revenue | Gradual, no fixed date |
| Four-wheeler business share | Move from 38% to 50% | No fixed date |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Sales volume | 59,000 tonnes, highest ever quarterly sales |
| Revenue | Not stated |
| EBITDA per tonne | ₹7,000 to ₹10,000 range; Q2 margins lower than Q1 due to ₹1,500 per tonne price reduction from 1st July |
| EBITDA per tonne guidance post-expansion | ₹8,000 to ₹11,000 range expected after Kocks Block and reheating furnace CAPEX consolidation; aspirational target of ₹10,000 to ₹12,000 |
| Aspirational EBITDA target | Around ₹250 crores, management aspiration, not formal guidance |
| Volume guidance FY25 | About 2.1 lakh tonnes (210,000 tonnes), may go a little lower |
| Tested melting capacity | 285,000 tonnes, enabling 250,000 tonnes of saleable material once rolling mill expansion complete |
| Post-expansion rolling capacity | 300,000 tonnes billet input, yielding 275,000 tonnes rolled product, translating to 268,000–270,000 tonnes saleable material, expected by September next year |
| Kocks Block and reheating furnace CAPEX | ₹160 crores |
| Ongoing existing plant CAPEX | ₹300-odd crores |
| Job work cost (outsourced rolling) | ₹9 crores in Q2 |
| Billet sales | ~2,600 metric tonnes, almost zero margin, opportunistic |
| Receivable days | 64 days, up from ~58 days in FY24 due to temporary shift to non-strategic customers |
| Bright bars share of sales | Roughly 20% of total sales |
| Exports share of revenue | Roughly 5% to 7%, target to eventually move to 20% |
| Four-wheeler business share | 38%, target to move to 50% |
| Top 10 customers revenue contribution | Around 35% to 40% |
| Solar plant capacity | 55 megawatts, to provide roughly 45% of total power consumption, expected commissioning by March 2025 |
| Carbon footprint | 0.45 tonnes of carbon per tonne of steel expected, versus norm limit of around 2.2 tonnes |
| Working capital borrowing cost | Around 7.5%; term loans around 8% |
| Target debt-to-equity ratio | Below 0.5:1, in any case below 1:1 |