For nearly a century, Hindustan Construction Company (HCC) has been one of India’s most prolific builders of the difficult and the large-scale - the dams, nuclear reactors, tunnels and bridges that underpin the country’s physical economy. Founded in 1926 by Seth Walchand Hirachand, the company has constructed 60% of India’s nuclear power capacity and roughly a quarter of its hydro power, and it now operates with a radically lighter balance sheet after carving out most of its old debt and disputed claims into a separate resolution vehicle. The recurring approach is to bid for technically demanding government-funded EPC (engineering, procurement and construction) contracts where its century of experience and specialised heavy-civil skills narrow the field of competitors, then execute the work itself rather than subcontracting the hard parts.
Business segments
Two engines at different stages - a core engineering and construction business that builds India’s most complex public infrastructure, and a lean concessions arm that collects residual income from toll roads it once built and owned.
1. Engineering & Construction: the heavy-civil backbone
HCC wins and builds large, technically complex public-works contracts - mostly transport, hydro and nuclear - where its century of on-the-ground experience and self-performance of the hardest civil works keep competitors at bay.
- Self-performs the difficult work - the company does its own tunnelling (using both tunnel-boring machines and drill-and-blast), dam concreting, powerhouse excavation and nuclear-facility construction rather than outsourcing these to subcontractors, which gives it direct control over quality and cost on the riskiest parts of a job.
- Nearly all clients are government - historically close to 100% of the order book has come from government entities, so the business is built on competitive bidding for publicly funded infrastructure.
- Order book gives two to three years of visibility - the backlog stood at roughly ₹13,000 crore as of the fourth quarter of FY26, equivalent to about 2.8 times annual construction income, with transport making up two-thirds of that and hydro another 18%.
- Price-escalation clauses protect margins - most contracts include provisions that adjust payments when input costs rise, which, together with low reliance on subcontractors, has helped improve operating margins.
2. Infrastructure concessions: the residual toll-road income
HCC no longer builds and holds toll roads; it sold its two big highway assets and now collects a revenue share from the buyer for the life of the concessions, with no debt left in the concessions arm.
- Built, operated and sold two West Bengal highways - the Farakka-Raiganj and Baharampore-Farakka roads, covering roughly 200 km of the busy NH-34 corridor, were developed under 25-to-30-year concessions with the National Highways Authority and then sold to Cube Highways, a Singapore-based infrastructure investor, in 2020 and 2023 respectively.
- The concessions arm is now debt-free - HCC Infrastructure Company Ltd, which absorbed the group’s other concession and power subsidiaries in a 2023 merger, carries no debt, so the residual income flows through with no interest burden.
Group structure and partners
HCC is a listed Indian parent with a Swiss real-estate development subsidiary, a debt-free concessions arm, and a separate resolution vehicle that holds most of its legacy debt and disputed claims.
- The parent is listed in Mumbai - Hindustan Construction Company Ltd trades on the BSE and NSE, with Arjun Dhawan as Vice Chairman and Managing Director and Ajit Gulabchand as Chairman.
- Steiner AG is the Swiss real-estate developer - this wholly owned Zurich-based subsidiary develops large urban districts and residential projects in Switzerland, and in early 2024 it sold its construction-contracting arm to focus purely on development, leaving it with a portfolio worth more than CHF 6 billion.
- Prolific Resolution Private Limited holds the carved-out debt - under a debt-resolution plan, HCC transferred roughly ₹2,854 crore of borrowings and ₹6,508 crore of arbitration awards and claims into this special-purpose vehicle; HCC’s exposure is now capped at 20% of that debt, or about ₹571 crore, with repayment starting in September 2026.
- Strategic partnerships extend the reach - a 2025 memorandum of understanding with Konkan Railway Corporation pairs HCC’s civil construction with a rail-systems operator to bid for integrated metro and railway projects, while a 50:50 joint venture with Tata Projects is building a 1,000 MW pumped-storage hydro plant for Tata Power in Maharashtra.