Pace Digitek is an infrastructure platform that builds the physical backbone for India’s telecom and renewable-energy rollout - it makes the power systems that keep mobile towers running, the battery-storage containers that stabilise solar grids, and then installs and maintains both. It was founded in 2007 by a telecom-and-energy technocrat and transformed in 2014 by buying GE’s Indian power-electronics business, which gave it the manufacturing DNA it still relies on. The recurring approach is vertical integration: the company controls the chain from raw cell to finished container, from factory to field, so it can offer a complete solution rather than just a component.
Business segments
Three engines at different stages - a telecom-infrastructure workhorse that built the base, a battery-storage platform scaling at national speed, and a project-development arm that turns those batteries into long-duration annuity assets - each fed by the cash flows and field teams of the one before.
1. Telecom and ICT infrastructure: the original execution engine
A pan-India field force erects towers, strings fibre and powers mobile networks for the country’s largest operators and state-owned enterprises - this is the business that built the company’s reach.
- Makes the power, not just the tower - the company manufactures DC power systems for telecom towers (7,877 units in FY26) at two factories in Kumbalgodu, Karnataka, a capability that started with the 2014 acquisition of GE’s Lineage Power brand.
- Builds the physical network - it erected 1,035 new telecom towers and laid 2,109 km of optical fibre cable in FY26, then commissions the power equipment (1,297 units) and stays on for operations and maintenance.
- Railways are a second anchor - the company has won orders for Kavach train-protection systems and CCTV deployment across railway coaches, tapping into the government’s railway-modernisation budget.
- Repeat customers, low acquisition cost - longstanding relationships with BSNL, Reliance, Tata Teleservices and RailTel mean the order book (Rs. 24,839 Mn, or about 22% of the group total) is largely replenished by existing clients.
2. Energy: the battery-storage factory that is scaling to 10 GWh
The company builds grid-scale battery containers from cell to finished system in its own factory - it delivered a record 178 containers in FY26 and is racing to quadruple capacity by October 2026.
- Cell-to-container in one roof - imported LFP cells are assembled into packs, packs into racks, and racks into 20-foot containers using automated lines; the company even fabricates the steel containers in-house to cut logistics costs.
- Already at 2.5 GWh, heading to 10 - the Bidadi plant ran at roughly 80% utilisation in FY26; a second 2.5 GWh line was nearing commissioning by June 2026, and orders for a further 5 GWh of production lines are placed, targeting 10 GWh operational by October 2026.
- A complete ecosystem, not just boxes - the BESS (Battery Energy Storage System) offering includes in-house Power Conversion Systems and Energy Management Systems, supported by around 200 field engineers, so the customer gets a working grid asset rather than a pile of batteries.
- Cells sourced with long-term cover - subsidiary Lineage Power signed a master supply agreement with China’s RJE Tech for 3 GWh of 314Ah LFP prismatic cells, locking in pricing, warranties and technical collaboration.
- The order book is the largest in the country - energy contracts stood at Rs. 88,540 Mn (about 78% of the group order book) as of May 2026, spanning utility-scale customers like SECI, NTPC and MAHAGENCO, plus the first private-sector win from L&T for 250 MWh.
3. Build-Own-Operate: the annuity engine inside the energy segment
Half the energy order book is structured as BOO projects - the company builds the battery asset, keeps it on its own books, and collects a monthly lease payment for the life of the contract.
- An infrastructure owner, not just a contractor - under the Build-Own-Operate model, Pace Digitek creates the BESS asset through a subsidiary and recognises recurring lease income; in FY26 that lease income was Rs. 5,578 Mn.
- The maths is visible - a BOO project costs roughly Rs. 1.25-1.3 crores per GWh to build, earns an annuity of Rs. 2.19-2.55 lakhs per MW per month, and typically receives Viability Gap Funding of about Rs. 27 lakhs per MWh.
- A pipeline of 2.72 GWh - the executable BOO project pipeline means these recurring revenues have a multi-year runway already contracted, with the MSEDCL project structured through a dealer-lessor model under accounting standards.
Group structure and partners
A web of purpose-built subsidiaries separates manufacturing, project execution and asset ownership, while an exclusive Africa pact opens an export channel.
- Lineage Power is the manufacturing heart - this material subsidiary runs the BESS factory and holds the cell-supply agreement with RJE Tech.
- Project companies ring-fence the assets - Pace Renewable Energies handles BESS projects; Transgreenx Energy (incorporated November 2025) acts as an asset-holding and development company for BOO and PPP projects; and Pace Ecoplanet Solace was created as an SPV specifically for the MSPGCL order, with Pace Digitek holding 60%.
- A defence offshoot for EMI/EMC equipment - Lineage Defence and Aerospace was incorporated in December 2025 to manufacture electromagnetic interference and compatibility equipment for the defence sector, housed at the Bidadi industrial area.
- Africa go-to-market via NEC XON - an exclusivity agreement signed in April 2026 gives the South African firm NEC XON the rights to market and distribute Pace Digitek’s BESS products across five southern African countries, with Pace Digitek focusing on manufacturing and supply.