Indsil Hydro Power & Manganese Ltd is fundamentally a ferro alloy manufacturer whose survival has depended on owning its own power source - a 21 MW hydroelectric plant in Kerala that feeds its smelters, insulating it from grid-price shocks that have crippled competitors. The company was incorporated in 1990 and began production in 1994, building an integrated model where the manganese smelter and the hydro station are locked together: the power plant’s entire output is consumed by the furnaces, and the furnaces are completely dependent on that captive power to remain profitable. After a punishing stretch that included Kerala floods, an industry downturn, COVID lockdowns, and accounts turning non-performing with its banks, the company restructured its debt and then sold its stake in an Oman joint venture in 2024 - a transaction that made it 100% debt-free and cleared the way for a strategic pivot.
Business segments
Two engines, one feeding the other - a captive hydro plant whose every unit of electricity is consumed by the ferro alloy smelters it was built to serve, together forming a single integrated production chain.
1. Ferro Alloys: the smelting business that carries the company
The company makes silico manganese - a hardening ingredient for steel - in two furnaces, and every tonne sold is a tonne whose power cost is shielded from the grid.
- Two smelters, one product - the company operates a smelter in Palakkad, Kerala (Unit I) and one in Vizianagaram, Andhra Pradesh (Unit II), both producing high carbon silico manganese for steelmakers in Europe, China and the Indian domestic market. A third unit in Raipur, Chhattisgarh was sold in 2021 after global recession and stoppages made it unviable.
- Power is the make-or-break input - the Vizianagaram unit has been repeatedly shut down and restarted because electricity tariffs set by the Andhra Pradesh distribution company made operations uneconomical; a 50 percent power cut in April 2022 and an additional duty of 94 paise per kilowatt-hour both hit profitability directly. The company upgraded the unit’s receiving substation from 33 kV to 132 kV in April 2026, which points to an effort to stabilise supply.
- In-house process know-how - the company has developed its own raw-material feeding and furnace-stoking systems, and its R&D effort has produced better-grade alloys with critical specifications that customers require. A Metal Recovery Plant at the Palakkad site was recently expanded to squeeze more value from the production process.
- Volume over price in a tough market - the manganese alloy industry in India suffers from overcapacity and a slowdown in exports, so price realisation is a persistent challenge; the company’s response is to focus on optimal capacity utilisation rather than chasing higher margins. In FY25, the segment produced 17,894 metric tonnes and sold 17,816 metric tonnes.
2. Hydro Power: the captive electricity backbone
A 21 MW hydro plant in the Idukki hills generates power that never reaches the open market - it is consumed entirely by the company’s own smelters, making it a cost shield rather than a standalone business.
- Built to serve the furnaces - the plant in Idukki District, Kerala was constructed on a 30-year Build, Own, Operate and Transfer (BOOT) arrangement, and under the agreement it must be handed over to the Kerala State Electricity Board free of cost around July 2030. Every unit generated is booked as inter-segment revenue and consumed by the smelter segment.
- Regulatory overhang - the company faces a contingent liability of Rs. 6,209 lakhs in a High Court case over electricity duty levied on self-generation between 2005 and 2015, though it has obtained a stay. A separate dispute with the Kerala State Electricity Board over electricity charges is also pending in the Kerala High Court.
Group structure and partners
A promoter-controlled company that has shed its overseas ventures and is now debt-free, with a newly incorporated subsidiary signalling a pivot into real estate and infrastructure.
- Tight promoter hold - the holding company Sunmet Holdings India Private Limited owned 50.11% of equity as of March 2025, and the promoter group collectively held 62.81%, with Crosimn Agencies Private Limited and individual family members holding the rest.
- Overseas entities wound down - two wholly owned subsidiaries in the Sharjah free zone, both providing business consultancy services, were permanently closed - one in March 2022 and the other in December 2023 - because they had no business operations.
- The Oman exit that cleared the decks - the company held a 50% stake in Al-Tamman Indsil Ferro Chrome LLC, a ferro chrome manufacturer in Oman that commissioned a 25 MW captive solar plant in 2020. The entire stake was sold to Austrian buyers in May 2024 for a total consideration of USD 38 million, of which the company’s share was 50%, making it 100% debt-free.
- A new direction - in September 2025 the board approved incorporating a wholly owned subsidiary, Indsil Infrastructure Limited, to engage in real estate and infrastructure development, described as a diversification in line with long-term strategic plans; the certificate of incorporation was issued in October 2025.